ML16257A136: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16257A136
| number = ML16257A136
| issue date = 08/25/2016
| issue date = 08/25/2016
| title = Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 15.6, Figures 15.6-1 Through 15.6-241
| title = Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 15.6, Figures 15.6-1 Through 15.6-241
| author name =  
| author name =  
| author affiliation = Entergy Operations, Inc
| author affiliation = Entergy Operations, Inc
Line 21: Line 21:
Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Power vs. Time Figure15.6-1a Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Average Heat Flux vs. Time Figure15.6-1b Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Pressure vs. Time Figure15.6-1c   
Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Power vs. Time Figure15.6-1a Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Average Heat Flux vs. Time Figure15.6-1b Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Pressure vs. Time Figure15.6-1c   


Revision 304 (06/10)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Minimum DNBR vs. Time Figure 15.6-1d Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Temperatures vs. Time Figure15.6-1e Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Pressurizer Level vs. Time Figure15.6-1f Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Steam Generator Pressure vs. Time Figure15.6-1g Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Break Flow vs. Time Figure15.6-1h Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Integrated Break Flow vs. Time Figure15.6-1i WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Revision 304 (06/10)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Minimum DNBR vs. Time Figure 15.6-1d Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Temperatures vs. Time Figure15.6-1e Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Pressurizer Level vs. Time Figure 15.6-1f Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Steam Generator Pressure vs. Time Figure15.6-1g Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Break Flow vs. Time Figure15.6-1h Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Integrated Break Flow vs. Time Figure 15.6-1i WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figures 15.6-2 through 15.6-31 have been intentionally deleted. (DRN 05-543, R14)
Figures 15.6-2 through 15.6-31 have been intentionally deleted. (DRN 05-543, R14)
THISFIGURE INTENTIONALLY DELETED REVISION 5 Waterford Steam Electric Station Figure15.6-32 THIS FIGURE INTENTIONALLY DELETED REVISION 5 Waterford Steam Electric Station Figure15.6-33 THISFIGURE INTENTIONALLY DELETED REVISION 5 IIIWaterford Steom Electric Station Figure15.6-34 THISFIGURE INTENTIONALLY DELETED REVISION 5 Woterford Steam Electric Station 3Figure15.6-35 Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Power vs. Time Figure15.6-35A Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Heat Flux vs. Time Figure15.6-35B WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
THIS FIGURE INTENTIONALLY DELETED REVISION 5 Waterford Steam Electric Station Figure 15.6-32 THIS FIGURE INTENTIONALLY DELETED REVISION 5 Waterford Steam Electric Station Figure 15.6-33 THIS FIGURE INTENTIONALLY DELETED REVISION 5 I I I Waterford Steom Electric Station Figure 15.6-34 THIS FIGURE INTENTIONALLY DELETED REVISION 5 Woterford Steam Electric Station 3 Figure 15.6-35 Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Power vs. Time Figure 15.6-35A Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Heat Flux vs. Time Figure 15.6-35B WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-35C has been deleted. (DRN 05-543, R14)
Figure 15.6-35C has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Pressure vs. Time Figure15.6-35D WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Pressure vs. Time Figure15.6-35D WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Line 31: Line 31:
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Pressurizer Water Volume vs. Time Figure15.6-35H   
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Pressurizer Water Volume vs. Time Figure15.6-35H   


Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Inventory vs. Time Figure 15.6-35I  
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Inventory vs. Time Figure 15.6-35I WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
 
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-35J has been deleted. (DRN 05-543, R14)
Figure 15.6-35J has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Pressure vs. Time Figure15.6-35K Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Feedwater Flowrate per SG vs. Time Figure15.6-35L WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Pressure vs. Time Figure 15.6-35K Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Feedwater Flowrate per SG vs. Time Figure15.6-35L WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-35M has been deleted. (DRN 05-543, R14)
Figure 15.6-35M has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Primary-to-Secondary Leak Rate vs. Time Figure15.6-35N WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Primary-to-Secondary Leak Rate vs. Time Figure15.6-35N WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-35O has been deleted. (DRN 05-543, R14)
Figure 15.6-35O has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Liquid Mass vs. Time Figure15.6-35P Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Steam Mass Through ADVs vs. Time Figure15.6-35Q Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Primary-to-Secondary Leak Flow vs. Time Figure15.6-35R   
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Liquid Mass vs. Time Figure 15.6-35P Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Steam Mass Through ADVs vs. Time Figure15.6-35Q Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Primary-to-Secondary Leak Flow vs. Time Figure15.6-35R   


Revision 304 (06/10)Waterford Steam Electric Station #3 SGTR with LOOP Minimum DNBR vs. Time Figure 15.6-35S  
Revision 304 (06/10)Waterford Steam Electric Station #3 SGTR with LOOP Minimum DNBR vs. Time Figure 15.6-35S WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
 
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figures 15.6-36 through 15.6-91 have been intentionally deleted. (DRN 05-543, R14)  
Figures 15.6-36 through 15.6-91 have been intentionally deleted. (DRN 05-543, R14)  


Line 61: Line 57:
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-99   
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-99   


Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Peak Cladding Temperature Figure 15.6-100  
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Peak Cladding Temperature Figure 15.6-100  


Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Mid Annulus Flow Rate Figure 15.6-100a  
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Mid Annulus Flow Rate Figure 15.6-100a  
Line 85: Line 81:
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Bulk Channel Flow Rate Figure 15.6-100k  
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Bulk Channel Flow Rate Figure 15.6-100k  


Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Core Power Figure 15.6-101  
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Core Power Figure 15.6-101  


Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-102  
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-102  


Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Leak Flow Rate Figure 15.6-103  
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Leak Flow Rate Figure 15.6-103  


Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-104  
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-104 WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
 
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-105 has been deleted. (DRN 05-543, R14)  
Figure 15.6-105 has been deleted. (DRN 05-543, R14)  


Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Quality Figure 15.6-106  
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Quality Figure 15.6-106  


Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Containment Pressure Figure 15.6-107  
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Containment Pressure Figure 15.6-107  


Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break  Mass Added to Core During Reflood Figure 15.6-108  
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break  Mass Added to Core During Reflood Figure 15.6-108  


Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Peak Cladding Temperature Figure 15.6-109  
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Peak Cladding Temperature Figure 15.6-109 WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109a has been intentionally deleted.
(DRN 06-1062, R15)


WSES-FSAR-UNIT-3 Revision 15 (03/07)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
(DRN 06-1062, R15)
Figure 15.6-109a has been intentionally deleted.  
Figure 15.6-109b has been intentionally deleted.
(DRN 06-1062, R15)
(DRN 06-1062, R15)


WSES-FSAR-UNIT-3 Revision 15 (03/07)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
(DRN 06-1062, R15)
Figure 15.6-109b has been intentionally deleted.  
Figure 15.6-109c has been intentionally deleted.
(DRN 06-1062, R15)
(DRN 06-1062, R15)


WSES-FSAR-UNIT-3 Revision 15 (03/07)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
(DRN 06-1062, R15)
Figure 15.6-109c has been intentionally deleted.  
Figure 15.6-109d has been intentionally deleted.
(DRN 06-1062, R15)
(DRN 06-1062, R15)


WSES-FSAR-UNIT-3 Revision 15 (03/07)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
(DRN 06-1062, R15)
Figure 15.6-109d has been intentionally deleted.  
Figure 15.6-109e has been intentionally deleted.
(DRN 06-1062, R15)
(DRN 06-1062, R15)


WSES-FSAR-UNIT-3 Revision 15 (03/07)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
(DRN 06-1062, R15)
Figure 15.6-109e has been intentionally deleted.  
Figure 15.6-109f has been intentionally deleted.
(DRN 06-1062, R15)
(DRN 06-1062, R15)


WSES-FSAR-UNIT-3 Revision 15 (03/07)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
(DRN 06-1062, R15)
Figure 15.6-109f has been intentionally deleted.  
Figure 15.6-109g has been intentionally deleted.
(DRN 06-1062, R15)
(DRN 06-1062, R15)


WSES-FSAR-UNIT-3 Revision 15 (03/07)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
(DRN 06-1062, R15)
Figure 15.6-109g has been intentionally deleted.  
Figure 15.6-109h has been intentionally deleted.
(DRN 06-1062, R15)
(DRN 06-1062, R15)


WSES-FSAR-UNIT-3 Revision 15 (03/07)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
(DRN 06-1062, R15)
Figure 15.6-109h has been intentionally deleted.  
Figure 15.6-109i has been intentionally deleted.
(DRN 06-1062, R15)
(DRN 06-1062, R15)


WSES-FSAR-UNIT-3 Revision 15 (03/07)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
(DRN 06-1062, R15)
Figure 15.6-109i has been intentionally deleted.  
Figure 15.6-109j has been intentionally deleted.
(DRN 06-1062, R15)
(DRN 06-1062, R15)


WSES-FSAR-UNIT-3 Revision 15 (03/07)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
(DRN 06-1062, R15)
Figure 15.6-109j has been intentionally deleted.  
Figure 15.6-109k has been intentionally deleted.
(DRN 06-1062, R15)
(DRN 06-1062, R15)


WSES-FSAR-UNIT-3 Revision 15 (03/07)
FIGURE HAS BEEN INTENTIONALLY DELETED Steam Electric CYCLE 6 ECCS ANALYSIS PEAK CLAD TEMPERATURE VERSUS TIME FOR THE HOT SPOT LOCATION
(DRN 06-1062, R15)
Figure 15.6-109k has been intentionally deleted.
(DRN 06-1062, R15)


FIGUREHAS BEEN INTENTIONALLY DELETED SteamElectricCYCLE 6 ECCS ANALYSIS PEAK CLAD TEMPERATURE VERSUSTIME FOR THE HOT SPOT LOCATION
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Core Power Figure 15.6-110 


Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Core Power Figure 15.6-110
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-111 


Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-111
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Leak Flow Rate Figure 15.6-112 


Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Leak Flow Rate Figure 15.6-112
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-113 WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
 
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-113  
 
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figure 15.6-114 has been deleted. (DRN 05-543, R14)  
Figure 15.6-114 has been deleted. (DRN 05-543, R14)  


Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Quality Figure 15.6-115  
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Quality Figure 15.6-115  
 
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Containment Pressure Figure 15.6-116


Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-117
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Containment Pressure Figure 15.6-116 


Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Peak Cladding Temperature Figure 15.6-118
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-117 


WSES-FSAR-UNIT-3  Revision 302 (12/08)
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Peak Cladding Temperature Figure 15.6-118 WSES-FSAR-UNIT-3  Revision 302 (12/08)
(EC-9533, R302)
(EC-9533, R302)
Figure 15.6-118a through Figure 15.6-127 have been deleted.  
Figure 15.6-118a through Figure 15.6-127 have been deleted.
(EC-9533, R302)
(EC-9533, R302)


LOUISIANA POWER 8 LIGHT CO.
LOUISIANA POWER 8 LIGHT CO.
StationFIGURES THROUGH HAVE BEEN INTENTIONALLY DELETED  
Station FIGURES THROUGH HAVE BEEN INTENTIONALLY DELETED  


Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Core Power Figure 15.6-127a  
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Core Power Figure 15.6-127a  
Line 204: Line 192:
Revision 307 (7/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Peak Cladding Temperature Figure 15.6-127h  
Revision 307 (7/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Peak Cladding Temperature Figure 15.6-127h  


Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis Peak Cladding Temperature Versus Break Size Figure 15.6-128  
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis Peak Cladding Temperature Versus Break Size Figure 15.6-128 WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
 
WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figures 15.6-129 through 15.6-176 have been intentionally deleted. (DRN 05-543, R14)  
Figures 15.6-129 through 15.6-176 have been intentionally deleted. (DRN 05-543, R14)  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis Peak Cladding Temperature vs. Break Size Figure 15.6-177  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis Peak Cladding Temperature vs. Break Size Figure 15.6-177 0.25 1200 2400 3600 6000 TIME, SECONDS LOUISIANA POWER  LIGHT CO. Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE NORMALIZED TOTAL CORE POWER Figure 15.6-178 J 2400 2000 1600 1200 800 400 1200 2400 3600 TIME, SECONDS 4800 LOUISIANA I POWER LIGHT CO.
 
INADVERTENT Waterford Steam INNER VE Electric Station OF A PRESSURIZER SAFETY VALVE -- PRESSURE Figure 15.6-179 I I 600 I I I 1200 2400 3600 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO.
0.251200240036006000TIME,SECONDSLOUISIANA POWER  LIGHT CO. SteamElectric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE NORMALIZED TOTAL CORE POWER Figure15.6-178J 24002000 16001200800400120024003600TIME, SECONDS 4800LOUISIANA IPOWER LIGHT CO.
Waterford SteamElectric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE LEAK FLOW RATE Figure 60000 45000 30000 0 2400 4800 6000 TIME, SECONDS LOUISIANA POWER  LIGHT CO.
INADVERTENT Waterford Steam INNER VEElectric Station OF A PRESSURIZER SAFETY VALVE -- PRESSURE Figure15.6-179II 600III1200240036006000TIME, SECONDS LOUISIANA POWER LIGHT CO.
Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVEINNER VESSEL INLET FLOW RATE Figure 15.6-181 LOUISIANA POWER  LIGHT CO.
Waterford SteamElectric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE LEAK FLOW RATE Figure 6000045000 300000240048006000TIME,SECONDSLOUISIANA POWER  LIGHT CO.
Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE INNER VESSEL TWO-PHASE MIXTURE HEIGHT Figure 15.6-l 82 CORE------------ -------1200 2400 TIME, SECONDS 6,000 1 I II I I 1200 2400 3600 6000 LOUISIANA POWER  LIGHT CO.
Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVEINNER VESSEL INLET FLOW RATE Figure15.6-181 LOUISIANA POWER  LIGHT CO.
Waterford Steam Electric Station TIME, SECONDS Figure INADVERTENT OPENINGOF A PRESSURIZER SAFETY VALVE HEAT TRANSFER AT HOT SPOT 15.6-183 600 I I I I 1200 2400 3600 TIME, SECONDS 6000 LOUISIANA POWER  LIGHT CO.
Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE INNER VESSEL TWO-PHASE MIXTURE HEIGHT Figure15.6-l 82 CORE------------ -------12002400TIME, SECONDS 6,000 1IIIII1200240036006000LOUISIANA POWER  LIGHT CO.
Waterford Steam INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE COOLANT TEMPERATURE AT HOT SPOT Figure 15.6-184 Electric Station I I CLAD SURFACETEMPERATURE, WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Waterford Steam Electric Station TIME,SECONDSFigureINADVERTENT OPENINGOF A PRESSURIZER SAFETY VALVE HEAT TRANSFER AT HOT SPOT 15.6-183 600IIII120024003600TIME, SECONDS 6000LOUISIANA POWER  LIGHT CO.
Waterford Steam INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE COOLANT TEMPERATURE AT HOT SPOT Figure15.6-184Electric Station II CLAD SURFACETEMPERATURE, WSES-FSAR-UNIT-3  Revision 14 (12/05)(DRN 05-543, R14)
Figures 15.6-186 through 15.6-205 have been intentionally deleted. (DRN 05-543, R14)  
Figures 15.6-186 through 15.6-205 have been intentionally deleted. (DRN 05-543, R14)  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Core Power Figure 15.6-206  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Core Power Figure 15.6-206  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Pressure Figure 15.6-207  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Pressure Figure 15.6-207  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break  Break Flow Rate Figure 15.6-208  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break  Break Flow Rate Figure 15.6-208  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-209  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-209  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-210  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-210  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-211  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-211  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Coolant Temperature at Hot Spot Figure 15.6-212  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Coolant Temperature at Hot Spot Figure 15.6-212  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Cladding Temperature at Hot Spot Figure 15.6-213  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-213  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Core Power Figure 15.6-214  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Core Power Figure 15.6-214  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Pressure Figure 15.6-215  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Pressure Figure 15.6-215  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break  Break Flow Rate Figure 15.6-216  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break  Break Flow Rate Figure 15.6-216  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-217  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-217  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-218  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-218  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-219  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-219  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Coolant Temperature at Hot Spot Figure 15.6-220  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Coolant Temperature at Hot Spot Figure 15.6-220  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Cladding Temperature at Hot Spot Figure 15.6-221  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-221  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 1 Pressure Figure 15.6-221a  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 1 Pressure Figure 15.6-221a  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 2 Pressure Figure 15.6-221b  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 2 Pressure Figure 15.6-221b  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 1  Secondary Flow Rate Figure 15.6-221c  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 1  Secondary Flow Rate Figure 15.6-221c  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 2  Secondary Flow Rate Figure 15.6-221d  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 2  Secondary Flow Rate Figure 15.6-221d  


WSES-FSAR-UNIT-3  Revision 307 (07/13)
WSES-FSAR-UNIT-3  Revision 307 (07/13)
(EC-8458, R307)
(EC-8458, R307)
Figure 15.6-222 through Figure 15.6-233 have been intentionally deleted.  
Figure 15.6-222 through Figure 15.6-233 have been intentionally deleted.
(EC-8458, R307)
(EC-8458, R307)


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Core Power Figure 15.6-234  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Core Power Figure 15.6-234  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Inner Vessel Pressure Figure 15.6-235  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Pressure Figure 15.6-235  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Flow Rate Figure 15.6-236  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Flow Rate Figure 15.6-236  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-237  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-237  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-238  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-238  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-239  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-239  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Coolant  Temperature at Hot Spot Figure 15.6-240  
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Coolant  Temperature at Hot Spot Figure 15.6-240  


Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Cladding Temperature at Hot Spot Figure 15.6-241}}
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-241}}

Latest revision as of 01:56, 27 April 2019

Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 15.6, Figures 15.6-1 Through 15.6-241
ML16257A136
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A136 (136)


Text

WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.6-1 has been deleted. (DRN 05-543, R14)

Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Power vs. Time Figure15.6-1a Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Average Heat Flux vs. Time Figure15.6-1b Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Pressure vs. Time Figure15.6-1c

Revision 304 (06/10)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Minimum DNBR vs. Time Figure 15.6-1d Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Temperatures vs. Time Figure15.6-1e Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Pressurizer Level vs. Time Figure 15.6-1f Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Steam Generator Pressure vs. Time Figure15.6-1g Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Break Flow vs. Time Figure15.6-1h Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Integrated Break Flow vs. Time Figure 15.6-1i WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figures 15.6-2 through 15.6-31 have been intentionally deleted. (DRN 05-543, R14)

THIS FIGURE INTENTIONALLY DELETED REVISION 5 Waterford Steam Electric Station Figure 15.6-32 THIS FIGURE INTENTIONALLY DELETED REVISION 5 Waterford Steam Electric Station Figure 15.6-33 THIS FIGURE INTENTIONALLY DELETED REVISION 5 I I I Waterford Steom Electric Station Figure 15.6-34 THIS FIGURE INTENTIONALLY DELETED REVISION 5 Woterford Steam Electric Station 3 Figure 15.6-35 Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Power vs. Time Figure 15.6-35A Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Heat Flux vs. Time Figure 15.6-35B WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.6-35C has been deleted. (DRN 05-543, R14)

Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Pressure vs. Time Figure15.6-35D WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.6-35E has been deleted. (DRN 05-543, R14)

Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Temperatures vs. Time Figure15.6-35F WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.6-35G has been deleted. (DRN 05-543, R14)

Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Pressurizer Water Volume vs. Time Figure15.6-35H

Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Inventory vs. Time Figure 15.6-35I WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.6-35J has been deleted. (DRN 05-543, R14)

Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Pressure vs. Time Figure 15.6-35K Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Feedwater Flowrate per SG vs. Time Figure15.6-35L WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.6-35M has been deleted. (DRN 05-543, R14)

Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Primary-to-Secondary Leak Rate vs. Time Figure15.6-35N WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.6-35O has been deleted. (DRN 05-543, R14)

Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Liquid Mass vs. Time Figure 15.6-35P Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Steam Mass Through ADVs vs. Time Figure15.6-35Q Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Primary-to-Secondary Leak Flow vs. Time Figure15.6-35R

Revision 304 (06/10)Waterford Steam Electric Station #3 SGTR with LOOP Minimum DNBR vs. Time Figure 15.6-35S WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figures 15.6-36 through 15.6-91 have been intentionally deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Power Figure 15.6-92

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-93

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Leak Flow Rate Figure 15.6-94

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot) Figure 15.6-95 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.6-96 has been deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Quality Figure 15.6-97

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Containment Pressure Figure 15.6-98

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-99

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Peak Cladding Temperature Figure 15.6-100

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Mid Annulus Flow Rate Figure 15.6-100a

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Quality Above and Below the Core Figure 15.6-100b

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Pressure Drop Figure 15.6-100c

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Safety Injection Flow Rate Into Intact Discharge Legs Figure 15.6-100d

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Water Level in Downcomer During Reflood Figure 15.6-100e

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Spot Gap Conductance Figure 15.6-100f

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Maximum Local Cladding Oxidation Percentage Figure 15.6-100g

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Fuel Centerline, Fuel Average, Cladding, and Coolant Temperature at the Hot Spot Figure 15.6-100h

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Spot Heat Transfer Coefficient Figure 15.6-100i

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Pin Pressure Figure 15.6-100j

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Bulk Channel Flow Rate Figure 15.6-100k

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Core Power Figure 15.6-101

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-102

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Leak Flow Rate Figure 15.6-103

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-104 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.6-105 has been deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Quality Figure 15.6-106

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Containment Pressure Figure 15.6-107

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-108

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Peak Cladding Temperature Figure 15.6-109 WSES-FSAR-UNIT-3 Revision 15 (03/07)

(DRN 06-1062, R15)

Figure 15.6-109a has been intentionally deleted.

(DRN 06-1062, R15)

WSES-FSAR-UNIT-3 Revision 15 (03/07)

(DRN 06-1062, R15)

Figure 15.6-109b has been intentionally deleted.

(DRN 06-1062, R15)

WSES-FSAR-UNIT-3 Revision 15 (03/07)

(DRN 06-1062, R15)

Figure 15.6-109c has been intentionally deleted.

(DRN 06-1062, R15)

WSES-FSAR-UNIT-3 Revision 15 (03/07)

(DRN 06-1062, R15)

Figure 15.6-109d has been intentionally deleted.

(DRN 06-1062, R15)

WSES-FSAR-UNIT-3 Revision 15 (03/07)

(DRN 06-1062, R15)

Figure 15.6-109e has been intentionally deleted.

(DRN 06-1062, R15)

WSES-FSAR-UNIT-3 Revision 15 (03/07)

(DRN 06-1062, R15)

Figure 15.6-109f has been intentionally deleted.

(DRN 06-1062, R15)

WSES-FSAR-UNIT-3 Revision 15 (03/07)

(DRN 06-1062, R15)

Figure 15.6-109g has been intentionally deleted.

(DRN 06-1062, R15)

WSES-FSAR-UNIT-3 Revision 15 (03/07)

(DRN 06-1062, R15)

Figure 15.6-109h has been intentionally deleted.

(DRN 06-1062, R15)

WSES-FSAR-UNIT-3 Revision 15 (03/07)

(DRN 06-1062, R15)

Figure 15.6-109i has been intentionally deleted.

(DRN 06-1062, R15)

WSES-FSAR-UNIT-3 Revision 15 (03/07)

(DRN 06-1062, R15)

Figure 15.6-109j has been intentionally deleted.

(DRN 06-1062, R15)

WSES-FSAR-UNIT-3 Revision 15 (03/07)

(DRN 06-1062, R15)

Figure 15.6-109k has been intentionally deleted.

(DRN 06-1062, R15)

FIGURE HAS BEEN INTENTIONALLY DELETED Steam Electric CYCLE 6 ECCS ANALYSIS PEAK CLAD TEMPERATURE VERSUS TIME FOR THE HOT SPOT LOCATION

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Core Power Figure 15.6-110

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-111

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Leak Flow Rate Figure 15.6-112

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-113 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.6-114 has been deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Quality Figure 15.6-115

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Containment Pressure Figure 15.6-116

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-117

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Peak Cladding Temperature Figure 15.6-118 WSES-FSAR-UNIT-3 Revision 302 (12/08)

(EC-9533, R302)

Figure 15.6-118a through Figure 15.6-127 have been deleted.

(EC-9533, R302)

LOUISIANA POWER 8 LIGHT CO.

Station FIGURES THROUGH HAVE BEEN INTENTIONALLY DELETED

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Core Power Figure 15.6-127a

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-127b

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Leak Flow Rate Figure 15.6-127c

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.4 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot) Figure 15.6-127d

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.4 DEG/PD Break Hot Assembly Quality Figure 15.6-127e

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Containment Pressure Figure 15.6-127f

Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-127g

Revision 307 (7/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Peak Cladding Temperature Figure 15.6-127h

Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis Peak Cladding Temperature Versus Break Size Figure 15.6-128 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figures 15.6-129 through 15.6-176 have been intentionally deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis Peak Cladding Temperature vs. Break Size Figure 15.6-177 0.25 1200 2400 3600 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO. Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE NORMALIZED TOTAL CORE POWER Figure 15.6-178 J 2400 2000 1600 1200 800 400 1200 2400 3600 TIME, SECONDS 4800 LOUISIANA I POWER LIGHT CO.

INADVERTENT Waterford Steam INNER VE Electric Station OF A PRESSURIZER SAFETY VALVE -- PRESSURE Figure 15.6-179 I I 600 I I I 1200 2400 3600 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO.

Waterford SteamElectric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE LEAK FLOW RATE Figure 60000 45000 30000 0 2400 4800 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVEINNER VESSEL INLET FLOW RATE Figure 15.6-181 LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE INNER VESSEL TWO-PHASE MIXTURE HEIGHT Figure 15.6-l 82 CORE------------ -------1200 2400 TIME, SECONDS 6,000 1 I II I I 1200 2400 3600 6000 LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station TIME, SECONDS Figure INADVERTENT OPENINGOF A PRESSURIZER SAFETY VALVE HEAT TRANSFER AT HOT SPOT 15.6-183 600 I I I I 1200 2400 3600 TIME, SECONDS 6000 LOUISIANA POWER LIGHT CO.

Waterford Steam INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE COOLANT TEMPERATURE AT HOT SPOT Figure 15.6-184 Electric Station I I CLAD SURFACETEMPERATURE, WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figures 15.6-186 through 15.6-205 have been intentionally deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Core Power Figure 15.6-206

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Pressure Figure 15.6-207

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Break Flow Rate Figure 15.6-208

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-209

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-210

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-211

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Coolant Temperature at Hot Spot Figure 15.6-212

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-213

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Core Power Figure 15.6-214

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Pressure Figure 15.6-215

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Break Flow Rate Figure 15.6-216

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-217

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-218

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-219

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Coolant Temperature at Hot Spot Figure 15.6-220

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-221

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 1 Pressure Figure 15.6-221a

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 2 Pressure Figure 15.6-221b

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 1 Secondary Flow Rate Figure 15.6-221c

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft 2/PD Break Steam Generator No. 2 Secondary Flow Rate Figure 15.6-221d

WSES-FSAR-UNIT-3 Revision 307 (07/13)

(EC-8458, R307)

Figure 15.6-222 through Figure 15.6-233 have been intentionally deleted.

(EC-8458, R307)

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Core Power Figure 15.6-234

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Pressure Figure 15.6-235

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Flow Rate Figure 15.6-236

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-237

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-238

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-239

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Coolant Temperature at Hot Spot Figure 15.6-240

Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft 2/PD Break Cladding Temperature at Hot Spot Figure 15.6-241