Line 52: Line 52:
*
*
* 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE Public Service Electric and Gas Company (PSE&G) is responsible for assuring that the operation, maintenance, refueling and modification of the nuclear generating stations are accomplished in a manner that protects public health and safety and that it is in compliance with applicable regulatory requirements.
* 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE Public Service Electric and Gas Company (PSE&G) is responsible for assuring that the operation, maintenance, refueling and modification of the nuclear generating stations are accomplished in a manner that protects public health and safety and that it is in compliance with applicable regulatory requirements.
To carry out this PSE&G developed and implemented a comprehensive Quality Assurance Program that was applicable to the design, construction, and testing phases and is now applied to the operation phase. The Operational Quality Assurance Program is described in the following doeu!l'lento.  
To carry out this PSE&G developed and implemented a comprehensive Quality Assurance Program that was applicable to the design, construction, and testing phases and is now applied to the operation phase. The Operational Quality Assurance Program is described in the following doeu!l'lento.
: 1. NC.VP PO.ZZ OOlO(Q) I Operational Quality Aoouranee Progra!l'I establishes the Quality Assurance Program. r,.. Nuclear Administrative Procedures Manualf -documents the programs and processes that implement the QA Program. The QA program provides measures to assure the control of activities affecting the quality of structures, systems, components, to an extent consistent with their importance to safety. The Quality Assurance Program encompasses fire protection of safety-related areas and other activities enumerated in Regulatory Guide 1.33. A planned monitoring assessment and audit program assures effective implementation of the Operational Quality Assurance Program. An assessment is a direct observation of activities and review of documentation to verify compliance/conformance to specified requirements and effectiveness of processes.
: 1. NC.VP PO.ZZ OOlO(Q) I Operational Quality Aoouranee Progra!l'I establishes the Quality Assurance Program. r,.. Nuclear Administrative Procedures Manualf -documents the programs and processes that implement the QA Program. The QA program provides measures to assure the control of activities affecting the quality of structures, systems, components, to an extent consistent with their importance to safety. The Quality Assurance Program encompasses fire protection of safety-related areas and other activities enumerated in Regulatory Guide 1.33. A planned monitoring assessment and audit program assures effective implementation of the Operational Quality Assurance Program. An assessment is a direct observation of activities and review of documentation to verify compliance/conformance to specified requirements and effectiveness of processes.
The program provides coordinated and centralized quality assurance direction, control, and documentation, as required by Nuclear Regulatory Commission (NRC) criteria set forth in lOCFRSO, Appendix B. The program provides for monitoring, assessing and auditing elements of the Fitness-For-Duty (FFD) Program as set forth in 10CFR26 and is applied to and includes non Q-list (i.e. balance of plant) activities and services necessary to achieve safety, reliability, availability and economy in the operation of Hope Creek Generating Station. Applicable NRC Regulatory Guides, codes, and standards, as well as the policy statements contained in the Nuclear Administrative Procedures Manual, are used by PSE&G organizations performing activities affecting safety to prepare appropriate implementing procedures.
The program provides coordinated and centralized quality assurance direction, control, and documentation, as required by Nuclear Regulatory Commission (NRC) criteria set forth in lOCFRSO, Appendix B. The program provides for monitoring, assessing and auditing elements of the Fitness-For-Duty (FFD) Program as set forth in 10CFR26 and is applied to and includes non Q-list (i.e. balance of plant) activities and services necessary to achieve safety, reliability, availability and economy in the operation of Hope Creek Generating Station. Applicable NRC Regulatory Guides, codes, and standards, as well as the policy statements contained in the Nuclear Administrative Procedures Manual, are used by PSE&G organizations performing activities affecting safety to prepare appropriate implementing procedures.
Line 61: Line 61:
* Quality Assurance (QA) policy statements are issued by key management representatives, including the Chairman*and Chief Executive Officer and the Chief Nuclear Officer and President  
* Quality Assurance (QA) policy statements are issued by key management representatives, including the Chairman*and Chief Executive Officer and the Chief Nuclear Officer and President  
-Nuclear Business Unit (CNO/PNBU) . These policy statements are mandatory throughout the Company for nuclear facilities . Key policy elements, as they apply to nuclear safety, include the following:  
-Nuclear Business Unit (CNO/PNBU) . These policy statements are mandatory throughout the Company for nuclear facilities . Key policy elements, as they apply to nuclear safety, include the following:  
-1. Nuclear safety is of the highest priority and shall take precedence over matters concerning power production.  
-1. Nuclear safety is of the highest priority and shall take precedence over matters concerning power production.
: 2. The public's health and safety is the prime consideration in the conduct and support of Public Service Electric and Gas Company's nuclear operations and shall not be compromised.
: 2. The public's health and safety is the prime consideration in the conduct and support of Public Service Electric and Gas Company's nuclear operations and shall not be compromised.
All decisions which could affect the health and safety of the public shall be made conservatively.  
All decisions which could affect the health and safety of the public shall be made conservatively.
: 3. The Operational Quality Assurance Program is an essential part of the PSE&G commitment to safe and reliable nuclear power operation.
: 3. The Operational Quality Assurance Program is an essential part of the PSE&G commitment to safe and reliable nuclear power operation.
Applicable program requirements shall be strictly adhered to in the performance of activities covered by the Operational Quality Assurance Program. PSE&G requires its suppliers and contractors to assume responsibility for establishing and implementing Quality Assurance/Quality Verification (QA/QV) programs, as applicable, to meet 10 CFR 50, Appendix B. However, responsibility for the overall QA program is retained and exercised by PSE&G. QA reviews those programs and conducts appropriate monitoring and auditing as required to assure that the suppliers are properly implementing their QA/QV programs.
Applicable program requirements shall be strictly adhered to in the performance of activities covered by the Operational Quality Assurance Program. PSE&G requires its suppliers and contractors to assume responsibility for establishing and implementing Quality Assurance/Quality Verification (QA/QV) programs, as applicable, to meet 10 CFR 50, Appendix B. However, responsibility for the overall QA program is retained and exercised by PSE&G. QA reviews those programs and conducts appropriate monitoring and auditing as required to assure that the suppliers are properly implementing their QA/QV programs.
Line 80: Line 80:
* 17.2.1.1.1 Quality Assurance The Director -
* 17.2.1.1.1 Quality Assurance The Director -
ijtjJq Quality AssuraHee/Huclear Safety Review is responsible for defining, formulating, implementing, and coordinating the QA program. He has been delegated the authority and has the independence to interpret quality requirements, identify quality problems and trends, and provide recommendations or solutions to quality problems He is responsible for approval of the QA/NSR Department Manual used during the operations phase of the nuclear stations.
ijtjJq Quality AssuraHee/Huclear Safety Review is responsible for defining, formulating, implementing, and coordinating the QA program. He has been delegated the authority and has the independence to interpret quality requirements, identify quality problems and trends, and provide recommendations or solutions to quality problems He is responsible for approval of the QA/NSR Department Manual used during the operations phase of the nuclear stations.
He also is responsible for verifying compliance with established requirements for the QA program through document review, inspection, monitoring, assessments and audits  
He also is responsible for verifying compliance with established requirements for the QA program through document review, inspection, monitoring, assessments and audits
:nffi%:::
:nffi%:::
s§§p=re+/-i QA provides a centralized coordinating function for QA/QV activities applied to the operations phase. The Director -
s§§p=re+/-i QA provides a centralized coordinating function for QA/QV activities applied to the operations phase. The Director -
has the authority and responsibility to stop work, through the issuance of a Stop Work Order, when significant conditions adverse to quality require such action. The PSE&G policies and organization structure assure that the Director -QA/HSR has sufficient organizational freedom and independence to carry out his responsibilities.
has the authority and responsibility to stop work, through the issuance of a Stop Work Order, when significant conditions adverse to quality require such action. The PSE&G policies and organization structure assure that the Director -QA/HSR has sufficient organizational freedom and independence to carry out his responsibilities.
Responsibilities of the Manager -Corrective Action and Quality Servioeo include the following:  
Responsibilities of the Manager -Corrective Action and Quality Servioeo include the following:
: 1. AdmiHistratioH of the Uuelear Repair  -$.\. Review of engineering documents such as equipment specifications, weld procedures, ete. for inclusion of QA requirements.
: 1. AdmiHistratioH of the Uuelear Repair  -$.\. Review of engineering documents such as equipment specifications, weld procedures, ete. for inclusion of QA requirements.
Review and approve specifications for Q-listed materials, equipment, and services.
Review and approve specifications for Q-listed materials, equipment, and services.
Line 96: Line 96:
* Monitoring/auditing of nuclear fuel fabrication and installation.
* Monitoring/auditing of nuclear fuel fabrication and installation.
M<:'9. Review of NBU fuel specifications for inclusion of QA requirements . *!-+/-),.&sect;..
M<:'9. Review of NBU fuel specifications for inclusion of QA requirements . *!-+/-),.&sect;..
Perform material evaluation activities on items subject to the QA Program. 12. Perforffi Code related inspections and test perforffiance.  
Perform material evaluation activities on items subject to the QA Program. 12. Perforffi Code related inspections and test perforffiance.
: 13. Perforffi design change package pre impleffientation review and closure review for oompliance with Inspeotion Hold Points (IHPs) . 11. Performing performance based inspections (IHPs) Responsibilities of the Manager -Quality Assessment include the following:  
: 13. Perforffi design change package pre impleffientation review and closure review for oompliance with Inspeotion Hold Points (IHPs) . 11. Performing performance based inspections (IHPs) Responsibilities of the Manager -Quality Assessment include the following:  
+:q m#it* 'ii!::  
+:q m#it* 'ii!::  
Line 107: Line 107:
* procedures (as necessary, these assessments may also include station administrative and implementing procedures) .S.'.J;::aj}
* procedures (as necessary, these assessments may also include station administrative and implementing procedures) .S.'.J;::aj}
Conducting QA Program orientation for NBU personnel administering the training and certification program for QA personnel involved in inspection, assessments, and auditing activities, maintaining the QA training plan, and maintaining QA training records. 1g. Review of new regulatory requirements for QA program impact.
Conducting QA Program orientation for NBU personnel administering the training and certification program for QA personnel involved in inspection, assessments, and auditing activities, maintaining the QA training plan, and maintaining QA training records. 1g. Review of new regulatory requirements for QA program impact.
Coordination of the commitment verification program on a selected basis. Mf j ::  
Coordination of the commitment verification program on a selected basis. Mf j ::
:  
:  
\l#.g 2;\J#i::lli{i i'S:F  
\l#.g 2;\J#i::lli{i i'S:F  
Line 114: Line 114:
* Responsibilities of the Manager Nuclear Safety Review are described in Section 13.1. Responsibilities of the Manag-er Licensing-and Regulation are described in Section 13.1.
* Responsibilities of the Manager Nuclear Safety Review are described in Section 13.1. Responsibilities of the Manag-er Licensing-and Regulation are described in Section 13.1.
rn  
rn  
&#xa5;#8:Gides tlie f.sg+&#xa3;&#xa5;tii,s:r * : :  
&#xa5;#8:Gides tlie f.sg+&#xa3;&#xa5;tii,s:r * : :
:#9  
:#9  
#&sect;:#B&sect;P.#W t.:Mt:
#&sect;:#B&sect;P.#W t.:Mt:
qij.p) ::m%#B9ffu'.  
qij.p) ::m%#B9ffu'.  
?!f!&sect;i  
?!f!&sect;i  
*t?*B:Mfs#:&sect;:  
*t?*B:Mfs#:&sect;:
::@@ F.##F NRB" independent r Responsibilities of the Manager Employee are described in section 13. 1. 17.2.1.1.1.1 Quality Assurance Personnel Qualifications The Director -
::@@ F.##F NRB" independent r Responsibilities of the Manager Employee are described in section 13. 1. 17.2.1.1.1.1 Quality Assurance Personnel Qualifications The Director -
and the QA managers reporting directly to him must each have a combination of 6 years of experience in the field of QA and operations.
and the QA managers reporting directly to him must each have a combination of 6 years of experience in the field of QA and operations.
Line 125: Line 125:
Personnel performing inspections, examinations, and test activities (i.e., to verify conformance) are certified as Level I, Level II, or Level III, as appropriate to their responsibilities, also in accordance with Regulatory Guide 1.58. Personnel performing quality assurance audits are certified as auditors or lead auditors, as appropriate to their responsibilities in accordance with Regulatory Guide 1.146.
Personnel performing inspections, examinations, and test activities (i.e., to verify conformance) are certified as Level I, Level II, or Level III, as appropriate to their responsibilities, also in accordance with Regulatory Guide 1.58. Personnel performing quality assurance audits are certified as auditors or lead auditors, as appropriate to their responsibilities in accordance with Regulatory Guide 1.146.
The Director -
The Director -
fulfills the above qualifications with the addition of the following:  
fulfills the above qualifications with the addition of the following:
: 1. Knowledge and experience in quality assurance,   
: 1. Knowledge and experience in quality assurance,   
*
*
Line 141: Line 141:
* *   
* *   
* *   
* *   
* *  
* *
: t]:  
: t]:
:*  
:*  
!&sect;&#xa5;J#:P.i&sect;::   
!&sect;&#xa5;J#:P.i&sect;::   
Line 170: Line 170:
* P:ns+.@!i.#
* P:ns+.@!i.#
m*;*:***:J::*:
m*;*:***:J::*:
r  
r
:pr;  
:pr;  
?!!H   
?!!H   
*  
*
:mmts1wa *   
:mmts1wa *   
*   
*   
Line 183: Line 183:
iCf:4fat:t;J#ffe  
iCf:4fat:t;J#ffe  
*-:  
*-:  
@# .B=f' :ffe::' ,  
@# .B=f' :ffe::' ,
:**  
:**  
!!&sect;#,pg!ili,:  
!!&sect;#,pg!ili,:
:&sect;&sect; e:;m?erience m.ay nave be.en in<r:ela.t:ed.
:&sect;&sect; e:;m?erience m.ay nave be.en in<r:ela.t:ed.
d;i:s:ciplines.  
d;i:s:ciplines.  
Line 194: Line 194:
The Distribution Systems Department is responsible for providing support to Hope Creek operations for setting and testing protective relays for the external vital power supplies at the station. 17.2.2 Quality Assurance Program The QA program is designed to comply with the requirements of 10CFR50,.
The Distribution Systems Department is responsible for providing support to Hope Creek operations for setting and testing protective relays for the external vital power supplies at the station. 17.2.2 Quality Assurance Program The QA program is designed to comply with the requirements of 10CFR50,.
Appendix B, and with fire protection program requirements of Branch Technical Position CMEB 9.5-l. This program is applied to items and activities that can affect the health and safety of the public, i.e., Q, F, and R-designated items and activities.
Appendix B, and with fire protection program requirements of Branch Technical Position CMEB 9.5-l. This program is applied to items and activities that can affect the health and safety of the public, i.e., Q, F, and R-designated items and activities.
During the operational phase, this includes:  
During the operational phase, this includes:
: 1. Structures, systems, and components delineated in Table 3.2-1 and marked as Y in "QA Requirement" column. 2. Safety-related activities delineated in Regulatory Guide 1.33 and summarized in Table 17.2-1, Section A and additional NRC requirements contained in Table 17.2-1, Section B. 3. Portions of structures, systems, and components whose continued function is not required, but whose failure, caused by a safe shutdown earthquake (SSE) , could reduce the functioning of a Seismic Category I structure, system, or component to an unacceptable safety level; or could result in an incapacitating injury to occupants of 17.2-8 HCGS-UFSAR Revision 8 September 25, 1996   
: 1. Structures, systems, and components delineated in Table 3.2-1 and marked as Y in "QA Requirement" column. 2. Safety-related activities delineated in Regulatory Guide 1.33 and summarized in Table 17.2-1, Section A and additional NRC requirements contained in Table 17.2-1, Section B. 3. Portions of structures, systems, and components whose continued function is not required, but whose failure, caused by a safe shutdown earthquake (SSE) , could reduce the functioning of a Seismic Category I structure, system, or component to an unacceptable safety level; or could result in an incapacitating injury to occupants of 17.2-8 HCGS-UFSAR Revision 8 September 25, 1996   
*
*
* 4. the control room as shown in Table 17.2-2 and further delineated in Table 3.2-1 . Fire protection systems, including emergency lighting and communications, shown in Table 17.2-3, and further delineated in Table 3.2-1 as well as administrative controls, such as fire brigade trafning, control of combustibles and ignition sources, and firefighting procedures.  
* 4. the control room as shown in Table 17.2-2 and further delineated in Table 3.2-1 . Fire protection systems, including emergency lighting and communications, shown in Table 17.2-3, and further delineated in Table 3.2-1 as well as administrative controls, such as fire brigade trafning, control of combustibles and ignition sources, and firefighting procedures.
: 5. Radwaste management systems described in Table 17.2-4 and further delineated in Table 3.2-1. The QA program is applied during the operational phase using a graded approach to the extent consistent with the item's or activity's importance to safety. Where there is an inconsistency between tables (i.e., Tables 3.2-1, 17.2-1, 17.2-2, and 17.2-3), the item will have QA provisions applied until the conflict is resolved and tables revised. These activities are performed in compliance with applicable regulatory requirements that include but are not limited to: 1. Regulatory Guide 1.8, Qualification and Training of Personnel for I Nuclear Power Plants 2. Regulatory Guide 1.17, Protection of Nuclear Plants Against Industrial Sabotage 3. Regulatory Guide 1.26, Quality Group Classifications and Standards for water, steam and radioactive waste containing components of Nuclear Power Plants 4. Regulatory Guide 1.29, Seismic Design Classification  
: 5. Radwaste management systems described in Table 17.2-4 and further delineated in Table 3.2-1. The QA program is applied during the operational phase using a graded approach to the extent consistent with the item's or activity's importance to safety. Where there is an inconsistency between tables (i.e., Tables 3.2-1, 17.2-1, 17.2-2, and 17.2-3), the item will have QA provisions applied until the conflict is resolved and tables revised. These activities are performed in compliance with applicable regulatory requirements that include but are not limited to: 1. Regulatory Guide 1.8, Qualification and Training of Personnel for I Nuclear Power Plants 2. Regulatory Guide 1.17, Protection of Nuclear Plants Against Industrial Sabotage 3. Regulatory Guide 1.26, Quality Group Classifications and Standards for water, steam and radioactive waste containing components of Nuclear Power Plants 4. Regulatory Guide 1.29, Seismic Design Classification
: 5. Regulatory Guide 1. 30, Quality Assurance Requirements for the HCGS-UFSAR Installation, Inspection, and Testing of Instrumentation and Electric Equipment 17.2-9 Revision 4 April 11, 1992
: 5. Regulatory Guide 1. 30, Quality Assurance Requirements for the HCGS-UFSAR Installation, Inspection, and Testing of Instrumentation and Electric Equipment 17.2-9 Revision 4 April 11, 1992
: 6. Regulatory Guide 1.33, Quality Assurance Program Requirements (Operation)  
: 6. Regulatory Guide 1.33, Quality Assurance Program Requirements (Operation)
: 7. Regulatory Guide 1.37, Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water Cooled Nuclear Power Plants 8. Regulatory Guide 1. 38, Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water Cooled Nuclear Power Plants 9. Regulatory Guide 1.39, Housekeeping Requirements for Water-Cooled Nuclear Power Plants 10. Regulatory Guide 1.52, Design, Testing, and Maintenance Criteria for Atmosphere Cleanup System Air Filtration and Absorption Units of Light Water Cooled Nuclear Power Plants 11. Regulatory Guide 1.54, QA Requirements for Protective Coatings Applied to Water-Cooled Nuclear Power Plants 12. Regulatory Guide 1.58, Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel  
: 7. Regulatory Guide 1.37, Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water Cooled Nuclear Power Plants 8. Regulatory Guide 1. 38, Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water Cooled Nuclear Power Plants 9. Regulatory Guide 1.39, Housekeeping Requirements for Water-Cooled Nuclear Power Plants 10. Regulatory Guide 1.52, Design, Testing, and Maintenance Criteria for Atmosphere Cleanup System Air Filtration and Absorption Units of Light Water Cooled Nuclear Power Plants 11. Regulatory Guide 1.54, QA Requirements for Protective Coatings Applied to Water-Cooled Nuclear Power Plants 12. Regulatory Guide 1.58, Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel
: 13. Regulatory Guide 1.64, Quality Assurance Requirements for the Design of Nuclear Power Plants 14. Regulatory Guide 1.74, Quality Assurance Terms and Definitions  
: 13. Regulatory Guide 1.64, Quality Assurance Requirements for the Design of Nuclear Power Plants 14. Regulatory Guide 1.74, Quality Assurance Terms and Definitions
: 15. Regulatory Guide 1.88, Collection, Storage, and Maintenance of Nuclear Power Plant Quality Assurance Records 16. HCGS-UFSAR Regulatory Guide 1. 94, Quality Assurance Requirements Installation, Inspection, and Testing of Structural 17.2-10 Revision O April 11, 1988 for
: 15. Regulatory Guide 1.88, Collection, Storage, and Maintenance of Nuclear Power Plant Quality Assurance Records 16. HCGS-UFSAR Regulatory Guide 1. 94, Quality Assurance Requirements Installation, Inspection, and Testing of Structural 17.2-10 Revision O April 11, 1988 for
* 17 . Concrete and Structural Steel during the Construction Phase of Nuclear Power Plants Regulatory Guide 1.116, Installation, Inspection, System Quality Assurance Requirements for and Testing of Mechanical Equipment and 18. Regulatory Guide 1.123, Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants 19. Regulatory Guide 1.137, Generators Fuel-Oil Systems for Standby Diesel 20. Regulatory Guide 1.143, Design Guidance for Radioactive Waste Management Systems, Structures, and Components Installed in Light Water Cooled Nuclear Power Plants. 21. Regulatory Guide 1.144, Auditing of Quality Assuran.ce Programs for I Nuclear Power Plants 22. Regulatory Guide 1.146, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants 23. BTP 9.5-1, Appendix A, Guidelines for Fire Protection for Nuclear Plants Docketed Prior to July 1, 1976. Commitments to Regulatory Guides, with respect to revision level, exceptions, etc, are contained in Section 1.8. The code QA requirements are used for the procurement of systems, components and structures covered by the ASME Boiler and Pressure Vessel Code Section III (classes 1, 2, and 3). The standard QA program controls apply to Q-Listed code items following receipt at the station. In addition, applicable requirements of Regulatory Guide 1.38 are applied to ASME Code procurements where necessary to assure safe shipment.
* 17 . Concrete and Structural Steel during the Construction Phase of Nuclear Power Plants Regulatory Guide 1.116, Installation, Inspection, System Quality Assurance Requirements for and Testing of Mechanical Equipment and 18. Regulatory Guide 1.123, Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants 19. Regulatory Guide 1.137, Generators Fuel-Oil Systems for Standby Diesel 20. Regulatory Guide 1.143, Design Guidance for Radioactive Waste Management Systems, Structures, and Components Installed in Light Water Cooled Nuclear Power Plants. 21. Regulatory Guide 1.144, Auditing of Quality Assuran.ce Programs for I Nuclear Power Plants 22. Regulatory Guide 1.146, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants 23. BTP 9.5-1, Appendix A, Guidelines for Fire Protection for Nuclear Plants Docketed Prior to July 1, 1976. Commitments to Regulatory Guides, with respect to revision level, exceptions, etc, are contained in Section 1.8. The code QA requirements are used for the procurement of systems, components and structures covered by the ASME Boiler and Pressure Vessel Code Section III (classes 1, 2, and 3). The standard QA program controls apply to Q-Listed code items following receipt at the station. In addition, applicable requirements of Regulatory Guide 1.38 are applied to ASME Code procurements where necessary to assure safe shipment.
Line 221: Line 221:
Personnel outside the QA organization who perform inspections and tests are trained and qualified in QA concepts and practices . 17.2-14 HCGS-UFSAR Revision 8 September 25, 1996   
Personnel outside the QA organization who perform inspections and tests are trained and qualified in QA concepts and practices . 17.2-14 HCGS-UFSAR Revision 8 September 25, 1996   
*
*
* Orientation is provided for new employees entering QA from other organizations within PSE&G and from outside the company. An outline of the course content and program objective is contained in the QA training and certification program. The training and certification program is designed to familiarize the employee with: 1. Codes, regulations, specifications, etc, applicable to nuclear and other power generation equipment  
* Orientation is provided for new employees entering QA from other organizations within PSE&G and from outside the company. An outline of the course content and program objective is contained in the QA training and certification program. The training and certification program is designed to familiarize the employee with: 1. Codes, regulations, specifications, etc, applicable to nuclear and other power generation equipment
: 2. QA procedures, instructions, specifications, documentation, records, etc 3. Auditing and assessment objectives and techniques  
: 2. QA procedures, instructions, specifications, documentation, records, etc 3. Auditing and assessment objectives and techniques
: 4. Operational Quality Assurance Program 5. Quality Assurance Operational Philosophy  
: 4. Operational Quality Assurance Program 5. Quality Assurance Operational Philosophy
: 6. Other organizations within PSE&G with which QA interfaces QA administers formal QA training sessions for personnel outside the QA organization who perform safety related activities.
: 6. Other organizations within PSE&G with which QA interfaces QA administers formal QA training sessions for personnel outside the QA organization who perform safety related activities.
The content of these training programs, dates of the sessions, and names of the attendees and their individual performance evaluations are documented and retained . 17.2-15 HCGS-UFSAR Revision 7 December 29, 1995   
The content of these training programs, dates of the sessions, and names of the attendees and their individual performance evaluations are documented and retained . 17.2-15 HCGS-UFSAR Revision 7 December 29, 1995   
Line 234: Line 234:
The Nuclear Training Center is responsible for the licensed operator training and retraining, in addition to other technical and supervisory training programs . 17.2-16 HCGS-UFSAR Revision 8 September 25, 1996   
The Nuclear Training Center is responsible for the licensed operator training and retraining, in addition to other technical and supervisory training programs . 17.2-16 HCGS-UFSAR Revision 8 September 25, 1996   
*
*
* General Employee Training, which is required for all personnel having access to the station, is the responsibility of the Manager &deg;!'ruelear seeurity  
* General Employee Training, which is required for all personnel having access to the station, is the responsibility of the Manager &deg;!'ruelear seeurity
:" wgg &sect;f. Training programs of supporting organizations are described in their manuals, which are required to comply with the QA program. 17.2.3 Design Control The scope of the design control program includes design activities associated with the preparation and review of design documents, including the correct translation of applicable regulatory requirements into design modification, procurement, and procedural documents.
:" wgg &sect;f. Training programs of supporting organizations are described in their manuals, which are required to comply with the QA program. 17.2.3 Design Control The scope of the design control program includes design activities associated with the preparation and review of design documents, including the correct translation of applicable regulatory requirements into design modification, procurement, and procedural documents.
The design control program includes activities such as field design engineering, computer programs, compatibility of materials, and accessibility for inservice inspection, maintenance, and repair. Issuance of new drawings and revisions to existing drawings require the implementation of a design change. The term design change as used throughout this document, shall apply to both design and configuration changes. The Nuclear Engineering Manual (NEM) procedures, provide implementation guidance for the intent of Regulatory Guide 1.64, "Quality Assurance Requirements for the Design of Nuclear Power Plants." QA will conduct periodic engineering process assessments which include procedures contained in the The Nuclear Engineering Department has the following responsibilities:  
The design control program includes activities such as field design engineering, computer programs, compatibility of materials, and accessibility for inservice inspection, maintenance, and repair. Issuance of new drawings and revisions to existing drawings require the implementation of a design change. The term design change as used throughout this document, shall apply to both design and configuration changes. The Nuclear Engineering Manual (NEM) procedures, provide implementation guidance for the intent of Regulatory Guide 1.64, "Quality Assurance Requirements for the Design of Nuclear Power Plants." QA will conduct periodic engineering process assessments which include procedures contained in the The Nuclear Engineering Department has the following responsibilities:
: 1. Prepare and update detailed engineering and design documents, including drawings and specifications, for all systems, components, and structures.  
: 1. Prepare and update detailed engineering and design documents, including drawings and specifications, for all systems, components, and structures.
: 2. Specify applicable codes, standards, regulatory and quality requirements acceptance standards, and other design input in design documents.  
: 2. Specify applicable codes, standards, regulatory and quality requirements acceptance standards, and other design input in design documents.
: 3. Identify systems, components, and structures that are covered by the quality assurance program. 4. Perform design verification for systems, components, and structures covered by the QA Program . 17.2-17 HCGS-UFSAR Revision 8 September 25, 1996   
: 3. Identify systems, components, and structures that are covered by the quality assurance program. 4. Perform design verification for systems, components, and structures covered by the QA Program . 17.2-17 HCGS-UFSAR Revision 8 September 25, 1996   
* * -"' . -*cz . **-,,. 5. Perform safety evaluations of proposed design changes, as required.
* * -"' . -*cz . **-,,. 5. Perform safety evaluations of proposed design changes, as required.
Sa . Apply Generic lOCFR 50.59 Safety Evaluation, as required, configuration changes that impact the SAR. 6. Prepare documents for procurement of equipment, materials, and components.  
Sa . Apply Generic lOCFR 50.59 Safety Evaluation, as required, configuration changes that impact the SAR. 6. Prepare documents for procurement of equipment, materials, and components.
: 7. Recommend engineering consultants and laboratories for procurement services and coordinate their activities.  
: 7. Recommend engineering consultants and laboratories for procurement services and coordinate their activities.
: 8. Review design documents submitted by suppliers (including the Nuclear Steam Supply System (NSSS) supplier) and contractors.  
: 8. Review design documents submitted by suppliers (including the Nuclear Steam Supply System (NSSS) supplier) and contractors.
: 9. Specify, or approve as required, inspections and/or tests 10. Designate whether they will seek the service of other qualified engineering organizations.
: 9. Specify, or approve as required, inspections and/or tests 10. Designate whether they will seek the service of other qualified engineering organizations.
The cognizant engineer is responsible for the identification and completion of design analyses.
The cognizant engineer is responsible for the identification and completion of design analyses.
Line 256: Line 256:
Specialized reviews should be used when uniqueness or special design considerations warrant. The responsibilities of the verifier, the areas and features to be verified, the pertinent considerations to be verified, and the extent of documentation are identified in procedures.
Specialized reviews should be used when uniqueness or special design considerations warrant. The responsibilities of the verifier, the areas and features to be verified, the pertinent considerations to be verified, and the extent of documentation are identified in procedures.
Control of this function is assured through periodic QA/NSR audits and assessments.
Control of this function is assured through periodic QA/NSR audits and assessments.
Design verification methods comply with applicable requirements of ANSI N45.2.11 and may include, but are not limited to: 1. Design reviews 2. Alternate or independent calculations  
Design verification methods comply with applicable requirements of ANSI N45.2.11 and may include, but are not limited to: 1. Design reviews 2. Alternate or independent calculations
: 3. Qualification testing. In the event that the verification method for design modifications is only by test, procedures and instructions will be written which include measures to ensure that: 17.2-19 HCGS-UFSAR Revision 8 September 25, 1996   
: 3. Qualification testing. In the event that the verification method for design modifications is only by test, procedures and instructions will be written which include measures to ensure that: 17.2-19 HCGS-UFSAR Revision 8 September 25, 1996   
*
*
* 1. Criteria are provided to specify when verification should be by test . 2. Where applicable, prototype, component or feature testing will be performed prior to installation of plant equipment.
* 1. Criteria are provided to specify when verification should be by test . 2. Where applicable, prototype, component or feature testing will be performed prior to installation of plant equipment.
In those cases where this cannot be met, the testing will be deferred but not beyond the point when the installation would be irreversible.  
In those cases where this cannot be met, the testing will be deferred but not beyond the point when the installation would be irreversible.
: 3. Tests will be performed under conditions that simulate the most adverse design conditions, as determined by analysis.
: 3. Tests will be performed under conditions that simulate the most adverse design conditions, as determined by analysis.
Drawings are prepared by, or under the supervision of a designer from information received from the responsible engineer, manufacturer's drawings, etc. The drawings are reviewed and initialed as being checked by another designer or design supervisor.
Drawings are prepared by, or under the supervision of a designer from information received from the responsible engineer, manufacturer's drawings, etc. The drawings are reviewed and initialed as being checked by another designer or design supervisor.
The drawings are approved by the functional supervisor or his designee.
The drawings are approved by the functional supervisor or his designee.
Specifications and changes thereto for items covered by the QA program are prepared by Nuclear Engineering and are reviewed by Supplier Assessment for QA content. QA review assures that the documents are prepared, reviewed, and approved in accordance with company procedures and that the documents contain the necessary QA requirements such as inspection and test requirements, acceptance requirements, and the extent of documenting inspection and test results . The Station Operations Review Committee (SORC) reviews proposed changes affecting nuclear safety and makes recommendations concerning implementation of the change to the station general manager. The design change process provides for sign-off of the design change by the appropriate department head for the purpose of identifying required procedure change. If the proposed modification involves a Technical Specification change, or is considered by the SORC to involve an unreviewed safety question (10CFR50.59), the 17.2-20 HCGS-UFSAR Revision 8 September 25, 1996 matter is submitted to the Offoite Safety Review Group (OSR) for a determination of its safety implication before a license change request is submitted for NRC approval.
Specifications and changes thereto for items covered by the QA program are prepared by Nuclear Engineering and are reviewed by Supplier Assessment for QA content. QA review assures that the documents are prepared, reviewed, and approved in accordance with company procedures and that the documents contain the necessary QA requirements such as inspection and test requirements, acceptance requirements, and the extent of documenting inspection and test results . The Station Operations Review Committee (SORC) reviews proposed changes affecting nuclear safety and makes recommendations concerning implementation of the change to the station general manager. The design change process provides for sign-off of the design change by the appropriate department head for the purpose of identifying required procedure change. If the proposed modification involves a Technical Specification change, or is considered by the SORC to involve an unreviewed safety question (10CFR50.59), the 17.2-20 HCGS-UFSAR Revision 8 September 25, 1996 matter is submitted to the Offoite Safety Review Group (OSR) for a determination of its safety implication before a license change request is submitted for NRC approval.
For Huelear Engineering prepared PBK&#xa5;:i'.S  
For Huelear Engineering prepared PBK&#xa5;:i'.S
::::&sect;p:g ::t#\#.fi),g#,'%t:$&sect;H  
::::&sect;p:g ::t#\#.fi),g#,'%t:$&sect;H  
\&sect;# design changes, Nuclear Engineering assigns a project team led by a project manager)
\&sect;# design changes, Nuclear Engineering assigns a project team led by a project manager)
Line 275: Line 275:
QA review assures that spare and replacement parts are procured using controls which are commensurate with current QA program requirements.
QA review assures that spare and replacement parts are procured using controls which are commensurate with current QA program requirements.
17.2-21 HCGS-UFSAR Revision 8 September 25, 1996
17.2-21 HCGS-UFSAR Revision 8 September 25, 1996
* The review also assures that procurement documents adequately and correctly:  
* The review also assures that procurement documents adequately and correctly:
: 1. Identify applicable QA program requirements  
: 1. Identify applicable QA program requirements
: 2. Reference applicable regulatory requirements, codes, and standards  
: 2. Reference applicable regulatory requirements, codes, and standards
: 3. Provide right of access for source surveillance and audit by QA or its agents 4. Provide for required supplier documentation to be submitted to PSE&G or maintained by the supplier, as appropriate  
: 3. Provide right of access for source surveillance and audit by QA or its agents 4. Provide for required supplier documentation to be submitted to PSE&G or maintained by the supplier, as appropriate
: 5. Provide for PSE&G review and approval of critical procedures prior to fabrication, as appropriate.
: 5. Provide for PSE&G review and approval of critical procedures prior to fabrication, as appropriate.
Procurement documents require suppliers and contractors of other than commercial grade items to provide services or components in accordance with a QA program that complies with applicable parts of 10CFR50, Appendix B. The requirement for notifying PSE&G of procurement requirements that have not been met is conveyed to the supplier through the standard warranty provisi.on contained in each purchase order. In addition, where 10CFR21 is imposed, suppliers are required to comply with applicable reporting requirements.
Procurement documents require suppliers and contractors of other than commercial grade items to provide services or components in accordance with a QA program that complies with applicable parts of 10CFR50, Appendix B. The requirement for notifying PSE&G of procurement requirements that have not been met is conveyed to the supplier through the standard warranty provisi.on contained in each purchase order. In addition, where 10CFR21 is imposed, suppliers are required to comply with applicable reporting requirements.
Line 295: Line 295:
Supplier documents are controlled according to contractual agreements with suppliers.
Supplier documents are controlled according to contractual agreements with suppliers.
The following is a generic listing of key documents for the operational phase, showing minimum organization responsibility for review and/or approval, including changes thereto: 1. Design specification  
The following is a generic listing of key documents for the operational phase, showing minimum organization responsibility for review and/or approval, including changes thereto: 1. Design specification  
-Nuclear Engineering, QA. 2. Design modification, manufacturing, construction, and installation drawings Nuclear Engineering, Nuclear Operations Services, station operations  
-Nuclear Engineering, QA. 2. Design modification, manufacturing, construction, and installation drawings Nuclear Engineering, Nuclear Operations Services, station operations
: 3. Procurement documents initiating Nuclear Business Unit organization, PHroaasin&sect;" Department, Nuclear Operations Services, QA 4. Nuclear Administrative Procedures Manual -Nuclear Business Unit organizations responsible for implementation, QA 5. Nuclear Business Unit second tier manuals, including station administrative procedures  
: 3. Procurement documents initiating Nuclear Business Unit organization, PHroaasin&sect;" Department, Nuclear Operations Services, QA 4. Nuclear Administrative Procedures Manual -Nuclear Business Unit organizations responsible for implementation, QA 5. Nuclear Business Unit second tier manuals, including station administrative procedures  
-cognizant department head, QA 6. Maintenance, modification, and calibration procedures for Q, F, and R designated station work activities  
-cognizant department head, QA 6. Maintenance, modification, and calibration procedures for Q, F, and R designated station work activities  
-
-
Station eperatiene  
Station eperatiene
: 7. Operating procedures  
: 7. Operating procedures  
-station operations HCGS-UFSAR 17.2-24 Revision 8 September 25, 1996
-station operations HCGS-UFSAR 17.2-24 Revision 8 September 25, 1996
: 8. UFSAR -Nuelear Operations Berviees and 9. 10. 11. other Nuclear Business Unit organizations responsible for implementing applicable sections.
: 8. UFSAR -Nuelear Operations Berviees and 9. 10. 11. other Nuclear Business Unit organizations responsible for implementing applicable sections.
In addition, QA reviews subsequent changes to UFSAR sections to the extent necessary for assuring compliance with applicable QA program requirements Maintenance, inspection, and testing instruction  
In addition, QA reviews subsequent changes to UFSAR sections to the extent necessary for assuring compliance with applicable QA program requirements Maintenance, inspection, and testing instruction  
Line 337: Line 337:
Procedures requfre Q, F, and R-designated materials, parts, and components to be marked or otherwise identified, and require that such identity be maintained either on the item or on records traceable to it throughout receipt, storage, installation, and use. Protection against use of incorrect or defective items is also provided.
Procedures requfre Q, F, and R-designated materials, parts, and components to be marked or otherwise identified, and require that such identity be maintained either on the item or on records traceable to it throughout receipt, storage, installation, and use. Protection against use of incorrect or defective items is also provided.
Material identification and traceability is maintained for rework, repairs, and modifications throughout operation.
Material identification and traceability is maintained for rework, repairs, and modifications throughout operation.
Organi2mtions whieh iH1pleH1ent requireffients for the identifieation and eontrol of Hlaterials, parts, and eoH1ponents inelude Nuelear Operations Serviees, Nuelear Engineering, station operations and QA for proeureff\ent doeuffient eontrols, and Proeureff\ent and Materials Hanagefftent, station operations aad QA for reeeipt, storage, installation, inspeetion and test aetivities. . e#mm?r&sect;::;::.  
Organi2mtions whieh iH1pleH1ent requireffients for the identifieation and eontrol of Hlaterials, parts, and eoH1ponents inelude Nuelear Operations Serviees, Nuelear Engineering, station operations and QA for proeureff\ent doeuffient eontrols, and Proeureff\ent and Materials Hanagefftent, station operations aad QA for reeeipt, storage, installation, inspeetion and test aetivities. . e#mm?r&sect;::;::.
: :
: :
1#Ma 17.2.9 Control of Special Processes Special process controls provide for the use of qualified procedures, equipment, personnel, and documentation of satisfactory completion of an activity.
1#Ma 17.2.9 Control of Special Processes Special process controls provide for the use of qualified procedures, equipment, personnel, and documentation of satisfactory completion of an activity.
Line 345: Line 345:
-Nuclear Engineering is 17.2-29 HCGS-UFSAR Revision 8 September 25, 29*95 responsible for preparing special process procedures such as concreting, protective coating and cleaning, while the Director Huclear Operations Services is responsible for preparing specifications for processes such as welding, brazing, soldering, and heat treating and . Nuclear Engineering is responsible for preparing specifications for non-destructive examination (NDE) . These specifications are reviewed and approved by QA_ for necessary quality content. QA monitoring assessments and audits assure that qualification of special processes, equipment and personnel have been satisfactorily performed.
-Nuclear Engineering is 17.2-29 HCGS-UFSAR Revision 8 September 25, 29*95 responsible for preparing special process procedures such as concreting, protective coating and cleaning, while the Director Huclear Operations Services is responsible for preparing specifications for processes such as welding, brazing, soldering, and heat treating and . Nuclear Engineering is responsible for preparing specifications for non-destructive examination (NDE) . These specifications are reviewed and approved by QA_ for necessary quality content. QA monitoring assessments and audits assure that qualification of special processes, equipment and personnel have been satisfactorily performed.
Procedures for implementing the requirements of the specifications are prepared either by the Nuclear Business Unit or by supplier personnel, and are reviewed by QA and the appropriate general manager or their designees, with the exception of special process procedures prepared by code suppliers holding a valid certificate of authorization.
Procedures for implementing the requirements of the specifications are prepared either by the Nuclear Business Unit or by supplier personnel, and are reviewed by QA and the appropriate general manager or their designees, with the exception of special process procedures prepared by code suppliers holding a valid certificate of authorization.
Qualification records of procedures, equipment, and personnel associated with special processes arc retained as stated in Section 17.2.17. 17.2.lO Inspection A planned inspection program is conducted and documented by personnel appropriately qualified in accordance with Section l 7. 2. 2. The inspection program verifies conformance to the established procedure, code, or standard, consistent with the item's or activity's importance to safety. The inspection program for maintenance and modification activities is based upon the following three important levels of inspection:  
Qualification records of procedures, equipment, and personnel associated with special processes arc retained as stated in Section 17.2.17. 17.2.lO Inspection A planned inspection program is conducted and documented by personnel appropriately qualified in accordance with Section l 7. 2. 2. The inspection program verifies conformance to the established procedure, code, or standard, consistent with the item's or activity's importance to safety. The inspection program for maintenance and modification activities is based upon the following three important levels of inspection:
: l. HCGS-UFSAR Worker Checks Quality cannot be achieved unless the worker performs the activity in a quality manner. The worker is the individual best able to control the quality of work performed.
: l. HCGS-UFSAR Worker Checks Quality cannot be achieved unless the worker performs the activity in a quality manner. The worker is the individual best able to control the quality of work performed.
Work steps that contain 17.2-30 Revision 8 September 25, 1996   
Work steps that contain 17.2-30 Revision 8 September 25, 1996   
Line 351: Line 351:
* 2. elements impacting plant equipment or systems have provisions for signoff by the worker. This worker sign-off establishes accountability for the activity and is acknowledgement that the activity has been performed as specified in the work step. Supervisory Inspection  
* 2. elements impacting plant equipment or systems have provisions for signoff by the worker. This worker sign-off establishes accountability for the activity and is acknowledgement that the activity has been performed as specified in the work step. Supervisory Inspection  
-Although the work supervisor may have overall responsibility for the conduct and performance of the work activity, certain conditions at the work location require supervisory inspection to increase confidence that work activities are completed as specified through familiarity of the work activity, work group, or past experience.
-Although the work supervisor may have overall responsibility for the conduct and performance of the work activity, certain conditions at the work location require supervisory inspection to increase confidence that work activities are completed as specified through familiarity of the work activity, work group, or past experience.
Supervisory inspections are established in the appropriate work procedure and accomplished through direct observation of the work activity.  
Supervisory inspections are established in the appropriate work procedure and accomplished through direct observation of the work activity.
: 3. Independent Inspection  
: 3. Independent Inspection  
-Independent inspections are not intended to dilute or replace the responsibility of the worker check or supervisory inspection for quality of work. Independent inspections provide the maximum confidence attainable that the work activity has been performed in accordance with the overall objective.
-Independent inspections are not intended to dilute or replace the responsibility of the worker check or supervisory inspection for quality of work. Independent inspections provide the maximum confidence attainable that the work activity has been performed in accordance with the overall objective.
Line 370: Line 370:
17.2-30b HCGS-UFSAR Revision 4 April 11, 1992   
17.2-30b HCGS-UFSAR Revision 4 April 11, 1992   
*
*
* 1. Storage areas 2. Housekeeping (general)  
* 1. Storage areas 2. Housekeeping (general)
: 3. Fire protection equipment  
: 3. Fire protection equipment
: 4. Special handling tools and equipment  
: 4. Special handling tools and equipment
: 5. NDE visual inspection required by the inservice inspection program. An independent organization shall perform NDE as required, using qualified individuals other than those who performed or directly supervised the activity.
: 5. NDE visual inspection required by the inservice inspection program. An independent organization shall perform NDE as required, using qualified individuals other than those who performed or directly supervised the activity.
When inspections are performed by individuals other than those who performed or directly supervised the work, but who belong to the same work group, and the activity involves breaching a pressure-retaining boundary, the quality of the work is demonstrated through appropriate testing, unless restrictions such as ALARA considerations prevent such testing. The applicable inspection and retest requirements necessary to assure that modifications, rework, or repairs have been accomplished correctly are included in the design change package, work order, or procedure.
When inspections are performed by individuals other than those who performed or directly supervised the work, but who belong to the same work group, and the activity involves breaching a pressure-retaining boundary, the quality of the work is demonstrated through appropriate testing, unless restrictions such as ALARA considerations prevent such testing. The applicable inspection and retest requirements necessary to assure that modifications, rework, or repairs have been accomplished correctly are included in the design change package, work order, or procedure.
Line 392: Line 392:
Provisions are implemented that assure that nonconformances are corrected or resolved prior to the initiation of the preoperational test program on the item. Retest requirements are provided by engineering specifications or the responsible engineer, or both as were the original test requirements.
Provisions are implemented that assure that nonconformances are corrected or resolved prior to the initiation of the preoperational test program on the item. Retest requirements are provided by engineering specifications or the responsible engineer, or both as were the original test requirements.
The Nuclear and operations departments are responsible for preparation of test procedures incorporating the engineering parameters.
The Nuclear and operations departments are responsible for preparation of test procedures incorporating the engineering parameters.
Test procedures prescribe, as applicable:  
Test procedures prescribe, as applicable:
: 1. 2. 3. 4. 5. 6 . HCGS-UFSAR Prerequisites, including completeness of test item(s) Instructions for performing the test Instrumentation and equipment for conduct of the test adequate to the test objective Suitable environmental conditions and adequate test methods Critical test sequence Acceptance criteria.
: 1. 2. 3. 4. 5. 6 . HCGS-UFSAR Prerequisites, including completeness of test item(s) Instructions for performing the test Instrumentation and equipment for conduct of the test adequate to the test objective Suitable environmental conditions and adequate test methods Critical test sequence Acceptance criteria.
17.2-35 Revision 8 September 25, 1996   
17.2-35 Revision 8 September 25, 1996   
Line 400: Line 400:
Detailed instructions for implementation of temporary changes are provided.
Detailed instructions for implementation of temporary changes are provided.
QA performs assessments of selected post modification tests to assure compliance with the test procedure.
QA performs assessments of selected post modification tests to assure compliance with the test procedure.
Test results are reviewed for the following:  
Test results are reviewed for the following:
: 1. Presentation of proper documentation  
: 1. Presentation of proper documentation
: 2. Assurance that tests meet objectives  
: 2. Assurance that tests meet objectives
: 3. Identification and reporting of unacceptable results and initiation of corrective measures.
: 3. Identification and reporting of unacceptable results and initiation of corrective measures.
17.2.12 Control of Measuring and Test Equipment Test equipment, instrumentation, and controls used to monitor and measure activities affecting quality and personnel safety are identified, controlled, and calibrated at specific intervals by cognizant Nuclear Business Unit personnel.
17.2.12 Control of Measuring and Test Equipment Test equipment, instrumentation, and controls used to monitor and measure activities affecting quality and personnel safety are identified, controlled, and calibrated at specific intervals by cognizant Nuclear Business Unit personnel.
Written procedures for meeting these requirements include provisions for: 1. 2 . HCGS-UFSAR Specifying calibration frequency Recording and maintaining calibration records 17.2-36 Revision 8 September 25, 1996   
Written procedures for meeting these requirements include provisions for: 1. 2 . HCGS-UFSAR Specifying calibration frequency Recording and maintaining calibration records 17.2-36 Revision 8 September 25, 1996   
* *
* *
* 3. Controlling and calibrating primary and secondary standards  
* 3. Controlling and calibrating primary and secondary standards
: 4. Determining methods of calibration  
: 4. Determining methods of calibration
: 5. Tracing use on safety-related items. Measuring and test equipment (M&TE) calibration procedures are prepared in accordance with the applicable supplier's manual requirements, unless specific exemption is approved by the cognizant station department head. M&TE, which is so exempted, is identified by use of a label or tag on the item. Prior use of measuring and test equipment found to be out of calibration is evaluated for possible effect on safety-related items. Measurements are repeated where necessary.
: 5. Tracing use on safety-related items. Measuring and test equipment (M&TE) calibration procedures are prepared in accordance with the applicable supplier's manual requirements, unless specific exemption is approved by the cognizant station department head. M&TE, which is so exempted, is identified by use of a label or tag on the item. Prior use of measuring and test equipment found to be out of calibration is evaluated for possible effect on safety-related items. Measurements are repeated where necessary.
Secondary standards are calibrated by certified calibration laboratories and are traceable to the National Institute of Standards and Technology (NIST) , or best industry standards where no NIST standards exist. Implementing procedures will provide for documenting the basis of calibrations which are not traceable to NIST. To the extent permitted by the state-of-the-art, the accuracy of the primary standards used to perform this calibration are at least four times greater than the accuracy of the device being calibrated.
Secondary standards are calibrated by certified calibration laboratories and are traceable to the National Institute of Standards and Technology (NIST) , or best industry standards where no NIST standards exist. Implementing procedures will provide for documenting the basis of calibrations which are not traceable to NIST. To the extent permitted by the state-of-the-art, the accuracy of the primary standards used to perform this calibration are at least four times greater than the accuracy of the device being calibrated.
Line 438: Line 438:
QA and other organizations in the Nuclear Business Unit review nonconformance reports for quality problems, including adverse quality trends, and initiate reports to higher management, identifying significant quality problems with recommendations for appropriate action. 17.2.16 Corrective Action Organizations involved in activities covered by the QA program are required to implement corrective action for significant conditions adverse to quality (SCAQ) and conditions adverse to quality identified within their scope of activity.
QA and other organizations in the Nuclear Business Unit review nonconformance reports for quality problems, including adverse quality trends, and initiate reports to higher management, identifying significant quality problems with recommendations for appropriate action. 17.2.16 Corrective Action Organizations involved in activities covered by the QA program are required to implement corrective action for significant conditions adverse to quality (SCAQ) and conditions adverse to quality identified within their scope of activity.
such conditions are documented and controlled by issuance of an action request. The QA Corrective Action Group reviews responses to action requests for adequacy and monitors these action requests through periodic summary and status reports to management.
such conditions are documented and controlled by issuance of an action request. The QA Corrective Action Group reviews responses to action requests for adequacy and monitors these action requests through periodic summary and status reports to management.
Responses to action requests are based on the four elements of corrective action, which are: 1. Identification of cause of deficiency  
Responses to action requests are based on the four elements of corrective action, which are: 1. Identification of cause of deficiency
: 2. Action to correct deficiency and results achieved to date 3. Action taken or to be taken to prevent recurrence  
: 2. Action to correct deficiency and results achieved to date 3. Action taken or to be taken to prevent recurrence
: 4. Date when full compliance was or will be achieved.
: 4. Date when full compliance was or will be achieved.
For significant conditions adverse to quality, such as LERs and NRC/INPO/CMAP findings, the QA Corrective Action Group is involved in the review of such conditions and provides oversight to assure timely 17.2-40 HCGS-UFSAR Revision 8 September 25, 1996   
For significant conditions adverse to quality, such as LERs and NRC/INPO/CMAP findings, the QA Corrective Action Group is involved in the review of such conditions and provides oversight to assure timely 17.2-40 HCGS-UFSAR Revision 8 September 25, 1996   
Line 463: Line 463:
Areas of deficiency revealed by audits are reviewed with management and are corrected in a timely manner. Required corrective action is documented and verified.
Areas of deficiency revealed by audits are reviewed with management and are corrected in a timely manner. Required corrective action is documented and verified.
Followup action, including reaudit of deficient areas, is performed.
Followup action, including reaudit of deficient areas, is performed.
The audit program conducted by QA includes, but is not limited to, the following activities covered by the QA program: 1. Operation, maintenance, and modification  
The audit program conducted by QA includes, but is not limited to, the following activities covered by the QA program: 1. Operation, maintenance, and modification
: 2. Preparation, review, approval, and control of design, specifications, procurement and requisition documents, instructions, procedures, and drawings 3. Inspection programs 4. Indoctrination and training 5. Implementation of operating and test procedures  
: 2. Preparation, review, approval, and control of design, specifications, procurement and requisition documents, instructions, procedures, and drawings 3. Inspection programs 4. Indoctrination and training 5. Implementation of operating and test procedures
: 6. Calibration of measuring and test equipment  
: 6. Calibration of measuring and test equipment
: 7. Fire protection  
: 7. Fire protection
: 8. Other applicable activities delineated in Table 17.2-1. The audit data is analyzed and a written report of the results of each audit is distributed to appropriate management representatives of the organization(s) audited, as well as other affected management personnel.
: 8. Other applicable activities delineated in Table 17.2-1. The audit data is analyzed and a written report of the results of each audit is distributed to appropriate management representatives of the organization(s) audited, as well as other affected management personnel.
Included in the report is a statement of QA program effectiveness.
Included in the report is a statement of QA program effectiveness.
Line 473: Line 473:
* TABLE 17.2-1 HOPE CREEK Q ACTIVITIES/SERVICES The listing below identifies those activities and services, to which the Operational QA program applies during operations:
* TABLE 17.2-1 HOPE CREEK Q ACTIVITIES/SERVICES The listing below identifies those activities and services, to which the Operational QA program applies during operations:
A. Safety-related activities delineated in Regulatory Guide 1. 33, Appendix A (See Regulatory Guide for further guidance on these activities)
A. Safety-related activities delineated in Regulatory Guide 1. 33, Appendix A (See Regulatory Guide for further guidance on these activities)
HCGS-UFSAR  
HCGS-UFSAR
: 1. The procedures that define safety-related processes and programs, and that provide for the control of nuclear operations, and that incorporate regulatory requirements and commitments, will be called administrative procedures.
: 1. The procedures that define safety-related processes and programs, and that provide for the control of nuclear operations, and that incorporate regulatory requirements and commitments, will be called administrative procedures.
Refer to Section 13.5.1. The following is a partial list of related administrative procedures: (a) Security Program, (Regulatory Guide 1.77) (b) Equipment Control, e.g., locking and tagging (c) Shift and Relief Turnover (d) . Bypass of Safety Functions and Jumper Control (e) Maintenance of Minimum Shift Complement and Call-In of Personnel (f) Fire Protection Program (FPP) including Inspection by Fire Consultants (g) Communication System.  
Refer to Section 13.5.1. The following is a partial list of related administrative procedures: (a) Security Program, (Regulatory Guide 1.77) (b) Equipment Control, e.g., locking and tagging (c) Shift and Relief Turnover (d) . Bypass of Safety Functions and Jumper Control (e) Maintenance of Minimum Shift Complement and Call-In of Personnel (f) Fire Protection Program (FPP) including Inspection by Fire Consultants (g) Communication System.
: 2. The general plant operating Procedures at Hope Creek will be called Integrated Operating Procedures (IOPs) . Refer to Section 13.5.2.1.2.  
: 2. The general plant operating Procedures at Hope Creek will be called Integrated Operating Procedures (IOPs) . Refer to Section 13.5.2.1.2.
: 3. The procedures for startup, operation and shutdown of safety related BWR systems at Hope Creek will be called System Operating Procedures (SOPs) . Safety related BWR systems for Hope Creek are designated as QA required in Table 3. 2-1. Refer to Section 13.5.2.1.1.  
: 3. The procedures for startup, operation and shutdown of safety related BWR systems at Hope Creek will be called System Operating Procedures (SOPs) . Safety related BWR systems for Hope Creek are designated as QA required in Table 3. 2-1. Refer to Section 13.5.2.1.1.
: 4. The procedures for offnormal or alarm Conditions of safety related BWR systems at Hope Creek will be called alarm response procedures.
: 4. The procedures for offnormal or alarm Conditions of safety related BWR systems at Hope Creek will be called alarm response procedures.
Safety related BWR systems for Hope Creek are designated as QA required in Table 3.2-1. Refer to Section 13.5.2.1.4.
Safety related BWR systems for Hope Creek are designated as QA required in Table 3.2-1. Refer to Section 13.5.2.1.4.
Line 483: Line 483:
*
*
* TABLE 17.2-1 (Cont) 5 . The procedures for combating emergencies and other significant events, at HCGS will be broken down into two categories:
* TABLE 17.2-1 (Cont) 5 . The procedures for combating emergencies and other significant events, at HCGS will be broken down into two categories:
Emergency Operating Procedures (EOPs) and Abnormal Operating Procedures (AOPs). Refer to Section 13.5.2.1.3.  
Emergency Operating Procedures (EOPs) and Abnormal Operating Procedures (AOPs). Refer to Section 13.5.2.1.3.
: 6. The procedures for the control of radioactivity will be broken down into several types to facilitate their use by the appropriate personnel.
: 6. The procedures for the control of radioactivity will be broken down into several types to facilitate their use by the appropriate personnel.
Structures, systems, and components that control the discharge of solid, liquid, or gaseous radioactive waste to the environment are designated as Quality Group R in Table 3. 2 -1. Refer to Section 13. 5. 2. 2. The following is a representative list of procedures and systems related to the control of radioactivity:
Structures, systems, and components that control the discharge of solid, liquid, or gaseous radioactive waste to the environment are designated as Quality Group R in Table 3. 2 -1. Refer to Section 13. 5. 2. 2. The following is a representative list of procedures and systems related to the control of radioactivity:
HCGS-UFSAR (a) Liquid Radioactive Waste System (b) Solid Waste System (c) BWR Gaseous Effluent System (d) Radiation Protection, including Occupational Radiation Exposure per Regulatory Guide 8.8 (e) Area Radiation Monitoring System Operation (f) Process Radiation Monitoring System Operation (g) Meteorological Monitoring and Data Collection Program (h) Packaging and Transport of Radioactive Material per 10CFR71 (i) Decontamination.  
HCGS-UFSAR (a) Liquid Radioactive Waste System (b) Solid Waste System (c) BWR Gaseous Effluent System (d) Radiation Protection, including Occupational Radiation Exposure per Regulatory Guide 8.8 (e) Area Radiation Monitoring System Operation (f) Process Radiation Monitoring System Operation (g) Meteorological Monitoring and Data Collection Program (h) Packaging and Transport of Radioactive Material per 10CFR71 (i) Decontamination.
: 7. The procedures for performing Technical Specification required surveillances will be broken down into several types to facilitate their use by the appropriate personnel.
: 7. The procedures for performing Technical Specification required surveillances will be broken down into several types to facilitate their use by the appropriate personnel.
Section 13.5.2. Refer to 8. The procedures for performing maintenance on safety related BWR systems at Hope Creek will be called maintenance procedures.
Section 13.5.2. Refer to 8. The procedures for performing maintenance on safety related BWR systems at Hope Creek will be called maintenance procedures.
Safety related BWR systems for Hope Creek are designated as QA required in Table 3.2-1. Refer to Section 13.5.2.2.5.  
Safety related BWR systems for Hope Creek are designated as QA required in Table 3.2-1. Refer to Section 13.5.2.2.5.
: 9. The procedures for chemical and radiochemical analysis, sample collection, maintenance of coolant quality, and maintaining concentrations of harmful agents within prescribed limits will be called chemistry procedures.
: 9. The procedures for chemical and radiochemical analysis, sample collection, maintenance of coolant quality, and maintaining concentrations of harmful agents within prescribed limits will be called chemistry procedures.
Refer to Section 13.5.2.2.1 . 2 of 3 Revision 8 September 25, 1996
Refer to Section 13.5.2.2.1 . 2 of 3 Revision 8 September 25, 1996
* TABLE 17.2-1 (Cont) B. Additional NRC requirements HCGS-UFSAR  
* TABLE 17.2-1 (Cont) B. Additional NRC requirements HCGS-UFSAR
: 1. Technical Specification Administrative Controls (a) StatieE: OperatieE:s Review Celftlftittee (SORG) (b) .Nuclear Safety Review (c) Reportable occurrences.  
: 1. Technical Specification Administrative Controls (a) StatieE: OperatieE:s Review Celftlftittee (SORG) (b) .Nuclear Safety Review (c) Reportable occurrences.
: 2. Inservice Inspection Plan 3. Reporting of Defects and Noncompliance.  
: 2. Inservice Inspection Plan 3. Reporting of Defects and Noncompliance.
: 4. Modifications to Site Grading. 3 of 3 Revision 8 September 25, 1996 TABLE 17.2-2 SEISMIC II/I -DESIGNATED STRUCTURES, SYSTEMS, AND COMPONENTS A seismic II/I designation is incorporated on the following design document types: a. Drawings 1. System isometrics 2 . Area drawings 3. Concrete unit masonry details 4. Heating & ventilation duct layout 5. Control room ceiling layouts 6 . Floor plans 7. Miscellaneous steel drawings 8. Piping and Instrumentation Diagrams (P&ID's) b. Indices 1. Pipe line index 2. Equipment index c. Specifications  
: 4. Modifications to Site Grading. 3 of 3 Revision 8 September 25, 1996 TABLE 17.2-2 SEISMIC II/I -DESIGNATED STRUCTURES, SYSTEMS, AND COMPONENTS A seismic II/I designation is incorporated on the following design document types: a. Drawings 1. System isometrics 2 . Area drawings 3. Concrete unit masonry details 4. Heating & ventilation duct layout 5. Control room ceiling layouts 6 . Floor plans 7. Miscellaneous steel drawings 8. Piping and Instrumentation Diagrams (P&ID's) b. Indices 1. Pipe line index 2. Equipment index c. Specifications
: 1. Acoustical unit ceilings 2. Insulation for reactor pressure vessel (RPV) and drywell piping equipment The Seismic II/I identification on drawings and indices is provided in the detail of the document, as necessary, to define "Q" items/boundaries.
: 1. Acoustical unit ceilings 2. Insulation for reactor pressure vessel (RPV) and drywell piping equipment The Seismic II/I identification on drawings and indices is provided in the detail of the document, as necessary, to define "Q" items/boundaries.
A "Q" suffix is added to the drawing number of those drawings that identify application of the Seismic II/I QA program. The Seismic II/I identification on specifications consists of adding a "Q" suffix to the specification number. 1 of 2 HCGS-UFSAR Revision 4 April 11, 1992   
A "Q" suffix is added to the drawing number of those drawings that identify application of the Seismic II/I QA program. The Seismic II/I identification on specifications consists of adding a "Q" suffix to the specification number. 1 of 2 HCGS-UFSAR Revision 4 April 11, 1992   
Line 501: Line 501:
* TABLE 17.2-2 (Cont) Seismic II/I structures, systems, and components are further delineated in Table 3.2-1 . 2 of 2 HCGS-UFSAR Revision O   
* TABLE 17.2-2 (Cont) Seismic II/I structures, systems, and components are further delineated in Table 3.2-1 . 2 of 2 HCGS-UFSAR Revision O   
*
*
* TABLE 17.2-3 F-DESIGNATED SYSTEMS An "F"-designation system is incorporated on the following design document types as a minimum: a. Drawings 1. P&IDs for Fire Protection System (FPS) 2. FPS safety-related area drawings 3. Fire wall location drawings 4. Structural steel fireproofing drawings 5. Concrete unit masonry details 6. Penetration seal details 7. Door hardware schedules  
* TABLE 17.2-3 F-DESIGNATED SYSTEMS An "F"-designation system is incorporated on the following design document types as a minimum: a. Drawings 1. P&IDs for Fire Protection System (FPS) 2. FPS safety-related area drawings 3. Fire wall location drawings 4. Structural steel fireproofing drawings 5. Concrete unit masonry details 6. Penetration seal details 7. Door hardware schedules
: 8. Lighting notes, symbols, and details 9. Lighting and telephone plans 10. FPS isometrics.  
: 8. Lighting notes, symbols, and details 9. Lighting and telephone plans 10. FPS isometrics.
: b. Indices 1. Pipe line index 2 . Equipment index 3. Instrument index 4. Valve index. FPS-QA identification system incorporation on drawings and indices is provided in the detail of the document, as necessary, to define "F" items/boundaries.
: b. Indices 1. Pipe line index 2 . Equipment index 3. Instrument index 4. Valve index. FPS-QA identification system incorporation on drawings and indices is provided in the detail of the document, as necessary, to define "F" items/boundaries.
An "F" suffix is added to the drawing number of those drawings that identify application of the FPS-QA program. Specifications are as follows: Deluge water spray and sprinkler system Fire and smoke detection system HCGS-UFSAR 1 of 2 Revision O April 11, 1988   
An "F" suffix is added to the drawing number of those drawings that identify application of the FPS-QA program. Specifications are as follows: Deluge water spray and sprinkler system Fire and smoke detection system HCGS-UFSAR 1 of 2 Revision O April 11, 1988   
Line 523: Line 523:
* *
* *
* 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE Public Service Electric and Gas Company (PSE&G) is responsible for assuring that the oper-;ci.tion, maintenance, refueling, and modification of the nuclear generating stations are accomplished in a manner that protects public health and safety and that is in compliance with applicable regulatory requirements.
* 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE Public Service Electric and Gas Company (PSE&G) is responsible for assuring that the oper-;ci.tion, maintenance, refueling, and modification of the nuclear generating stations are accomplished in a manner that protects public health and safety and that is in compliance with applicable regulatory requirements.
To carry out this responsibility, PSE&G developed and implemented a comprehensive Quality Assurance (QA) Program tnat was applicable to the design, construction, and testing phases and is now applied to the operation phase. The Operational Quality Assurance Program is described in the following doeumento:  
To carry out this responsibility, PSE&G developed and implemented a comprehensive Quality Assurance (QA) Program tnat was applicable to the design, construction, and testing phases and is now applied to the operation phase. The Operational Quality Assurance Program is described in the following doeumento:
: 1. NC.VP PO.ZZ OOlO{Q), Operational Quality Aoouranee Program establishes the Quality Assuranee Program. Nuclear Administrative Procedures the programs and processes that implement the QA Program. The QA Program provides measures to assure the control of activities affecting the quality function of structures, systems, and components, to an extent consistent with their importance to safety. The Quality Assurance Program encompasses fire protection of safety-related areas and other activities enumerated in Regulatory Guide 1.33. A planned monitoring assessment and audit program assures effective implementation of the Operational Quality Assurance Program. An assessment is a direct observation of activities and review of documentation to verify compliance/conformance to specified requirements and effectiveness of processes.
: 1. NC.VP PO.ZZ OOlO{Q), Operational Quality Aoouranee Program establishes the Quality Assuranee Program. Nuclear Administrative Procedures the programs and processes that implement the QA Program. The QA Program provides measures to assure the control of activities affecting the quality function of structures, systems, and components, to an extent consistent with their importance to safety. The Quality Assurance Program encompasses fire protection of safety-related areas and other activities enumerated in Regulatory Guide 1.33. A planned monitoring assessment and audit program assures effective implementation of the Operational Quality Assurance Program. An assessment is a direct observation of activities and review of documentation to verify compliance/conformance to specified requirements and effectiveness of processes.
The program provides coordinated and centralized quality assurance direction, control, and documentation as required by Nuclear Regulatory Commission (NRC} criteria set forth in lOCFRSO, Appendix B. The program provides for monitoring, assessing and auditing elements of the For-Duty (FFD} Program as set forth in 10CFR26 and is applied to, and includes non Q-list (i.e. balance of plant} activities and services necessary to achieve safety, reliability, availability, and economy in the operation of the Salem Generating Station. Applicable NRC Regulatory Guides, codes, and standards, as well as the policy statements contained in the Nuclear Administrative Procedures Manual, are used by PSE&G organizations performing activities affecting safety to prepare appropriate implementing procedures.
The program provides coordinated and centralized quality assurance direction, control, and documentation as required by Nuclear Regulatory Commission (NRC} criteria set forth in lOCFRSO, Appendix B. The program provides for monitoring, assessing and auditing elements of the For-Duty (FFD} Program as set forth in 10CFR26 and is applied to, and includes non Q-list (i.e. balance of plant} activities and services necessary to achieve safety, reliability, availability, and economy in the operation of the Salem Generating Station. Applicable NRC Regulatory Guides, codes, and standards, as well as the policy statements contained in the Nuclear Administrative Procedures Manual, are used by PSE&G organizations performing activities affecting safety to prepare appropriate implementing procedures.
Line 533: Line 533:
-Nuclear Business Unit (CNO/PNBU).
-Nuclear Business Unit (CNO/PNBU).
These policy statements are mandatory throughout the Company for nuclear facilities.
These policy statements are mandatory throughout the Company for nuclear facilities.
Key policy elements, as they apply to nuclear safety, include the following:  
Key policy elements, as they apply to nuclear safety, include the following:
: 1. Nuclear safety is of the highest priority and shall take precedence over matters concerning power production.  
: 1. Nuclear safety is of the highest priority and shall take precedence over matters concerning power production.
: 2. The public's health and safety is the prime consideration in the conduct and support of PSE&G's nuclear operations and shall not be compromised.
: 2. The public's health and safety is the prime consideration in the conduct and support of PSE&G's nuclear operations and shall not be compromised.
All decisions which could affect the health and safety of the public shall be made conservatively.  
All decisions which could affect the health and safety of the public shall be made conservatively.
: 3. The Operational Quality Assurance Program is an essential part of the PSE&G commitment to safe and reliable nuclear power operation.
: 3. The Operational Quality Assurance Program is an essential part of the PSE&G commitment to safe and reliable nuclear power operation.
Applicable program requirements shall be strictly adhered to in the performance of activities covered by the Operational Quality Assurance Program. PSE&G requires its suppliers and contractors to assume responsibility for establishing and implementing Quality Assurance/Quality Verification (QA/QV} programs, as applicable, to meet lOCFRSO, Appendix B. However, responsibility for the overall QA program is retained and exercised by PSE&G. QA reviews those programs and conducts appropriate monitoring and auditing as required to assure that the suppliers are properly implementing 17.2-2 SGS-UFSAR Revision 15 June 12, 1996   
Applicable program requirements shall be strictly adhered to in the performance of activities covered by the Operational Quality Assurance Program. PSE&G requires its suppliers and contractors to assume responsibility for establishing and implementing Quality Assurance/Quality Verification (QA/QV} programs, as applicable, to meet lOCFRSO, Appendix B. However, responsibility for the overall QA program is retained and exercised by PSE&G. QA reviews those programs and conducts appropriate monitoring and auditing as required to assure that the suppliers are properly implementing 17.2-2 SGS-UFSAR Revision 15 June 12, 1996   
Line 543: Line 543:
The Operational QA Program verifies that requirements necessary to assure quality are properly included or referenced in procurement documents.
The Operational QA Program verifies that requirements necessary to assure quality are properly included or referenced in procurement documents.
In addition, these suppliers' procurement documents include applicable PSE&G quality assurance requirements for items and services provided by their suppliers.
In addition, these suppliers' procurement documents include applicable PSE&G quality assurance requirements for items and services provided by their suppliers.
17.2.1 Organization The Operational QA Program, referred to hereafter as the QA Program, assures that adequate administrative and management controls are established for safe operation of the station. Implementation is assured by ongoing review, monitoring, assessment and audit under the direction of the Director -Quality Aoouranee/Nuelear Safety Review, who reports to the CNO/PNBU.  
17.2.1 Organization The Operational QA Program, referred to hereafter as the QA Program, assures that adequate administrative and management controls are established for safe operation of the station. Implementation is assured by ongoing review, monitoring, assessment and audit under the direction of the Director -Quality Aoouranee/Nuelear Safety Review, who reports to the CNO/PNBU.
::=:f.p::t?  
::=:f.p::t?  
.. .uzj:der:.
.. .uzj:der:.
Line 554: Line 554:
* *
* *
* 2. An annual assessment of the QA program that is preplanned and documented.
* 2. An annual assessment of the QA program that is preplanned and documented.
This assessment addresses the scope, status, and adequacy of the QA program. Corrective action is identified and tracked. l7.2.l.l.l Quality Assurance The DIR QA/HSR P;i:#*-'Stii?.@  
This assessment addresses the scope, status, and adequacy of the QA program. Corrective action is identified and tracked. l7.2.l.l.l Quality Assurance The DIR QA/HSR P;i:#*-'Stii?.@
:jj:fffS1#&#xa5;:!i*=1fiM{:  
:jj:fffS1#&#xa5;:!i*=1fiM{:  
&sect;R is responsible for defining, formulating, implementing, and coordinating the QA program. The DIR QA/NSR has been-delegated the authority and has the independence to interpret quality requirements, identify quality problems and trends, and provide recommendations or so 1 u ti ons to quality probl BPS#}f: g$#.f:gi\#1##&sect;Ji.
&sect;R is responsible for defining, formulating, implementing, and coordinating the QA program. The DIR QA/NSR has been-delegated the authority and has the independence to interpret quality requirements, identify quality problems and trends, and provide recommendations or so 1 u ti ons to quality probl BPS#}f: g$#.f:gi\#1##&sect;Ji.
The DIR QA/HBR ffW is responsible for approval of the QAf afffi NSR Department Manual used during the operations phase of the nuclear stations{
The DIR QA/HBR ffW is responsible for approval of the QAf afffi NSR Department Manual used during the operations phase of the nuclear stations{
The DIR Q."./N'BR also is responsible for verifying compliance with established requirements for the QA program through document review, inspection, monitoring, assessments and audits QA provides a centralized coordinating function for QA/QV activities applied to the operations phase. The DIR  
The DIR Q."./N'BR also is responsible for verifying compliance with established requirements for the QA program through document review, inspection, monitoring, assessments and audits QA provides a centralized coordinating function for QA/QV activities applied to the operations phase. The DIR
:::::::&#xa9;.B.$f.\ffi#:&#xa5;foii  
:::::::&#xa9;.B.$f.\ffi#:&#xa5;foii
::::::ffl&#xa5;)t:::rniue:
::::::ffl&#xa5;)t:::rniue:
has the authority and responsibility to stop work, through the issuance of a Stop Work Order, when significant conditions adverse to quality require such action . The PSE&G policies and organization structure assure that the DIR QA/N'BR, Directop*  
has the authority and responsibility to stop work, through the issuance of a Stop Work Order, when significant conditions adverse to quality require such action . The PSE&G policies and organization structure assure that the DIR QA/N'BR, Directop*  
Line 565: Line 565:
\])!::::m:;;::::::::i\@Rg!\\]f:lt'!
\])!::::m:;;::::::::i\@Rg!\\]f:lt'!
has sufficient organizational freedom and independence to carry out his responsibilities.
has sufficient organizational freedom and independence to carry out his responsibilities.
f:BP Responsibilities of the Manager -Corrective Action and Quality Services include the following:  
f:BP Responsibilities of the Manager -Corrective Action and Quality Services include the following:
: 1. PreparatieR aRd H1aiRteE:aRce of the QA/NBR DepartffleRt MaRual, the QA Preg:raffl deooription in the UFB.".R, and the Operational Program desoription in the nuclear Aeifflinistrative Procedures Manual. 2. Review of the Nuclear Administrative Procedures HaRual for compliaRce with the Operational QA Prograffl. 3 . Performing assessments of PSE&G Program administrative and implementing:
: 1. PreparatieR aRd H1aiRteE:aRce of the QA/NBR DepartffleRt MaRual, the QA Preg:raffl deooription in the UFB.".R, and the Operational Program desoription in the nuclear Aeifflinistrative Procedures Manual. 2. Review of the Nuclear Administrative Procedures HaRual for compliaRce with the Operational QA Prograffl. 3 . Performing assessments of PSE&G Program administrative and implementing:
procedures (as necessary, these assessfflents may also iRclude statioR administrative and implementing:
procedures (as necessary, these assessfflents may also iRclude statioR administrative and implementing:
Line 585: Line 585:
+/--:7-ib..
+/--:7-ib..
Perform material evaluation activities on items subject to the QA Program. :::::;:;:::;
Perform material evaluation activities on items subject to the QA Program. :::::;:;:::;
Responsibilities of the Manager -Quality Assessment include the following:  
Responsibilities of the Manager -Quality Assessment include the following:
:m:;
:m:;
17.2-5 SGS-UFSAR Revision 15 June 12, 1996
17.2-5 SGS-UFSAR Revision 15 June 12, 1996
Line 593: Line 593:
review for compliance with Inspection Hold Point (IHP) requirements.
review for compliance with Inspection Hold Point (IHP) requirements.
Performing Performance Based Inspections'/ (IHPs) .*.*.:
Performing Performance Based Inspections'/ (IHPs) .*.*.:
* Rcspoasibilitics of tfic Haaagcr Nuclear Safety Review arc described ia Scctioa 13.1. Reopoaoibilitieo of tfie Haaager Liceaoiag aad Regulatioa are described ia Scctioa 13.1.  
* Rcspoasibilitics of tfic Haaagcr Nuclear Safety Review arc described ia Scctioa 13.1. Reopoaoibilitieo of tfie Haaager Liceaoiag aad Regulatioa are described ia Scctioa 13.1.
:
:
f:i!#wii'&sect;F:&sect;*  
f:i!#wii'&sect;F:&sect;*  
Line 604: Line 604:
17.2-6 SGS-UFSAR Revision 15 June 12, 1996   
17.2-6 SGS-UFSAR Revision 15 June 12, 1996   
*
*
* The DIR fulfills the above qualifications with the addition of the following:  
* The DIR fulfills the above qualifications with the addition of the following:
: 1. Knowledge and experience in quality  
: 1. Knowledge and experience in quality
: 2. High level of leadership, with the ability to command the respect and cooperation of company personnel, suppliers, and construction forces. 3. Initiative and judgment to establish related policies to attain high achievements and economy of operations.
: 2. High level of leadership, with the ability to command the respect and cooperation of company personnel, suppliers, and construction forces. 3. Initiative and judgment to establish related policies to attain high achievements and economy of operations.
17.2.1.1.2 Operational Review  
17.2.1.1.2 Operational Review
:
:
advisory groups, the Station Operations Review Committee (SORC), Onsite Safety Review Group (SRG) , and the Offsite Safety Review Group (OSR) , are responsible for reviewing and evaluating items related to nuclear safety. The overall responsibilities of these groups are described in Section 13.4. **:*:.:*:*:*:*:*:*****:*:*:**** . The Manager Quality Assessment is to all SORC meetings and receives the minutes of the meetings, attends the meetings periodically.  
advisory groups, the Station Operations Review Committee (SORC), Onsite Safety Review Group (SRG) , and the Offsite Safety Review Group (OSR) , are responsible for reviewing and evaluating items related to nuclear safety. The overall responsibilities of these groups are described in Section 13.4. **:*:.:*:*:*:*:*:*****:*:*:**** . The Manager Quality Assessment is to all SORC meetings and receives the minutes of the meetings, attends the meetings periodically.
:;at:
:;at:
17.2.1.2 P4aplewood Teotinq Servieeo The P4anager Haplewood Testing Services reports to the Director Business and Maintenance Services in fossil generation.
17.2.1.2 P4aplewood Teotinq Servieeo The P4anager Haplewood Testing Services reports to the Director Business and Maintenance Services in fossil generation.
Line 637: Line 637:
0---* .,--......,.,;:*gt..,n;..+" x*-*c--<<'OF*
0---* .,--......,.,;:*gt..,n;..+" x*-*c--<<'OF*
Revision 11 July 22, 1991   
Revision 11 July 22, 1991   
* * ... &1 _...,. operational phase, this includes:  
* * ... &1 _...,. operational phase, this includes:
: 1. Structures, systems, and components delineated in Table 17.2-1, Section 2. 2. Safety-related activities delineated in Regulatory Guide 1.33 and summarized in Table 17.2-1, Section 1. 3. Portions of structures, systems, and components whose continued function is not required, but whose failure, caused by a safe shutdown earthquake (SSE), could reduce the functioning of a Seismic Category I structure, system, or component to an unacceptable safety level; or could result in an incapacitating injury to occupants of the control room as shown in Table 17.2-1. 4. Fire protection systems, including emergency lighting and communications, as shown in Table 17.2-1. 5. Radwaste management systems as described in Table 17.2-1. The QA program is applied during the operational phase using a graded approach to the extent consistent with the item's or activity's importance to safety. These activities are performed in compliance with applicable regulatory requirements that include but are not limited to: 1. Regulatory Guide 1.8, Qualification and Training of personnel for Nuclear Power Plants. 2. Regulatory Guide 1.17, Protection of Nuclear Plants Against Industrial Sabotage.  
: 1. Structures, systems, and components delineated in Table 17.2-1, Section 2. 2. Safety-related activities delineated in Regulatory Guide 1.33 and summarized in Table 17.2-1, Section 1. 3. Portions of structures, systems, and components whose continued function is not required, but whose failure, caused by a safe shutdown earthquake (SSE), could reduce the functioning of a Seismic Category I structure, system, or component to an unacceptable safety level; or could result in an incapacitating injury to occupants of the control room as shown in Table 17.2-1. 4. Fire protection systems, including emergency lighting and communications, as shown in Table 17.2-1. 5. Radwaste management systems as described in Table 17.2-1. The QA program is applied during the operational phase using a graded approach to the extent consistent with the item's or activity's importance to safety. These activities are performed in compliance with applicable regulatory requirements that include but are not limited to: 1. Regulatory Guide 1.8, Qualification and Training of personnel for Nuclear Power Plants. 2. Regulatory Guide 1.17, Protection of Nuclear Plants Against Industrial Sabotage.
: 3. Regulatory Guide 1.29, Seismic Design Classification.  
: 3. Regulatory Guide 1.29, Seismic Design Classification.
: 4. Regulatory Guide 1.30, Quality Assurance Requirements for the Installation, Inspection, and Testing of 17.2-9 SGS-UFSAR Revision 15 June 12, 1996   
: 4. Regulatory Guide 1.30, Quality Assurance Requirements for the Installation, Inspection, and Testing of 17.2-9 SGS-UFSAR Revision 15 June 12, 1996   
* *
* *
* SGS-UFSAR Instrumentation and Electric Equipment.  
* SGS-UFSAR Instrumentation and Electric Equipment.
: 5. Regulatory Guide 1. 33, Quality Assurance Program Requirements (Operation)  
: 5. Regulatory Guide 1. 33, Quality Assurance Program Requirements (Operation)
: 6. 7. Regulatory Guide 1.37, Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water Cooled Nuclear Power Plants. Regulatory Guide 1.38, Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water Cooled Nuclear Power Plants. 8. Regulatory Guide 1.39, Housekeeping Requirements for Water-Cooled Nuclear Power Plants. 9. Regulatory Guide 1. 54, QA Requirements for Protective Coatings Applied to Water-Cooled Nuclear Power Plants. 10. Regulatory Guide 1.58, Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel.  
: 6. 7. Regulatory Guide 1.37, Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water Cooled Nuclear Power Plants. Regulatory Guide 1.38, Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water Cooled Nuclear Power Plants. 8. Regulatory Guide 1.39, Housekeeping Requirements for Water-Cooled Nuclear Power Plants. 9. Regulatory Guide 1. 54, QA Requirements for Protective Coatings Applied to Water-Cooled Nuclear Power Plants. 10. Regulatory Guide 1.58, Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel.
: 11. Regulatory Guide 1. 64, Quality Assurance Requirements for the Design of Nuclear Power Plants . 12. Regulatory Guide 1. 88, Collection, Storage, and Maintenance of Nuclear Power Plant Quality Assurance Records. 13. Regulatory Guide 1.94, Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel during the Construction Phase of Nuclear Power Plants. 17.2-10 Revision 10 July 22, 1990
: 11. Regulatory Guide 1. 64, Quality Assurance Requirements for the Design of Nuclear Power Plants . 12. Regulatory Guide 1. 88, Collection, Storage, and Maintenance of Nuclear Power Plant Quality Assurance Records. 13. Regulatory Guide 1.94, Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel during the Construction Phase of Nuclear Power Plants. 17.2-10 Revision 10 July 22, 1990
* 14. Regulatory Guide 1.137, Fuel-Oil Systems for Standby Diesel Generators.  
* 14. Regulatory Guide 1.137, Fuel-Oil Systems for Standby Diesel Generators.
: 15. Regulatory Guide 1.144, Auditing of Quality Assurance Programs for Nuclear Power Plants. 16.
: 15. Regulatory Guide 1.144, Auditing of Quality Assurance Programs for Nuclear Power Plants. 16.
Guide 1.146, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants. 17. BTP 9.5-1, Appendix A, Guidelines for Fire Protection for Nuclear Plants Docketed Prior to July 1, 1976. Commitments to Regulatory Guides, with respect to revision level, exceptions, etc, are contained in Section 3, Appendix 3A. The code QA requirements are used for the procurement of systems, components, and structures covered by ASME Boiler and Pressure Vessel Code B31.l and B31.7 or evaluated to be an acceptable replacement.
Guide 1.146, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants. 17. BTP 9.5-1, Appendix A, Guidelines for Fire Protection for Nuclear Plants Docketed Prior to July 1, 1976. Commitments to Regulatory Guides, with respect to revision level, exceptions, etc, are contained in Section 3, Appendix 3A. The code QA requirements are used for the procurement of systems, components, and structures covered by ASME Boiler and Pressure Vessel Code B31.l and B31.7 or evaluated to be an acceptable replacement.
Line 658: Line 658:
?:El\ i:i.;:i;4 .
?:El\ i:i.;:i;4 .
ftae-J.:%y.E; the authority to stop work through the issuance of a Stop Work Order where continuance of an activity would seriously compromise quality or constitute a persistent and deliberate failure to correct a significant condition adverse to quality. Designees include the Manager Quality Assessment for activities conducted at the station and the Manager Corrective Actien and Quality Cervices for supplier activities.
ftae-J.:%y.E; the authority to stop work through the issuance of a Stop Work Order where continuance of an activity would seriously compromise quality or constitute a persistent and deliberate failure to correct a significant condition adverse to quality. Designees include the Manager Quality Assessment for activities conducted at the station and the Manager Corrective Actien and Quality Cervices for supplier activities.
QA reports significant conditions adverse to quality affecting the quality assurance program to respective management, along with: 1. Measures taken to improve QA program controls.  
QA reports significant conditions adverse to quality affecting the quality assurance program to respective management, along with: 1. Measures taken to improve QA program controls.
: 2. Appropriate recommendations to achieve compliance with applicable requirements.
: 2. Appropriate recommendations to achieve compliance with applicable requirements.
Management policy and administrative procedures provide all personnel with awareness and direction for reporting of defects and noncompliance pursuant to 10CFR21. The QA program requires that safety related activities and activities affecting the fire protection of safety-related areas, be accomplished under suitably controlled conditions.
Management policy and administrative procedures provide all personnel with awareness and direction for reporting of defects and noncompliance pursuant to 10CFR21. The QA program requires that safety related activities and activities affecting the fire protection of safety-related areas, be accomplished under suitably controlled conditions.
Line 666: Line 666:
17.2-13 SGS-UFSAR Revision 15 June 12, 1996 Personnel performing Q-Listed activities are trained or indoctrinated as necessary to assure that suitable proficiency is achieved and maintained.
17.2-13 SGS-UFSAR Revision 15 June 12, 1996 Personnel performing Q-Listed activities are trained or indoctrinated as necessary to assure that suitable proficiency is achieved and maintained.
Personnel outside the QA organization who perform inspections and tests are trained and qualified in QA concepts and practices.
Personnel outside the QA organization who perform inspections and tests are trained and qualified in QA concepts and practices.
Orientation is provided for new employees entering QA from other organizations within PSE&G and. from outside the company. An outline of the content and program objective is contained in the QA training and certification program. The training and certification program is designed to familiarize the employee with: 1. Codes, regulations, specifications, etc, applicable to nuclear and other power generation equipment.  
Orientation is provided for new employees entering QA from other organizations within PSE&G and. from outside the company. An outline of the content and program objective is contained in the QA training and certification program. The training and certification program is designed to familiarize the employee with: 1. Codes, regulations, specifications, etc, applicable to nuclear and other power generation equipment.
: 2. QA procedures, instructions, specifications, documentation, records, etc. 3. Auditing and assessment objectives and techniques.  
: 2. QA procedures, instructions, specifications, documentation, records, etc. 3. Auditing and assessment objectives and techniques.
: 4. Operational Quality Assurance Program. 5. Quality Assurance Operational Philosophy.  
: 4. Operational Quality Assurance Program. 5. Quality Assurance Operational Philosophy.
: 6. Other organizations within PSE&G with which QA interfaces.
: 6. Other organizations within PSE&G with which QA interfaces.
QA administers formal QA training sessions for personnel outside the QA organization who perform safety related activities.
QA administers formal QA training sessions for personnel outside the QA organization who perform safety related activities.
Line 684: Line 684:
The design control program includes activities such as field design engineering, associated computer programs, compatibility of 17.2-lSa SGS-UFSAR Revision 15 June 12, 1996 THIS PAGE INTENTIONALLY LEFT BLANK 17.2-lSb SGS-UFSAR Revision 13 June 12, 1994   
The design control program includes activities such as field design engineering, associated computer programs, compatibility of 17.2-lSa SGS-UFSAR Revision 15 June 12, 1996 THIS PAGE INTENTIONALLY LEFT BLANK 17.2-lSb SGS-UFSAR Revision 13 June 12, 1994   
* *
* *
* materials, and accessibility for inservice inspection, maintenance, and repair. Issuance of new drawings and revisions to existing drawings require the implementation of a design change. The term design change, as used throughout this document, shall apply to both design and configuration changes. The Nuclear Engjneering Manual (NEM) procedures provide implementation guidance for the intent of Regulatory Guide 1. 64, "Quality Assurance Requirements for the Design of Nuclear Power Plants." QA will conduct periodic engineering process assessments which include procedures contained in the The Nuclear Engineering Department has the following responsibilities:  
* materials, and accessibility for inservice inspection, maintenance, and repair. Issuance of new drawings and revisions to existing drawings require the implementation of a design change. The term design change, as used throughout this document, shall apply to both design and configuration changes. The Nuclear Engjneering Manual (NEM) procedures provide implementation guidance for the intent of Regulatory Guide 1. 64, "Quality Assurance Requirements for the Design of Nuclear Power Plants." QA will conduct periodic engineering process assessments which include procedures contained in the The Nuclear Engineering Department has the following responsibilities:
: 1. Prepare and update detailed engineering and design documents, including drawings and specifications, for all systems, components, and structures.  
: 1. Prepare and update detailed engineering and design documents, including drawings and specifications, for all systems, components, and structures.
: 2. Specify applicable codes, standards, regulatory and quality requirements acceptance standards, and other design input in design documents.  
: 2. Specify applicable codes, standards, regulatory and quality requirements acceptance standards, and other design input in design documents.
: 3. Identify systems, components, and structures that are covered by the quality assurance program . 4. Perform design verification for systems, components, and structures covered by the QA Program. 5. Perform safety evaluations of proposed design changes, as required.
: 3. Identify systems, components, and structures that are covered by the quality assurance program . 4. Perform design verification for systems, components, and structures covered by the QA Program. 5. Perform safety evaluations of proposed design changes, as required.
Sa. Apply Generic lOCFR 50. 59 Safety Evaluation, as required, to configuration changes that impact the SAR. 6. Prepare documents for procurement of equipment, materials, and components.
Sa. Apply Generic lOCFR 50. 59 Safety Evaluation, as required, to configuration changes that impact the SAR. 6. Prepare documents for procurement of equipment, materials, and components.
17.2-16 SGS-UFSAR Revision 15 June 12, 1996
17.2-16 SGS-UFSAR Revision 15 June 12, 1996
* 7. Recommend engineering consultants and laboratories for procurement services and coordinate their activities . 8. Review design documents submitted by suppliers (including the Nuclear Steam Supply System (NSSS) supplier) and contractors.  
* 7. Recommend engineering consultants and laboratories for procurement services and coordinate their activities . 8. Review design documents submitted by suppliers (including the Nuclear Steam Supply System (NSSS) supplier) and contractors.
: 9. Specify, or approve as required, inspections and/or tests. 10. Designate whether they will seek the service of other qualified engineering organizations.
: 9. Specify, or approve as required, inspections and/or tests. 10. Designate whether they will seek the service of other qualified engineering organizations.
The cognizant engineer is responsible for the identification and completion of design analyses.
The cognizant engineer is responsible for the identification and completion of design analyses.
Line 704: Line 704:
Specialized reviews should be used when uniqueness or special design considerations warrant. The responsibilities of the verifier, the areas and features to be verified, the pertinent considerations to be verified, and the extent of documentation are identified in procedures.
Specialized reviews should be used when uniqueness or special design considerations warrant. The responsibilities of the verifier, the areas and features to be verified, the pertinent considerations to be verified, and the extent of documentation are identified in procedures.
Control of this function is assured through periodic QA/NSR audits and assessments.
Control of this function is assured through periodic QA/NSR audits and assessments.
Design verification methods comply with applicable requirements of ANSI N45.2.ll and may include, but are not limited to: 1. Design reviews. 2. Alternate or independent calculations.  
Design verification methods comply with applicable requirements of ANSI N45.2.ll and may include, but are not limited to: 1. Design reviews. 2. Alternate or independent calculations.
: 3. Qualification testing. In the event that the verification method for design modifications is only by test, procedures and instructions will be written which include measures to ensure that: 1. Criteria are provided to specify when verification should be by test. 2. Where applicable, prototype, component or feature testing will be performed prior to installation of plant equipment.
: 3. Qualification testing. In the event that the verification method for design modifications is only by test, procedures and instructions will be written which include measures to ensure that: 1. Criteria are provided to specify when verification should be by test. 2. Where applicable, prototype, component or feature testing will be performed prior to installation of plant equipment.
In those cases where this cannot be met, the 17.2-18 SGS-UFSAR Revision 15 June 12, 1996   
In those cases where this cannot be met, the 17.2-18 SGS-UFSAR Revision 15 June 12, 1996   
*
*
* testing will be deferred, but not beyond the point when the installation would be irreversible.  
* testing will be deferred, but not beyond the point when the installation would be irreversible.
: 3. Tests will be performed under conditions that simulate the most adverse design conditions, as determined by analysis.
: 3. Tests will be performed under conditions that simulate the most adverse design conditions, as determined by analysis.
Drawings are prepared by, or under the supervision of, a designer from information received from the responsible engineer, manufacturer's drawings, etc. The drawings are reviewed and initialed as being checked by another designer or design supervisor.
Drawings are prepared by, or under the supervision of, a designer from information received from the responsible engineer, manufacturer's drawings, etc. The drawings are reviewed and initialed as being checked by another designer or design supervisor.
Line 725: Line 725:
17.2-20 SGS-UFSAR Revision 15 June 12, 1996   
17.2-20 SGS-UFSAR Revision 15 June 12, 1996   
*
*
* The review also assures that procurement documents adequately and correctly:  
* The review also assures that procurement documents adequately and correctly:
: 1. Identify applicable QA program requirements . 2. Reference applicable regulatory requirements, codes, and standards.  
: 1. Identify applicable QA program requirements . 2. Reference applicable regulatory requirements, codes, and standards.
: 3. Provide right of access for source surveillance and audit by QA or its agents. 4. Provide for required supplier documentation to be submitted to PSE&G or maintained by the supplier, as appropriate.  
: 3. Provide right of access for source surveillance and audit by QA or its agents. 4. Provide for required supplier documentation to be submitted to PSE&G or maintained by the supplier, as appropriate.
: 5. Provide for PSE&G review and approval of critical procedures prior to fabrication, as appropriate.
: 5. Provide for PSE&G review and approval of critical procedures prior to fabrication, as appropriate.
Procurement documents require suppliers and contractors of other than grade items to provide services or components in accordance with a QA program that complies with applicable parts of 10CFR50, Appendix B. The requirement for notifying PSE&G of procurement requirements that have not been met is conveyed to the supplier through the standard warranty provision contained in each purchase order. In addition, where 10CFR21 is imposed, suppliers are required to comply with applicable reporting requirements . 17.2.5 Instructions, Procedures, and Drawings Organizations engaged in Q-Listed activities are required to perform these activities in accordance with written and approved procedures, instructions, or drawings, as appropriate.
Procurement documents require suppliers and contractors of other than grade items to provide services or components in accordance with a QA program that complies with applicable parts of 10CFR50, Appendix B. The requirement for notifying PSE&G of procurement requirements that have not been met is conveyed to the supplier through the standard warranty provision contained in each purchase order. In addition, where 10CFR21 is imposed, suppliers are required to comply with applicable reporting requirements . 17.2.5 Instructions, Procedures, and Drawings Organizations engaged in Q-Listed activities are required to perform these activities in accordance with written and approved procedures, instructions, or drawings, as appropriate.
Line 745: Line 745:
Supplier documents are controlled according to contractual agreements with suppliers.
Supplier documents are controlled according to contractual agreements with suppliers.
The following is a generic listing of key documents for the operational phase, showing minimum organization responsibility for review and/or approval, including changes thereto: 1. Design specification  
The following is a generic listing of key documents for the operational phase, showing minimum organization responsibility for review and/or approval, including changes thereto: 1. Design specification  
-Nuclear Engineering, QA. 2. Design modification, manufacturing, construction, and installation drawings Nuclear Engineering, Nuclear Services, station operations.  
-Nuclear Engineering, QA. 2. Design modification, manufacturing, construction, and installation drawings Nuclear Engineering, Nuclear Services, station operations.
: 3. Procurement documents  
: 3. Procurement documents  
-Initiating NEU organization, Purchasing Departfflenl::, Nuclear Services, QA. 4 . 5. Nuclear Administrative Procedures Manual responsible for implementation, QA. NEU organizations NEU second-tier manuals, including station administrative procedures  
-Initiating NEU organization, Purchasing Departfflenl::, Nuclear Services, QA. 4 . 5. Nuclear Administrative Procedures Manual responsible for implementation, QA. NEU organizations NEU second-tier manuals, including station administrative procedures  
-Cognizant department head, QA. 6. Maintenance, modification, and calibration procedures for Q-Listed designated station work activities operations.  
-Cognizant department head, QA. 6. Maintenance, modification, and calibration procedures for Q-Listed designated station work activities operations.
: 7. Operating procedures  
: 7. Operating procedures  
-Station operations.
-Station operations.
Line 755: Line 755:
* 8. UFSAR -
* 8. UFSAR -
Operat:ions Services and other NBU organizations responsible for implementing applicable sections.
Operat:ions Services and other NBU organizations responsible for implementing applicable sections.
In addition, QA reviews subsequent changes to the UFSAR sections to the extent necessary for assuring compliance with applicable QA program requirements.  
In addition, QA reviews subsequent changes to the UFSAR sections to the extent necessary for assuring compliance with applicable QA program requirements.
: 9. Maintenance, inspection, and testing instruction  
: 9. Maintenance, inspection, and testing instruction  
-NBU implementing organizations.  
-NBU implementing organizations.
: 10. Post-modification test procedures  
: 10. Post-modification test procedures  
-Nuclear Engineering.  
-Nuclear Engineering.
: 11. Design Change Requests -Nuclear Engineering, QA. QA involvement in the work activity includes review of work procedures prior to approval for designation of inspection hold points (see Section 17.2.10), review of completed safety-related Work Orders on a sampling basis, and periodic QA surveillance and assessment.
: 11. Design Change Requests -Nuclear Engineering, QA. QA involvement in the work activity includes review of work procedures prior to approval for designation of inspection hold points (see Section 17.2.10), review of completed safety-related Work Orders on a sampling basis, and periodic QA surveillance and assessment.
The establishment and maintenance of a document control system for all instructions, procedures, specifications, and drawings received from the NBU or prepared at the station for use in operating, maintaining, refueling, or modifying items and services covered by the QA program is the responsibility of the eni or Vice President  
The establishment and maintenance of a document control system for all instructions, procedures, specifications, and drawings received from the NBU or prepared at the station for use in operating, maintaining, refueling, or modifying items and services covered by the QA program is the responsibility of the eni or Vice President  
Line 773: Line 773:
The responsible engineer and QA personnel select and evaluate prospective bidders and suppliers.
The responsible engineer and QA personnel select and evaluate prospective bidders and suppliers.
The responsible engineer determines the technical competence of the supplier, while QA evaluates the prospective supplier's QA program for the capability of meeting applicable requirements of 10CFR50, Appendix B, and for extending applicable program requirements to subtier suppliers.
The responsible engineer determines the technical competence of the supplier, while QA evaluates the prospective supplier's QA program for the capability of meeting applicable requirements of 10CFR50, Appendix B, and for extending applicable program requirements to subtier suppliers.
Qualified QA personnel evaluate the prospective supplier's QA capability using one or more techniques, including but not necessarily limited to: 1. Evaluation of supplier's or contractor's procedures or manuals and changes thereto. 2. ASME code stamp approval.  
Qualified QA personnel evaluate the prospective supplier's QA capability using one or more techniques, including but not necessarily limited to: 1. Evaluation of supplier's or contractor's procedures or manuals and changes thereto. 2. ASME code stamp approval.
: 3. Nuclear Utility Procurement Issues Council (NUPIC) or Nuclear Fuel Users Forum (NFUF) Audits. 4. Satisfactory past history of providing similar items. 17.2-25 SGS-UFSAR Revision 15 June 12, 1996   
: 3. Nuclear Utility Procurement Issues Council (NUPIC) or Nuclear Fuel Users Forum (NFUF) Audits. 4. Satisfactory past history of providing similar items. 17.2-25 SGS-UFSAR Revision 15 June 12, 1996   
* *
* *
Line 804: Line 804:
Nuclear Engineering is responsible for preparing specifications for nondestructive examination (NDE). reviewed and approved by QA for necessary quality These specifications are content. QA moni taring assessements and audits assure that qualification of special processes, equipment, and personnel have been satisfactorily performed.
Nuclear Engineering is responsible for preparing specifications for nondestructive examination (NDE). reviewed and approved by QA for necessary quality These specifications are content. QA moni taring assessements and audits assure that qualification of special processes, equipment, and personnel have been satisfactorily performed.
Procedures for implementing the requirements of the specifications are prepared either by the NEU or by supplier personnel and are reviewed by QA and the appropriate general manager, or their designee, with the exception of special process procedures prepared by code suppliers holding a valid certificate of authorization.
Procedures for implementing the requirements of the specifications are prepared either by the NEU or by supplier personnel and are reviewed by QA and the appropriate general manager, or their designee, with the exception of special process procedures prepared by code suppliers holding a valid certificate of authorization.
Qualification records of procedures, equipment, and personnel associated with special processes are retained as stated in Section 17.2.17. 17.2.10 Inspection A planned inspection program is conducted and documented by personnel appropriately qualified in accordance with Section 17. 2. 2. The inspection program verifies conformance to the established procedure, code, or standard, consistent with the item's or activity's importance to safety. The inspection program for maintenance and modification activities is based upon the following three _important levels of inspection:  
Qualification records of procedures, equipment, and personnel associated with special processes are retained as stated in Section 17.2.17. 17.2.10 Inspection A planned inspection program is conducted and documented by personnel appropriately qualified in accordance with Section 17. 2. 2. The inspection program verifies conformance to the established procedure, code, or standard, consistent with the item's or activity's importance to safety. The inspection program for maintenance and modification activities is based upon the following three _important levels of inspection:
: 1. SGS-UFSAR Worker Checks Quality cannot be achieved unless the worker performs the activity individual best able in a quality manner. The worker is the to control the quality of work being performed.
: 1. SGS-UFSAR Worker Checks Quality cannot be achieved unless the worker performs the activity individual best able in a quality manner. The worker is the to control the quality of work being performed.
Work steps that contain elements impacting plant equipment or systems have provisions for signoff by the worker. This worker signoff establishes accountability for the activity and is 17.2-29 Revision 15 June 12, 1996
Work steps that contain elements impacting plant equipment or systems have provisions for signoff by the worker. This worker signoff establishes accountability for the activity and is 17.2-29 Revision 15 June 12, 1996
* acknowledgement that the activity has been performed as specified in the work step. 2. Supervisory Inspection  
* acknowledgement that the activity has been performed as specified in the work step. 2. Supervisory Inspection  
-Although the work supervisor may have overall responsibility for the conduct and performance of the work activity, certain conditions at the work location require supervisory inspection to increase coqfidence that work activities are completed as specified through familiarity of the work activity, work group, or past experience.
-Although the work supervisor may have overall responsibility for the conduct and performance of the work activity, certain conditions at the work location require supervisory inspection to increase coqfidence that work activities are completed as specified through familiarity of the work activity, work group, or past experience.
Supervisory inspections are established in the appropriate work procedure and accomplished through direct observation of the work activity.  
Supervisory inspections are established in the appropriate work procedure and accomplished through direct observation of the work activity.
: 3. Independent Inspection  
: 3. Independent Inspection  
-Independent inspections are not intended to dilute or replace the responsibility of the worker check or supervisory inspection for quality of work. Independent inspections provide the maximum confidence attainable that the work activity has been performed in accordance with the overall objective.
-Independent inspections are not intended to dilute or replace the responsibility of the worker check or supervisory inspection for quality of work. Independent inspections provide the maximum confidence attainable that the work activity has been performed in accordance with the overall objective.
Line 824: Line 824:
Documentation includes inspection identification and results of inspection performance.
Documentation includes inspection identification and results of inspection performance.
As a result of its review, the Station Operations Review Committee (SORC) may recommend additional or different hold points to the organization performing the work activity . Periodic inspection, other than IHPs, is performed by qualified individuals other than those who performed or directly supervised the activity being inspected.
As a result of its review, the Station Operations Review Committee (SORC) may recommend additional or different hold points to the organization performing the work activity . Periodic inspection, other than IHPs, is performed by qualified individuals other than those who performed or directly supervised the activity being inspected.
These typically include periodic inspections of the following:  
These typically include periodic inspections of the following:
: 1. Storage areas. 2. Housekeeping (general).
: 1. Storage areas. 2. Housekeeping (general).
SGS-UFSAR 17.2-31 Revision 11 July 22, 1991   
SGS-UFSAR 17.2-31 Revision 11 July 22, 1991   
*  
*  
.. "* 3. Fire protection equipment.  
.. "* 3. Fire protection equipment.
: 4. Special handling tools and equipment.  
: 4. Special handling tools and equipment.
: 5. NDE visual inspection required by the inservice inspection program. An independent organization shall perform NDE as required, using qualified individuals other than those who performed or directly supervised the activity.
: 5. NDE visual inspection required by the inservice inspection program. An independent organization shall perform NDE as required, using qualified individuals other than those who performed or directly supervised the activity.
When inspections are performed by individuals other than those who performed or directly supervised the work, but who belong to the same work group, and the activity involves breaching a pressure-retaining boundary, the quality of the work is demonstrated through appropriate testing, unless restrictions such as ALARA considerations prevent such testing. The applicable inspection and retest requirements necessary to assure that modifications, rework, or repairs have been accomplished correctly are included in the design change package, work order, or procedure.
When inspections are performed by individuals other than those who performed or directly supervised the work, but who belong to the same work group, and the activity involves breaching a pressure-retaining boundary, the quality of the work is demonstrated through appropriate testing, unless restrictions such as ALARA considerations prevent such testing. The applicable inspection and retest requirements necessary to assure that modifications, rework, or repairs have been accomplished correctly are included in the design change package, work order, or procedure.
Line 840: Line 840:
Provisions are *implemented that assure that nonconformances are corrected or resolved prior to the initiation of the preoperational test program on the item. Retest requirements are provided by engineering specifications and/or the responsible engineer, or both as were the original test requirements.
Provisions are *implemented that assure that nonconformances are corrected or resolved prior to the initiation of the preoperational test program on the item. Retest requirements are provided by engineering specifications and/or the responsible engineer, or both as were the original test requirements.
The Nuclear and operations departments are responsible for preparation of test procedures incorporating the engineering parameters.
The Nuclear and operations departments are responsible for preparation of test procedures incorporating the engineering parameters.
Test procedures prescribe, as applicable:  
Test procedures prescribe, as applicable:
: 1. Prerequisites, including completeness of test item(s). 2. Instructions for performing the test. 3. Instrumentation and equipment for conduct of the test adequate to the test objective.  
: 1. Prerequisites, including completeness of test item(s). 2. Instructions for performing the test. 3. Instrumentation and equipment for conduct of the test adequate to the test objective.
: 4. Suitable environmental conditions and adequate test methods. 17.2-33 SGS-UFSAR Revision 15 June 12, 1996   
: 4. Suitable environmental conditions and adequate test methods. 17.2-33 SGS-UFSAR Revision 15 June 12, 1996   
*
*
* 5. Critical test sequence.  
* 5. Critical test sequence.
: 6. Acceptance criteria.
: 6. Acceptance criteria.
Test results, including verification of above items, are documented and reviewed for acceptability by the qualified department representative.
Test results, including verification of above items, are documented and reviewed for acceptability by the qualified department representative.
Line 850: Line 850:
Detailed instructions for implementation of temporary changes are provided.
Detailed instructions for implementation of temporary changes are provided.
QA performs assessments of selected post-modification tests to assure compliance with the test procedure.
QA performs assessments of selected post-modification tests to assure compliance with the test procedure.
Test results are reviewed for the following:  
Test results are reviewed for the following:
: 1. Presentation of proper documentation.  
: 1. Presentation of proper documentation.
: 2. Assurance that tests meet objectives.  
: 2. Assurance that tests meet objectives.
: 3. Identification and reporting of unacceptable results and initiation of corrective measures.
: 3. Identification and reporting of unacceptable results and initiation of corrective measures.
17.2.12 Control of Measuring and Test Equipment Test equipment, instrumentation, and controls used to monitor and measure activities affecting quality and personnel safety are identified, controlled, and calibrated at specific intervals by cognizant NEU personnel.
17.2.12 Control of Measuring and Test Equipment Test equipment, instrumentation, and controls used to monitor and measure activities affecting quality and personnel safety are identified, controlled, and calibrated at specific intervals by cognizant NEU personnel.
Written procedures for meeting these requirements include provisions for: 1. Specifying calibration frequency.  
Written procedures for meeting these requirements include provisions for: 1. Specifying calibration frequency.
: 2. Recording and maintaining calibration records. 3. Controlling and calibrating primary and secondary 17.2-34 SGS-UFSAR Revision 15 June 12, 1996   
: 2. Recording and maintaining calibration records. 3. Controlling and calibrating primary and secondary 17.2-34 SGS-UFSAR Revision 15 June 12, 1996   
*
*
* standards.  
* standards.
: 4. Determining methods of calibration . 5. Tracing use on Q-Listed items. Measuring and test equipment (M&TE) calibration procedures are prepared in accordance with the applicable supplier's manual requirements, unless specific exemption is approved by the cognizant station department head. M&TE, which is so exempted, is identified by use of a label or tag on the item. Prior use of measuring and test equipment found to be out of calibration is evaluated for possible effect on safety-related items. Measurements are repeated where necessary.
: 4. Determining methods of calibration . 5. Tracing use on Q-Listed items. Measuring and test equipment (M&TE) calibration procedures are prepared in accordance with the applicable supplier's manual requirements, unless specific exemption is approved by the cognizant station department head. M&TE, which is so exempted, is identified by use of a label or tag on the item. Prior use of measuring and test equipment found to be out of calibration is evaluated for possible effect on safety-related items. Measurements are repeated where necessary.
Secondary standards are calibrated by certified calibration laboratories and are traceable to the National Institute of Standards and Technology (NIST) , or best industry standards where no NIST standards exist. Implementing procedures will provide for documenting the basis of calibrations which are not traceable to NIST. To the extent permitted by the state of the art, the accuracy of the primary standards used to perform this calibration is at least four times greater than the accuracy of the device being calibrated.
Secondary standards are calibrated by certified calibration laboratories and are traceable to the National Institute of Standards and Technology (NIST) , or best industry standards where no NIST standards exist. Implementing procedures will provide for documenting the basis of calibrations which are not traceable to NIST. To the extent permitted by the state of the art, the accuracy of the primary standards used to perform this calibration is at least four times greater than the accuracy of the device being calibrated.
Line 868: Line 868:
Implementing procedures provide for the storage of chemicals, reagents (including control of shelf life), lubricants, and other consumable materials, as required.
Implementing procedures provide for the storage of chemicals, reagents (including control of shelf life), lubricants, and other consumable materials, as required.
The nuclear materials management group is responsible for control of material in storage, including preservation and shipping controls.
The nuclear materials management group is responsible for control of material in storage, including preservation and shipping controls.
The station departments  
The station departments
:are responsible for system cleanliness and handling of equipment during operational maintenance or modification.
:are responsible for system cleanliness and handling of equipment during operational maintenance or modification.
Nuclear Engineering is responsible for specifying equipment requirements.
Nuclear Engineering is responsible for specifying equipment requirements.
Line 887: Line 887:
* identifying significant quality problems with recommendations for appropriate action . 17.2.16 Corrective Action Organizations involved in activities covered by the QA program are required to implement corrective action for significant conditions adverse to quality and conditions adverse to quality identified within their scope of activity.
* identifying significant quality problems with recommendations for appropriate action . 17.2.16 Corrective Action Organizations involved in activities covered by the QA program are required to implement corrective action for significant conditions adverse to quality and conditions adverse to quality identified within their scope of activity.
Such conditions are documented and controlled by the issuance of an action request. The QA Corrective Action Group reviews responses to action requests for adequacy and monitors these action requests through periodic summary and status reports to management.*
Such conditions are documented and controlled by the issuance of an action request. The QA Corrective Action Group reviews responses to action requests for adequacy and monitors these action requests through periodic summary and status reports to management.*
Responses to action requests are based on the four elements of corrective action, which are: 1. Identification of cause of deficiency.  
Responses to action requests are based on the four elements of corrective action, which are: 1. Identification of cause of deficiency.
: 2. Action to correct deficiency and results achieved to date. 3. Action taken or to be taken to prevent recurrence.  
: 2. Action to correct deficiency and results achieved to date. 3. Action taken or to be taken to prevent recurrence.
: 4. Date when full compliance was or will be achieved.
: 4. Date when full compliance was or will be achieved.
For significant conditions adverse to qualityi!
For significant conditions adverse to qualityi!
Line 911: Line 911:
Areas of deficiency revealed by audits are reviewed with management and are corrected in a timely manner. Required corrective action is documented and verified.
Areas of deficiency revealed by audits are reviewed with management and are corrected in a timely manner. Required corrective action is documented and verified.
Followup action, including reaudit of deficient areas, is performed.
Followup action, including reaudit of deficient areas, is performed.
The audit program conducted by QA includes, but is not limited to, the following activities covered by the QA program: 1. Operation, maintenance, and modification.  
The audit program conducted by QA includes, but is not limited to, the following activities covered by the QA program: 1. Operation, maintenance, and modification.
: 2. SGS-UFSAR Preparation, review, approval, and control of design; specifications, procurement and requisition documents, instructions, procedures, and drawings.
: 2. SGS-UFSAR Preparation, review, approval, and control of design; specifications, procurement and requisition documents, instructions, procedures, and drawings.
17.2-40 Revision 15 June 12, 1996   
17.2-40 Revision 15 June 12, 1996   
*  
*  
-______ , *.. .. 3. Inspection programs.  
-______ , *.. .. 3. Inspection programs.
: 4. Indoctrination and training.  
: 4. Indoctrination and training.
: 5. Implementation of operating and test procedures.  
: 5. Implementation of operating and test procedures.
: 6. Calibration of measuring and test equipment.  
: 6. Calibration of measuring and test equipment.
: 7. Fire protection.  
: 7. Fire protection.
: 8. Other applicable activities delineated in Table 17.2-1. The audit data is analyzed, and a written report of the results of each audit is distributed to appropriate management representatives of the organization(s) audited, as well as other affected management personnel.
: 8. Other applicable activities delineated in Table 17.2-1. The audit data is analyzed, and a written report of the results of each audit is distributed to appropriate management representatives of the organization(s) audited, as well as other affected management personnel.
Included in the report is a statement of QA program effectiveness.
Included in the report is a statement of QA program effectiveness.
Line 927: Line 927:


===1.1 Safety===
===1.1 Safety===
Related Activities Delineated in Regulatory Guide 1.33, App. A (See Regulatory Guide for further breakdown of activities) 1.1.1 1.1.2 1.1. 3 1.1.4 1.1. 5 1.1. 6 Administrative Procedures  
Related Activities Delineated in Regulatory Guide 1.33, App. A (See Regulatory Guide for further breakdown of activities) 1.1.1 1.1.2 1.1. 3 1.1.4 1.1. 5 1.1. 6 Administrative Procedures
: a. Security Program (Regulatory Guide 1.17) b. Equipment Control (e.g., Locking and Tagging) c. Shift and Relief Turnover d. Bypass of Safety Functions and Jumper Control e. Maintenance of Minimum Shift Complement and Call-In of Personnel  
: a. Security Program (Regulatory Guide 1.17) b. Equipment Control (e.g., Locking and Tagging) c. Shift and Relief Turnover d. Bypass of Safety Functions and Jumper Control e. Maintenance of Minimum Shift Complement and Call-In of Personnel
: f. Fire Protection Program including Inspection by Fire Consultants  
: f. Fire Protection Program including Inspection by Fire Consultants
: g. Communication System  
: g. Communication System
: a. b. c. d. e. General Plant Operating Procedures Startup, Operation, and Shutdown of Safety-Related Systems Abnormal, Offnormal, or Alarm Conditions Combating Emergencies and Other Significant Events Control of Radioactivity Liquid Radioactive Waste System (including the contaminated floor and equipment drain systems) Solid Waste System PWR Gaseous Effluent System Radiation Protection including Occupational Radiation Exposure per Regulatory Guide 8.8 Area Radiation Monitoring System Operation 1 of 5 SGS-UFSAR Revision 13 June 12, 1994
: a. b. c. d. e. General Plant Operating Procedures Startup, Operation, and Shutdown of Safety-Related Systems Abnormal, Offnormal, or Alarm Conditions Combating Emergencies and Other Significant Events Control of Radioactivity Liquid Radioactive Waste System (including the contaminated floor and equipment drain systems) Solid Waste System PWR Gaseous Effluent System Radiation Protection including Occupational Radiation Exposure per Regulatory Guide 8.8 Area Radiation Monitoring System Operation 1 of 5 SGS-UFSAR Revision 13 June 12, 1994
* Table 17.2-1 (Cont) f. Process Radiation Monitoring System Operation  
* Table 17.2-1 (Cont) f. Process Radiation Monitoring System Operation
: g. h. Meteorological Monitoring and Data Collection Program Packaging and Transport of Radioactive Material per 10CFR71 i. Decontamination  
: g. h. Meteorological Monitoring and Data Collection Program Packaging and Transport of Radioactive Material per 10CFR71 i. Decontamination  


Line 948: Line 948:
====1.2.1 Technical====
====1.2.1 Technical====


Specification Administrative Controls a. SORG Reportable Occurrences  
Specification Administrative Controls a. SORG Reportable Occurrences
: 2. EQUIPMENT, COMPONENTS, AND STRUCTURES 2.1 The following are items and systems contained in commitment letters to the NRC. 2.1.1 Accident Monitoring Instrumentation 2.1.2 AC Control Power Buses and Inverters 2.1.3 All Systems Which Penetrate Containment, up to and including the Containment Isolation Valve (Identified in UFSAR Section 6.2.4) 2.1.4 Anticipatory Reactor Trip on Turbine Trip 2 .1. 5 Auxiliary Building (including Control Room and Diesel Generator Area) 2.1.6 Auxiliary Building Ventilation System (Supply and Exhaust Units) 2.1.7 Auxiliary Feedwater Storage Tank 2.1.8 Auxiliary Feedwater System 2.1.9 Component Cooling System 2.1.10 Chill Water System 2 of 5 SGS-UFSAR Revision 9 July 22, 1989 2.1.11 a. 2.1.12 2.1.13 2.1.14 2.1.15 2.1.16 2.1.17 a. b. c. d. Table 17.2-1 (Cont) Containment (including penetrations, concrete shielding, interior structures, air locks, equipment hatch) Containment Polar Crane Containment Pressure -Vacuum Relief System Control Area Air Conditioning System Control Panels -Class lE circuits Electrical Cable Tunnels Emergency Power for Pressurizer Heaters Emergency Power Supply System DC Power Supply System Diesel Generator Area Ventilation System Diesel Generators (including associated fuel oil, lube oil, starting auxiliary systems, fuel storage and day tanks, jacket cooling, governor, voltage regulation and excitation systems, piping and valves) Control Boards and Motor Control Centers e. Control equipment, facilities and lines required for above items f. 2.1.18 2.1.19 a. b. c. SGS-UFSAR Power distribution lines to equipment required for emergency transformers and switchgear supplying Engineered Safety Features (includes 4-kV, 460-V and 230-V vital buses) Emergency Response Facilities (NUREG-0737, Supplement l; document control and verification of functionality only) Engineered Safety Features Containment Spray System (including spray pumps, spray header, spray additive tank, connecting piping and valves) Containment Ventilation System (including fan coolers, distribution ducts, dampers, HEPA filters, and moisture separators)
: 2. EQUIPMENT, COMPONENTS, AND STRUCTURES 2.1 The following are items and systems contained in commitment letters to the NRC. 2.1.1 Accident Monitoring Instrumentation 2.1.2 AC Control Power Buses and Inverters 2.1.3 All Systems Which Penetrate Containment, up to and including the Containment Isolation Valve (Identified in UFSAR Section 6.2.4) 2.1.4 Anticipatory Reactor Trip on Turbine Trip 2 .1. 5 Auxiliary Building (including Control Room and Diesel Generator Area) 2.1.6 Auxiliary Building Ventilation System (Supply and Exhaust Units) 2.1.7 Auxiliary Feedwater Storage Tank 2.1.8 Auxiliary Feedwater System 2.1.9 Component Cooling System 2.1.10 Chill Water System 2 of 5 SGS-UFSAR Revision 9 July 22, 1989 2.1.11 a. 2.1.12 2.1.13 2.1.14 2.1.15 2.1.16 2.1.17 a. b. c. d. Table 17.2-1 (Cont) Containment (including penetrations, concrete shielding, interior structures, air locks, equipment hatch) Containment Polar Crane Containment Pressure -Vacuum Relief System Control Area Air Conditioning System Control Panels -Class lE circuits Electrical Cable Tunnels Emergency Power for Pressurizer Heaters Emergency Power Supply System DC Power Supply System Diesel Generator Area Ventilation System Diesel Generators (including associated fuel oil, lube oil, starting auxiliary systems, fuel storage and day tanks, jacket cooling, governor, voltage regulation and excitation systems, piping and valves) Control Boards and Motor Control Centers e. Control equipment, facilities and lines required for above items f. 2.1.18 2.1.19 a. b. c. SGS-UFSAR Power distribution lines to equipment required for emergency transformers and switchgear supplying Engineered Safety Features (includes 4-kV, 460-V and 230-V vital buses) Emergency Response Facilities (NUREG-0737, Supplement l; document control and verification of functionality only) Engineered Safety Features Containment Spray System (including spray pumps, spray header, spray additive tank, connecting piping and valves) Containment Ventilation System (including fan coolers, distribution ducts, dampers, HEPA filters, and moisture separators)
ECCS (including Safety Injection and RHR pumps, RWST, Accumulators, RHR heat exchangers, containment sump, sump screen vortex suppression devices, and connecting pipes and valves) 3 of 5 Revision 9 July 22, 1989 Table 17.2-1 (Cont) d. Portions of the CVCS (including Centrifugal Charging Pumps, Boron Injection Tank, connecting piping) 2.1.20 2.1.21 2. 1. 22 2.1.23 2.1.24 2.1.25 2 .1. 26 2.1.27 2.1.28 2. 1. 29 2.1.30 2 .1. 31 2.1.32 2 .1. 33 2. 1. 34 2.1.35 2.1.36 2.1.37 2.1.38 2.1.39 SGS-UFSAR Expendable and consumable items necessary for performance of critical structures, systems, (i.e., weld rod, boric acid, fuel oil, etc) Feedwater System (to outermost isolation valve) the functional and components Fire Protection System for safety-related areas (hardware)
ECCS (including Safety Injection and RHR pumps, RWST, Accumulators, RHR heat exchangers, containment sump, sump screen vortex suppression devices, and connecting pipes and valves) 3 of 5 Revision 9 July 22, 1989 Table 17.2-1 (Cont) d. Portions of the CVCS (including Centrifugal Charging Pumps, Boron Injection Tank, connecting piping) 2.1.20 2.1.21 2. 1. 22 2.1.23 2.1.24 2.1.25 2 .1. 26 2.1.27 2.1.28 2. 1. 29 2.1.30 2 .1. 31 2.1.32 2 .1. 33 2. 1. 34 2.1.35 2.1.36 2.1.37 2.1.38 2.1.39 SGS-UFSAR Expendable and consumable items necessary for performance of critical structures, systems, (i.e., weld rod, boric acid, fuel oil, etc) Feedwater System (to outermost isolation valve) the functional and components Fire Protection System for safety-related areas (hardware)
Line 954: Line 954:
Instrumentation for detection of inadequate core-cooling Leakage Detection System (as discussed in UFSAR Section 5.2.7) Main Steam System (to isolation valve) Meteorological Data Collection Program (hardware)
Instrumentation for detection of inadequate core-cooling Leakage Detection System (as discussed in UFSAR Section 5.2.7) Main Steam System (to isolation valve) Meteorological Data Collection Program (hardware)
Missile Barriers (protecting safety-related equipment)
Missile Barriers (protecting safety-related equipment)
Nuclear Instrumentation System Plant Shielding Process Instrumentation and Controls (those portions required for Class I equipment and systems) Radiation Monitoring System (those portions required for Class I equipment and systems) Radioactive Waste Disposal Systems 4 of 5 Revision 6 February 15, 1987
Nuclear Instrumentation System Plant Shielding Process Instrumentation and Controls (those portions required for Class I equipment and systems) Radiation Monitoring System (those portions required for Class I equipment and systems) Radioactive Waste Disposal Systems 4 of 5 Revision 6 February 15, 1987
: a. b. 2.1.40 2.1.41 2.1.42 2. 1. 43 2.1.44 2.1.45 2. 1. 46 2.1.47 2.1.48 2. 1. 49 2 .1. 50
: a. b. 2.1.40 2.1.41 2.1.42 2. 1. 43 2.1.44 2.1.45 2. 1. 46 2.1.47 2.1.48 2. 1. 49 2 .1. 50
* 2 .1. 51 2 .1. 52 2.2 SGS-UFSAR Table 17.2-1 (Cont) Gas Decay Systems Compressor Reactor Coolant System (including piping, valves, steam generators, pressurizer, safety and relief valves, block valves, piping to p!'essurizer relief tank, reactor coolant pumps, and supports)
* 2 .1. 51 2 .1. 52 2.2 SGS-UFSAR Table 17.2-1 (Cont) Gas Decay Systems Compressor Reactor Coolant System (including piping, valves, steam generators, pressurizer, safety and relief valves, block valves, piping to p!'essurizer relief tank, reactor coolant pumps, and supports)
Line 961: Line 961:
/\cllon & Qualily Services Ulreclor Assurance/-Nuclear S fc(y Review Manager Quality Assessment  
/\cllon & Qualily Services Ulreclor Assurance/-Nuclear S fc(y Review Manager Quality Assessment  
-{Mope-Greek)-
-{Mope-Greek)-
Manager)l alily As e(smenl (Salem) Manager EmployH Concerns f<tS.f)C/J CE slJI(  
Manager)l alily As e(smenl (Salem) Manager EmployH Concerns f<tS.f)C/J CE slJI(
: 17. z-1 lJ*, 01 A1/ACJ/*.IJ.
: 17. z-1 lJ*, 01 A1/ACJ/*.IJ.
PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM NUCLEAR GENERATING STATION QUALITY ASSURANCE UUCLEAR SAFETY REVIEW UNITS I & 2 Updated FSAR Figure 17.2*1 Revision 15 ShMI I of I i i QUALITY, NUCLEAR TRAINING & EMERGENCY PREPAREDNESS CHIEF NUCLEAR OFFICER & PRESIDENT  
PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM NUCLEAR GENERATING STATION QUALITY ASSURANCE UUCLEAR SAFETY REVIEW UNITS I & 2 Updated FSAR Figure 17.2*1 Revision 15 ShMI I of I i i QUALITY, NUCLEAR TRAINING & EMERGENCY PREPAREDNESS CHIEF NUCLEAR OFFICER & PRESIDENT  
-NBU DIRECTOR -QUALITY, NUCLEAR TRAINING AND EMERGENCY PREPAREDNESS LEGEND: I NRB --------, I I I I I I MANAGER QUALITY ASSESSMENT PROGRAM MANAGER-NRB REPORTS TO COORDINATION TECHNICAL TRAINING/SERVICES MANAGER OPERATIONS TRAINING MANAGER MANAGER CORRECTIVE ACTION EMERGENCY PREPAREDNESS MANAGER I MANAGER EMPLOYEE CONCERNS PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM NUCLEAR GENERATING STATION QUALITY, NUCLEAR TRAINING & EMERGENCY PREPAREDNESS Updated FSAR Figure 17.2-1 Revision 15 Sheet 1 of 1}}
-NBU DIRECTOR -QUALITY, NUCLEAR TRAINING AND EMERGENCY PREPAREDNESS LEGEND: I NRB --------, I I I I I I MANAGER QUALITY ASSESSMENT PROGRAM MANAGER-NRB REPORTS TO COORDINATION TECHNICAL TRAINING/SERVICES MANAGER OPERATIONS TRAINING MANAGER MANAGER CORRECTIVE ACTION EMERGENCY PREPAREDNESS MANAGER I MANAGER EMPLOYEE CONCERNS PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM NUCLEAR GENERATING STATION QUALITY, NUCLEAR TRAINING & EMERGENCY PREPAREDNESS Updated FSAR Figure 17.2-1 Revision 15 Sheet 1 of 1}}

Revision as of 13:46, 25 April 2019

Provides Clarifications & Enhancements Re Request to Change QA Program for Hope Creek & Salem Generating Stations
ML18102B380
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 06/06/1997
From: ELIASON L R
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LR-N970364, NUDOCS 9706110275
Download: ML18102B380 (141)


Text

{{#Wiki_filter:, ..* Public Service Electric and Gas Company

  • Leon R. Eliason Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1100 Chief Nuclear Officer & President Nuclear Business Unit JUN *6 1997 LR-N970364 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ENHANCEMENTS TO REQUEST FOR APPROVAL OF CHANGES TO THE QA PROGRAM HOPE CREEK AND SALEM GENERATING STATIONS FACILITY OPERATING LICENSES DPR-70, DPR-75, AND NPF-57 DOCKET NOS. 50-272, 50-311, AND 50-354 Ladies and Gentlemen:

On May 16, 1997, Public Service Electric and Gas Company (PSE&G) submitted a request to change the Quality Assurance (QA) Program for the Hope Creek and Salem Generating Stations, as documented in Section 17.2 of the respective Updated Final Safety Analysis Reports (UFSARs). Based upon discussions with the NRC staff, PSE&G is providing some clarifications and enhancements regarding the submittal. Details of those clarifications and enhancements are provided in Attachment 1 of this letter. The mark-ups of Section 17.2 of the Hope Creek and Salem UFSARs have been revised to reflect the clarifications and enhancements. Attachments 2 and 3 contain the revised Section 17.2 of the Hope Creek and Salem UFSARs, respectively. None of the clarifications or enhancements affect the basis for concluding that the requirements of 10CFR50, Appendix B would continue to be met. If you have any questions regarding this submittal, please do not hesitate to contact us. Sincerely, Attachments (3) 11 o o 9 7 . I !lllll f llll f lll{llll(l/llll llllllll llll

      • Document Control Desk LR-N970364 C Mr. H. Miller, Administrator

-Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

  • Mr. D. Jaffe, Licensing Project Manager -HC U. S. Nucl.ear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21, Rockville, MD 20852 JUN 6 Mr. L. Olshan, Licensing Project Manager -Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. S. Morris (X24) USNRC Senior Resident Inspector

-HC Mr. C. Marschall (X24) USNRC Senior Resident Inspector -Salem . Mr. K. Tosch, Manager IV Bureau* of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625 95-4933

  • Document Control Desk Attachment 1 HOPE CREEK GENERATION STATION AND LR-N970364 SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES NPF-57, DPR-70, AND DPR-75 DOCKET NOS. 50-354, 50-272, AND 50-311 ENHANCEMENTS TO REQUEST FOR APPROVAL OF CHANGES TO THE QA PROGRAM INTRODUCTION On May 16, 1997, Public Service Electric and Gas Company (PSE&G) submitted a request to change the Quality Assurance (QA) Program for the Hope Creek and Salem Generating Stations, as documented in Section 17.2 of the respective Updated Final Safety Analysis Reports (UFSARs).

Based upon discussions with the NRC staff, PSE&G is providing some clarifications and enhancements regarding the previous submittal. Details of those clarifications and enhancements are provided below. None of the clarifications or enhancements affect the basis for concluding that the requirements of 10CFR50, Appendix B would continue to be met. CLARIFICATIONS AND ENHANCEMENTS RELATED TO THE PROPOSED CHANGES Section 17.2.1.1.1 on Page 17.2-4 The following additional changes are being proposed to Section 17.2.1.1.1 on Page 17.2-4: The phrase "for all areas except those non-QA areas under his control" is being added at the end of the second sentence in Section 17.2.1.1.1. A statement is being added to state: "The full attention of the Director will be in support of QA activities and will take precedence over his non-QA activities. In the event of a conflict he will delegate all QA authority to the Manager -Quality Assessment if necessary. The Manager -Quality Assessment has the authority to report directly to the CNO/PNBU for these matters." With regard to the discussion of the deletion of the Nuclear Repair Program from the responsibilities of the Manager -Corrective Action and Quality Services, the following clarification is provided: The Nuclear Repair Program is PSE&G's ASME Section XI repair/replacement program, and additionally, serves to satisfy state of New Jersey requirements . Page 1of3

  • Document Control Desk Attachment 1 Section 17.2.1.1.1 on Page 17.2-5 LR-N970364 The description of the responsibilities of the Program Manager -Nuclear Review Board (NRB) is being modified to clarify that his role is a coordination role rather than a performance role. The Program Manager's responsibilities would include: 1) providing support to the NRB to ensure that it can perform its function, 2) providing administrative oversight of the NRB subcommittees and NRB independent reviews, 3) ensuring that all appropriate documents are presented to the NRB, and 4) managing and administering the training requirements for NRB personnel.

Figure 17.2-1 The NRB was added as a direct report to the CNO/PNBU. A line is drawn from the Program Manager-NRB to the NRB with a legend indicating that this is a coordination function. The legend also notes that the dotted line from the Manager -Quality Assessment to the CNO/PNBU indicates that the Manager -Quality Assessment reports to the CNO/PNBU. CLARIFICATIONS AND ENHANCEMENTS RELATED TO THE PREVIOUS CHANGES Hope Creek Change Notice 96-118/Salem Change Notice 96-172 Regarding Hope Creek Change Notice (HCN) 96-118 and Salem Change Notice (SCN) 96-172, the following additional information is provided: None of the information contained in NC.VP-PO.ZZ-0010(Q) was deleted when the content of the procedure was transferred to other documents. HCN 97-013/SCN 97-039 This change included the deletion of the list of Engineering responsibilities related to the design control program. This was identified as a reduction in commitment. This change notice will be revised such that the change is no longer considered a reduction in commitment. HCN 97-010/SCN 97-037 This change included the deletion provisions for providing for documenting the basis for calibrations which are not traceable to NIST. This was identified as a reduction in commitment. This

  • Document Control Desk Attachment 1 LR-N970364 change notice will be revised such that the change is no longer considered a reduction in commitment.

HCN 97-017/SCN 97-051 These change notices incorporated changes to reflect organizational changes approved by the NRC associated with Hope Creek License Amendment 97, Salem Unit 1 License Amendment 192, arid Salem Unit 2 License Amendment 175. In these change notices, SORC was added to the list under the administrative procedures section of Table 17.2-1; however, NRB was not. This submittal adds the NRB to the list . Page 3of3

  • *
  • Document Control Desk Attachment 2 LR-N970364 PROPOSED HOPE CREEK UFSAR CHANGES
  • 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE Public Service Electric and Gas Company (PSE&G) is responsible for assuring that the operation, maintenance, refueling and modification of the nuclear generating stations are accomplished in a manner that protects public health and safety and that it is in compliance with applicable regulatory requirements.

To carry out this PSE&G developed and implemented a comprehensive Quality Assurance Program that was applicable to the design, construction, and testing phases and is now applied to the operation phase. The Operational Quality Assurance Program is described in the following doeu!l'lento.

1. NC.VP PO.ZZ OOlO(Q) I Operational Quality Aoouranee Progra!l'I establishes the Quality Assurance Program. r,.. Nuclear Administrative Procedures Manualf -documents the programs and processes that implement the QA Program. The QA program provides measures to assure the control of activities affecting the quality of structures, systems, components, to an extent consistent with their importance to safety. The Quality Assurance Program encompasses fire protection of safety-related areas and other activities enumerated in Regulatory Guide 1.33. A planned monitoring assessment and audit program assures effective implementation of the Operational Quality Assurance Program. An assessment is a direct observation of activities and review of documentation to verify compliance/conformance to specified requirements and effectiveness of processes.

The program provides coordinated and centralized quality assurance direction, control, and documentation, as required by Nuclear Regulatory Commission (NRC) criteria set forth in lOCFRSO, Appendix B. The program provides for monitoring, assessing and auditing elements of the Fitness-For-Duty (FFD) Program as set forth in 10CFR26 and is applied to and includes non Q-list (i.e. balance of plant) activities and services necessary to achieve safety, reliability, availability and economy in the operation of Hope Creek Generating Station. Applicable NRC Regulatory Guides, codes, and standards, as well as the policy statements contained in the Nuclear Administrative Procedures Manual, are used by PSE&G organizations performing activities affecting safety to prepare appropriate implementing procedures. To assess the effectiveness of the PSE&G Quality Assurance Program, independent auditors from outside the company audit

  • the program every 2 years for compliance with lOCFRSO, Appendix B, and other regulatory commitments.

management . HCGS-UFSAR Reports of such audits are made directly to upper 17.2-1 Revision 8 September 25, 1996

  • Quality Assurance (QA) policy statements are issued by key management representatives, including the Chairman*and Chief Executive Officer and the Chief Nuclear Officer and President

-Nuclear Business Unit (CNO/PNBU) . These policy statements are mandatory throughout the Company for nuclear facilities . Key policy elements, as they apply to nuclear safety, include the following: -1. Nuclear safety is of the highest priority and shall take precedence over matters concerning power production.

2. The public's health and safety is the prime consideration in the conduct and support of Public Service Electric and Gas Company's nuclear operations and shall not be compromised.

All decisions which could affect the health and safety of the public shall be made conservatively.

3. The Operational Quality Assurance Program is an essential part of the PSE&G commitment to safe and reliable nuclear power operation.

Applicable program requirements shall be strictly adhered to in the performance of activities covered by the Operational Quality Assurance Program. PSE&G requires its suppliers and contractors to assume responsibility for establishing and implementing Quality Assurance/Quality Verification (QA/QV) programs, as applicable, to meet 10 CFR 50, Appendix B. However, responsibility for the overall QA program is retained and exercised by PSE&G. QA reviews those programs and conducts appropriate monitoring and auditing as required to assure that the suppliers are properly implementing their QA/QV programs. The Operational QA Program verifies that requirements necessary to assure quality are properly included or referenced in procurement documents. In addition, these suppliers' procurement documents include applicable PSE&G quality assurance requirements for items and services provided by their suppliers . 17.2-2 HCGS-UFSAR Revision 8 September 25, 1996

  • *
  • 17.2.1 Organization The Operational QA Program, referred to hereafter as the QA Program, assures that adequate administrative and management controls are established for the safe operation of the station. Implementation is assured by ongoing review, monitoring, assessment and audit under the direction of the Director -Quality Aoouranee/Nuelear Safety Revic;v, mtii who reports to the CNO/PNBU . .

¥#!%elii sent#B:f:i:l ?.#. mw. Company organization is shown on Figures 13.1-1 through 13.1-10 and* 17.2-1. Responsibilities for activities affecting safety are described in the following sections. 17.2.1.l Nuclear Department The CNO/PNBU is responsible for managing and directing the nuclear activities of the company. Overall duties and responsibilities of the Nuclear Business Unit are provided in Section 13.1. Vice Presidents, Directors and General Managers reporting to the CNO/PNBU are responsible for implementation of QA requirements by their staff. These QA requirements are contained in the Nuclear Administrative Procedures Manual and in individual department documents. The CNO/PNBU regularly assesses the scope, status, adequacy, and compliance of I the QA program to lOCFRSO, Appendix B through: 1. Frequent contacts in staff meetings, QA audit reports, audits by independent auditors, NRC inspection reports and department status reports. 2. An annual assessment of the QA program that is preplanned and HCGS-UFSAR documented. This assessment addresses the scope, status, and adequacy of the QA program. tracked. Corrective action is identified, and 17.2-3 Revision 8 September 25, 1996

  • 17.2.1.1.1 Quality Assurance The Director -

ijtjJq Quality AssuraHee/Huclear Safety Review is responsible for defining, formulating, implementing, and coordinating the QA program. He has been delegated the authority and has the independence to interpret quality requirements, identify quality problems and trends, and provide recommendations or solutions to quality problems He is responsible for approval of the QA/NSR Department Manual used during the operations phase of the nuclear stations. He also is responsible for verifying compliance with established requirements for the QA program through document review, inspection, monitoring, assessments and audits

nffi%:::

s§§p=re+/-i QA provides a centralized coordinating function for QA/QV activities applied to the operations phase. The Director - has the authority and responsibility to stop work, through the issuance of a Stop Work Order, when significant conditions adverse to quality require such action. The PSE&G policies and organization structure assure that the Director -QA/HSR has sufficient organizational freedom and independence to carry out his responsibilities. Responsibilities of the Manager -Corrective Action and Quality Servioeo include the following:

1. AdmiHistratioH of the Uuelear Repair -$.\. Review of engineering documents such as equipment specifications, weld procedures, ete. for inclusion of QA requirements.

Review and approve specifications for Q-listed materials, equipment, and services. Review of procurement documents for insertion of QA requirements. 5-t!* Conduct of supplier surveys, audits and surveillances . Evaluation of prospective and existing Supplier QA Programs. Administration of the Corrective Action Program.

  • /7. Performing statistical analysis trend reports for management.

17.2-4 HCGS-UFSAR Revision 8 September 25, 1996

  • *
  • Monitoring/auditing of nuclear fuel fabrication and installation.

M<:'9. Review of NBU fuel specifications for inclusion of QA requirements . *!-+/-),.§.. Perform material evaluation activities on items subject to the QA Program. 12. Perforffi Code related inspections and test perforffiance.

13. Perforffi design change package pre impleffientation review and closure review for oompliance with Inspeotion Hold Points (IHPs) . 11. Performing performance based inspections (IHPs) Responsibilities of the Manager -Quality Assessment include the following:

+:q m#it* 'ii!::

  1. fl Development and implementation of the QA Audit and Assessment Program. ;3.-_$# Performing assessments of contractor activities and evaluation of emergent contractor programs and procedures. §l,: Planning and scheduling of surveillances conducted within the Nuclear Business Unit. 4--:{. Performing station procedure review and concurrence.

h§% Preparation and maintenance of the QA/NSR Department Manual, the QA program description in the UFSAR, and the Operational QA Program description in the Nuclear Administrative Procedures Manual . h9:U Review of the Nuclear Administrative Procedures Manual for compliance with :::::::::::: the Operational QA Program. Performing assessments of PSE&G Program administrative and implementing

        • i; ***-
  • *
  • procedures (as necessary, these assessments may also include station administrative and implementing procedures) .S.'.J;::aj}

Conducting QA Program orientation for NBU personnel administering the training and certification program for QA personnel involved in inspection, assessments, and auditing activities, maintaining the QA training plan, and maintaining QA training records. 1g. Review of new regulatory requirements for QA program impact. Coordination of the commitment verification program on a selected basis. Mf j ::

\l#.g 2;\J#i::lli{i i'S:F

  1. iMt{i..:#:W
r1w 17.2-5 HCGS-UFSAR Revision 8 September 25, 1996
  • Responsibilities of the Manager Nuclear Safety Review are described in Section 13.1. Responsibilities of the Manag-er Licensing-and Regulation are described in Section 13.1.

rn ¥#8:Gides tlie f.sg+£¥tii,s:r * : :

  1. 9
  1. §:#B§P.#W t.:Mt:

qij.p) ::m%#B9ffu'. ?!f!§i

  • t?*B:Mfs#:§:
@@ F.##F NRB" independent r Responsibilities of the Manager Employee are described in section 13. 1. 17.2.1.1.1.1 Quality Assurance Personnel Qualifications The Director -

and the QA managers reporting directly to him must each have a combination of 6 years of experience in the field of QA and operations. At least 1 of these 6 years of experience must be in the overall implementation of a nuclear power plant QA program. A minimum of 1 year and a maximum of 4 of the 6 years of experience may be fulfilled by related technical or academic training. Personnel performing inspections, examinations, and test activities (i.e., to verify conformance) are certified as Level I, Level II, or Level III, as appropriate to their responsibilities, also in accordance with Regulatory Guide 1.58. Personnel performing quality assurance audits are certified as auditors or lead auditors, as appropriate to their responsibilities in accordance with Regulatory Guide 1.146. The Director - fulfills the above qualifications with the addition of the following:

1. Knowledge and experience in quality assurance,
  • 2. High level of leadership with the ability to command the respect and cooperation of company personnel, suppliers, and construction forces, 3. HCGS-UFSAR Initiative and judgment to establish related policies to attain high achievements and economy of operations.

17.2-6 Revision 8 September 25, 1996

  • 17.2.1.1.2 Operational Review '*1:t:

+ w P:§+.9%:;, Three advisory groups, the Station Operations Review Committee (SORC) , the Onsite Safety Review §Jroup (SRG) , and the Offsite safety review §Jroup (OSR) , $ljij are responsible for reviewing and evaluating items related to nuclear safety. The overall responsibilities of these groups are provided in Section 13. 4. !ffte Mana§Jer Quality Assessment is invited to all soRc meetings and receives the minutes of the meetings. periodically. (S)He attends the meetings As part of its independent review functions, the GSR: is responsible for selected preplanned, independent audits of plant operations in accordance

  • .:ith Technical Specification requirements.

These audits are generally conducted by QA under esR cognizance. 17.2.1.2 Maplewood Testing Services The Manager Maplewood Testing Services reports to the Director Business and Maintenance Serviees in fossil generation. Maplewood Testin§J Services performs calibrations, analyses, and mraluations on systems, equipment, aad materials, as requested by PSE&G departments, and maintains compliance with its quality assurance program. 17.2.1.3 Deleted HCGS-UFSAR 17.2-7 Revision 8 September 25, 1996

  • *
  • *
  • *
t]:

!§¥J#:P.i§::

  • *
  1. 2#

9:f' t9#*,,sq:gf: ?# Ch._.*.*.* ... :**.*.a: ... *_.* .. 1.*.* .. *.**.r .. ** .. = .. * .. =_,m_.*_.* .. =_.*.* .. :.a_ .. **.w:J:Qt;

  • fjJiij .='.='_,'*.=.=.=.a.**

.. * ... **.** .. _e_.=_.* .. =_.*.s .. * .. = .. * .. =.:.,:t .. ,_.' .. sn.,*.*_:**.*.**.*_.: __ =_.* .. =.a .. *= .. _t _ .. * .. = .. = .. a.,*.*.*.** ... *=.*= .. '.= .::.,ai ..*... **.= ... =.*.*.=.t_ .. ,roiir*' members .*.-.'**.*_,=.,:_ .*. 1.-.'.:_,n= .. ***.* ..... '_c*.*.: .. * .. * .. =.1 ..... *'.= ... _Jl.*_.:._.*.* .. _d_ .. _:.*_.i_: .. **.***'_n_:*_ ..... : .... s*_.* ... _**_** .. . *.*.*.*.*:*:*:*:*:*:*:*:*:*:*:-:-:-:*:*:-:-:*:<*:*:***:-:-*-:-:-:-:-:-:*:*:*:-:-:-:-**:-:-:-:-:-:*:*:*:*:*:-:-:-:*:*:*:*:*:-:-:-:-:*:*:*:-:**-::-:-:-:*:*:*:*:*:*:-:-:*:*:*:*:*:*:-:-:-:-:-:*:*:*:******* fq#< w:n : 2P:2:: :*tq;g F:hw* ff :M % .;9

; ¥ @
if:=i w;::::. *:::::,
  • P:ns+.@!i.#

m*;*:***:J::*: r

pr;

?!!H

mmts1wa *
  • *
  • * *
  • B#

iCf:4fat:t;J#ffe

  • -:

@# .B=f' :ffe::' ,

!!§#,pg!ili,:

§§ e:;m?erience m.ay nave be.en in<r:ela.t:ed.

d;i:s:ciplines. ¥f:%%s#:s#

  • 17.2.1.4 Distribution Systems Department The Vice President

-Electric Distribution Systems reports to the Senior Vice President Transmission and Distribution. The Distribution Systems Department is responsible for providing support to Hope Creek operations for setting and testing protective relays for the external vital power supplies at the station. 17.2.2 Quality Assurance Program The QA program is designed to comply with the requirements of 10CFR50,. Appendix B, and with fire protection program requirements of Branch Technical Position CMEB 9.5-l. This program is applied to items and activities that can affect the health and safety of the public, i.e., Q, F, and R-designated items and activities. During the operational phase, this includes:

1. Structures, systems, and components delineated in Table 3.2-1 and marked as Y in "QA Requirement" column. 2. Safety-related activities delineated in Regulatory Guide 1.33 and summarized in Table 17.2-1, Section A and additional NRC requirements contained in Table 17.2-1, Section B. 3. Portions of structures, systems, and components whose continued function is not required, but whose failure, caused by a safe shutdown earthquake (SSE) , could reduce the functioning of a Seismic Category I structure, system, or component to an unacceptable safety level; or could result in an incapacitating injury to occupants of 17.2-8 HCGS-UFSAR Revision 8 September 25, 1996
  • 4. the control room as shown in Table 17.2-2 and further delineated in Table 3.2-1 . Fire protection systems, including emergency lighting and communications, shown in Table 17.2-3, and further delineated in Table 3.2-1 as well as administrative controls, such as fire brigade trafning, control of combustibles and ignition sources, and firefighting procedures.
5. Radwaste management systems described in Table 17.2-4 and further delineated in Table 3.2-1. The QA program is applied during the operational phase using a graded approach to the extent consistent with the item's or activity's importance to safety. Where there is an inconsistency between tables (i.e., Tables 3.2-1, 17.2-1, 17.2-2, and 17.2-3), the item will have QA provisions applied until the conflict is resolved and tables revised. These activities are performed in compliance with applicable regulatory requirements that include but are not limited to: 1. Regulatory Guide 1.8, Qualification and Training of Personnel for I Nuclear Power Plants 2. Regulatory Guide 1.17, Protection of Nuclear Plants Against Industrial Sabotage 3. Regulatory Guide 1.26, Quality Group Classifications and Standards for water, steam and radioactive waste containing components of Nuclear Power Plants 4. Regulatory Guide 1.29, Seismic Design Classification
5. Regulatory Guide 1. 30, Quality Assurance Requirements for the HCGS-UFSAR Installation, Inspection, and Testing of Instrumentation and Electric Equipment 17.2-9 Revision 4 April 11, 1992
6. Regulatory Guide 1.33, Quality Assurance Program Requirements (Operation)
7. Regulatory Guide 1.37, Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water Cooled Nuclear Power Plants 8. Regulatory Guide 1. 38, Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water Cooled Nuclear Power Plants 9. Regulatory Guide 1.39, Housekeeping Requirements for Water-Cooled Nuclear Power Plants 10. Regulatory Guide 1.52, Design, Testing, and Maintenance Criteria for Atmosphere Cleanup System Air Filtration and Absorption Units of Light Water Cooled Nuclear Power Plants 11. Regulatory Guide 1.54, QA Requirements for Protective Coatings Applied to Water-Cooled Nuclear Power Plants 12. Regulatory Guide 1.58, Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel
13. Regulatory Guide 1.64, Quality Assurance Requirements for the Design of Nuclear Power Plants 14. Regulatory Guide 1.74, Quality Assurance Terms and Definitions
15. Regulatory Guide 1.88, Collection, Storage, and Maintenance of Nuclear Power Plant Quality Assurance Records 16. HCGS-UFSAR Regulatory Guide 1. 94, Quality Assurance Requirements Installation, Inspection, and Testing of Structural 17.2-10 Revision O April 11, 1988 for
  • 17 . Concrete and Structural Steel during the Construction Phase of Nuclear Power Plants Regulatory Guide 1.116, Installation, Inspection, System Quality Assurance Requirements for and Testing of Mechanical Equipment and 18. Regulatory Guide 1.123, Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants 19. Regulatory Guide 1.137, Generators Fuel-Oil Systems for Standby Diesel 20. Regulatory Guide 1.143, Design Guidance for Radioactive Waste Management Systems, Structures, and Components Installed in Light Water Cooled Nuclear Power Plants. 21. Regulatory Guide 1.144, Auditing of Quality Assuran.ce Programs for I Nuclear Power Plants 22. Regulatory Guide 1.146, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants 23. BTP 9.5-1, Appendix A, Guidelines for Fire Protection for Nuclear Plants Docketed Prior to July 1, 1976. Commitments to Regulatory Guides, with respect to revision level, exceptions, etc, are contained in Section 1.8. The code QA requirements are used for the procurement of systems, components and structures covered by the ASME Boiler and Pressure Vessel Code Section III (classes 1, 2, and 3). The standard QA program controls apply to Q-Listed code items following receipt at the station. In addition, applicable requirements of Regulatory Guide 1.38 are applied to ASME Code procurements where necessary to assure safe shipment.

17.2-11 HCGS-UFSAR Revision 8 September 25, 1996

  • Substantive changes to the QA program described herein will be submitted to the NRC within 30 days of implementation.

Nonsubstantive changes will be identified in the annual UFSAR updates . The station General Manager has instituted and will maintain a administrative procedures (SAP) manual. station I Regulatory Guide 1. 33 requires that plant activities a.ffecting quality-related items and services be conducted in accordance with written administrative controls prepared by management. The procedures and instructions by which plant activities are performed are prepared by the responsible organization as required by Nuclear Administrative Procedures Manual, reviewed by the organization responsible for the activity, reviewed as required by QA and SORC, and 17.2-12 HCGS-UFSAR Revision 8 September 25, 1996 approved by the department manager. Nuclear Administrative Procedures (NAPs) and Station APs and all subsequent revisions thereto are reviewed by QA and SORC and are approved by the Station General Manager. Procedures cannot be implemented unless the review/approval process is accomplished. The Nuclear Administrative Procedures Manual provide a means to accommodate on-the-spot changes to subtier implementing procedures. The routine practice for revising a procedure is to repeat the original review and approval sequence. Implementation of the QA program is verified by means of independent inspections, assessments, monitoring, and audits conducted by QA. QA reviews and analyzes problems affecting quality that occur during the operational phase. Items subject to review include: 1. Documented nonconformances occurring at the supplier's facility and those identified during receiving, storage, installation, test, and operation, e.g., Deficiency Reports, Nonconformance Reports, Work Orders, Licensee Event Reports, etc. 2. Documented corrective actions taken on conditions adverse to quality and actions to prevent recurrence on significant conditions adverse to quality. 3. NRC inspection findings, notifications, bulletins, etc. The Director -QA/NsR or his )ph,#,;ff designee§, has-the authority to stop work through the issuance of a Stop Work Order where continuance of an activity would seriously compromise quality or constitute a persistent and deliberate failure to correct a significant condition adverse to quality. Deoigneeo include the Manager Quality Assessment and the Manager Corrective Action and Quality Services for activities under their cognieance. QA reports significant conditions adverse to quality affecting the quality assurance program to respective management along with: 17.2-13 HCGS-UFSAR Revision 8 September 25, 1996

  • 1. Measures taken to improve QA program controls 2. Appropriate recommendations to achieve compliance with applicable requirements.

Management polioy and administrative procedures provide all personnel with awareness and d-irection for reporting of defects and noncompliance pursuant to 10CFR21. The QA program requires that safety-related activities and activities affecting the fire protection of safety-related areas, be accomplished under suitably controlled conditions. The program takes into consideration the need for procedures, special controls, cleanliness, special processes, test equipment, tools, and skills to obtain the required quality and the verification of quality by inspection, test, examination, monitoring, assessments and independent review and audit. These activities include, but are not limited to, designing, purchasing, fabricating, handling, shipping, storing, cleaning, erecting, installing, inspecting, testing, operating, maintaining, reworking, repairing, refueling, and modifying. Personnel who have the responsibility to implement the QA program also have the responsibility and authority to escalate unresolved quality problems to the level of management necessary to effect resolution. Escalation is applied by QA personnel to increasingly higher levels of management, up to the CNO/PNBU, as required. Personnel performing Q,F, and R-designated activities are trained or indoctrinated as necessary to assure that suitable proficiency is achieved and maintained. Personnel outside the QA organization who perform inspections and tests are trained and qualified in QA concepts and practices . 17.2-14 HCGS-UFSAR Revision 8 September 25, 1996

  • Orientation is provided for new employees entering QA from other organizations within PSE&G and from outside the company. An outline of the course content and program objective is contained in the QA training and certification program. The training and certification program is designed to familiarize the employee with: 1. Codes, regulations, specifications, etc, applicable to nuclear and other power generation equipment
2. QA procedures, instructions, specifications, documentation, records, etc 3. Auditing and assessment objectives and techniques
4. Operational Quality Assurance Program 5. Quality Assurance Operational Philosophy
6. Other organizations within PSE&G with which QA interfaces QA administers formal QA training sessions for personnel outside the QA organization who perform safety related activities.

The content of these training programs, dates of the sessions, and names of the attendees and their individual performance evaluations are documented and retained . 17.2-15 HCGS-UFSAR Revision 7 December 29, 1995

  • Personnel requiring certification are evaluated to establish their qualifications for their respective level and discipline.

Recertification is based upon demonstrated continued proficiency or requalification, if necessary. Personnel requiring certification in accordance with Regulatory Guide 1.58 are limited to personnel who perform inspection, test and non-destructive examination (NDE) activities, personnel who perform post design modification testing, and Inservice Inspection Services personnel who perform NDE and tests required by the Inservice Inspection Program. Those above personnel who perform visual examination (VTl, 2, 3) and NDE in accordance with the Inservice Inspection Program are trained, qualified and certified in accordance with a program which additionally meets the prescribed supplementary requirements of ASME Section XI. These personnel receive a periodic training needs assessment to identify additional supportive training needs, as well as, to evaluate individual post-training performance. The assessment period is three years or less. Personnel who are qualified and requalified for their respective level and discipline in accordance with Regulatory Guide 1.8 and ANSI/ANS -3.1 and direct or supervise the conduct of individual preoperational, startup, and operational inspections and tests, including Technical Specification Surveillances and periodic inspection and test of fire protection equipment, do not require certification per Regulatory Guide 1.58 and ANSI N45.2.6 1978. When a single inspection or test requires implementation by a team or group, personnel not meeting the requirements of Regulatory Guide 1.58 and ANSI N45.2.6 1978 may be used in data-taking assignments or in plant or equipment operation provided they are supervised or overseen by an individual participating in the inspection, examination, or test and the individual is qualified and requalified for their respective level and discipline in accordance with either Regulatory Guide 1.8 and ANSI/ANS -3.1 or the individual is certified in accordance with Regulatory Guide 1.58 and ANSI N45.2.6 1978 as appropriate. Regulatory Guide 1.58 and ANSI N45.2.6 1978 do not apply to NRC -Licensed Operators and Senior Operators for the performance of duties specified in 10CFR55 "Operator Licenses". The Nuclear Training Center is responsible for the licensed operator training and retraining, in addition to other technical and supervisory training programs . 17.2-16 HCGS-UFSAR Revision 8 September 25, 1996

  • General Employee Training, which is required for all personnel having access to the station, is the responsibility of the Manager °!'ruelear seeurity
" wgg §f. Training programs of supporting organizations are described in their manuals, which are required to comply with the QA program. 17.2.3 Design Control The scope of the design control program includes design activities associated with the preparation and review of design documents, including the correct translation of applicable regulatory requirements into design modification, procurement, and procedural documents.

The design control program includes activities such as field design engineering, computer programs, compatibility of materials, and accessibility for inservice inspection, maintenance, and repair. Issuance of new drawings and revisions to existing drawings require the implementation of a design change. The term design change as used throughout this document, shall apply to both design and configuration changes. The Nuclear Engineering Manual (NEM) procedures, provide implementation guidance for the intent of Regulatory Guide 1.64, "Quality Assurance Requirements for the Design of Nuclear Power Plants." QA will conduct periodic engineering process assessments which include procedures contained in the The Nuclear Engineering Department has the following responsibilities:

1. Prepare and update detailed engineering and design documents, including drawings and specifications, for all systems, components, and structures.
2. Specify applicable codes, standards, regulatory and quality requirements acceptance standards, and other design input in design documents.
3. Identify systems, components, and structures that are covered by the quality assurance program. 4. Perform design verification for systems, components, and structures covered by the QA Program . 17.2-17 HCGS-UFSAR Revision 8 September 25, 1996
  • * -"' . -*cz . **-,,. 5. Perform safety evaluations of proposed design changes, as required.

Sa . Apply Generic lOCFR 50.59 Safety Evaluation, as required, configuration changes that impact the SAR. 6. Prepare documents for procurement of equipment, materials, and components.

7. Recommend engineering consultants and laboratories for procurement services and coordinate their activities.
8. Review design documents submitted by suppliers (including the Nuclear Steam Supply System (NSSS) supplier) and contractors.
9. Specify, or approve as required, inspections and/or tests 10. Designate whether they will seek the service of other qualified engineering organizations.

The cognizant engineer is responsible for the identification and completion of design analyses. The purpose of design analysis is to assure that the technical design is accomplished in a planned, controlled, and correct manner. Types of design analyses include, but are not limited to, reactor physics, stress, seismic, thermal, hydraulic, radiation, and accident. Design verification is performed on design analyses, drawings, specifications, and other design documents, as applicable. It is the process of reviewing, confirming, or substantiating the adequacy of design by one or more methods. Design verification is performed on changes to previously verified designs, including evaluation of the effects of those changes on the overall design. In general, design verification is completed prior to installation and in all cases is completed prior to placing the modified system or component into service. Design verification is performed by competent individuals or groups other than those who performed the original design with the following exception: a design verifier may be the design originator's supervisor, provided that he did not specify a singular design approach or 17.2-18 HCGS-UFSAR Revision 8 September 25, 1996

  • rule out certain design considerations and did not establish the design inputs used in the design, or if the supervisor is the only individual competent to perform the verification.

This design verification provision is individually documented and approved in advance by the supervisor's management. Procedural control is established for design documents that reflect the commitments of the UFSAR; this control differentiates between documents that receive formal design verification by interdisciplinary or multi-organizational teams and those which can be reviewed by a single individual (a signature and date is acceptable documentation for personnel certification) Design documents subject to procedural control include, but are not limited to, specifications, calculations, computer programs, system descriptions, and drawings including flow diagrams, electrical single line diagrams, structural systems for major facilities, site arrangements, and equipment locations. Specialized reviews should be used when uniqueness or special design considerations warrant. The responsibilities of the verifier, the areas and features to be verified, the pertinent considerations to be verified, and the extent of documentation are identified in procedures. Control of this function is assured through periodic QA/NSR audits and assessments. Design verification methods comply with applicable requirements of ANSI N45.2.11 and may include, but are not limited to: 1. Design reviews 2. Alternate or independent calculations

3. Qualification testing. In the event that the verification method for design modifications is only by test, procedures and instructions will be written which include measures to ensure that: 17.2-19 HCGS-UFSAR Revision 8 September 25, 1996
  • 1. Criteria are provided to specify when verification should be by test . 2. Where applicable, prototype, component or feature testing will be performed prior to installation of plant equipment.

In those cases where this cannot be met, the testing will be deferred but not beyond the point when the installation would be irreversible.

3. Tests will be performed under conditions that simulate the most adverse design conditions, as determined by analysis.

Drawings are prepared by, or under the supervision of a designer from information received from the responsible engineer, manufacturer's drawings, etc. The drawings are reviewed and initialed as being checked by another designer or design supervisor. The drawings are approved by the functional supervisor or his designee. Specifications and changes thereto for items covered by the QA program are prepared by Nuclear Engineering and are reviewed by Supplier Assessment for QA content. QA review assures that the documents are prepared, reviewed, and approved in accordance with company procedures and that the documents contain the necessary QA requirements such as inspection and test requirements, acceptance requirements, and the extent of documenting inspection and test results . The Station Operations Review Committee (SORC) reviews proposed changes affecting nuclear safety and makes recommendations concerning implementation of the change to the station general manager. The design change process provides for sign-off of the design change by the appropriate department head for the purpose of identifying required procedure change. If the proposed modification involves a Technical Specification change, or is considered by the SORC to involve an unreviewed safety question (10CFR50.59), the 17.2-20 HCGS-UFSAR Revision 8 September 25, 1996 matter is submitted to the Offoite Safety Review Group (OSR) for a determination of its safety implication before a license change request is submitted for NRC approval. For Huelear Engineering prepared PBK¥:i'.S

§p:g ::t#\#.fi),g#,'%t:$§H

\§# design changes, Nuclear Engineering assigns a project team led by a project manager) The project team consists of members of various organizations, both internal and external to Nuclear Engineering. The project team members are responsible for providing technical and administrative input to the entire design change process, which consists of design, installation, testing, and closeout phases. The technical and administrative input is guided by the requirements of those organizations which comprise the project team. The project manager ensures that the specific requirements of each organization on the project team are considered to ensure the overall quality of the product. For design changes important to safety, the QA representative on the project team provides input and assures that design changes include quality assurance requirements such as inspection and test requirements, acceptance requirements, test result documentation, and project team compliance with company procedures during preparation, review, and approval of design changes. Updating of records, including drawings, blueprints, instructions and technical manuals, and specifications resulting from design changes, is the responsibility of the Senior Vice President -Nuclear Engineering. Design change procedures provide for the timely update of affected drawings following design change implementation to reflect as-built configuration. 17.2.4 Procurement Document Control Procurement documents and changes thereto for the purchase of Q, F, and designated material, equipment, or services are reviewed and approved by QA prior to issuance by the Purchasing Department to the prospective supplier. QA review assures that spare and replacement parts are procured using controls which are commensurate with current QA program requirements. 17.2-21 HCGS-UFSAR Revision 8 September 25, 1996

  • The review also assures that procurement documents adequately and correctly:
1. Identify applicable QA program requirements
2. Reference applicable regulatory requirements, codes, and standards
3. Provide right of access for source surveillance and audit by QA or its agents 4. Provide for required supplier documentation to be submitted to PSE&G or maintained by the supplier, as appropriate
5. Provide for PSE&G review and approval of critical procedures prior to fabrication, as appropriate.

Procurement documents require suppliers and contractors of other than commercial grade items to provide services or components in accordance with a QA program that complies with applicable parts of 10CFR50, Appendix B. The requirement for notifying PSE&G of procurement requirements that have not been met is conveyed to the supplier through the standard warranty provisi.on contained in each purchase order. In addition, where 10CFR21 is imposed, suppliers are required to comply with applicable reporting requirements. 17.2.5 Instructions, Procedures, and Drawings Organizations engaged in Q, F, and R-designated activities are required to perform these activities in accordance with written and approved procedures, instructions, or drawings, as appropriate. Simple routine activities that can be performed by qualified personnel with normal skills do not require a detailed written procedure. Complex activities require detailed procedures. detailed procedures is HCGS-UFSAR The designation of those activities requiring 17.2-22 Revision 8 September 25, 1996

  • made by cognizant department heads and as a minimum, complies with applicable requirements of Regulatory Guide 1.33. Procedures include, as appropriate, scope, statement of applicability, references, prerequisites, precautions, limitations, and checkoff lists of inspection requirements, in addition to the detailed steps required to accomplish the activity.

Instructions, procedures, and drawings also contain acceptance criteria where appropriate. The station General Manager is responsible for assuring that station procedures are prepared, approved, and implemented in compliance with the Nuclear Administrative Procedures Manual. Documents affecting nuclear safety are reviewed by the SORC for technical content, by QA for QA requirements, and are approved by the responsible station department manager or his designee. The Senior Vice President is responsible for issuing specifications, drawings, blueprints, procedures, administrative and technical manuals associated with Q, F, and designated structures, systems, and components. Approved and implemented modifications and design changes are incorporated in these reference documents for the life of the station. Master lists of current editions or revisions of these documents are maintained by Nuclear En9ineering to assure that only current and approved referenced documents are used. QA reviews and approves selected station procedures that implement the QA program, including testing, calibration, maintenance, modification, rework, and repair. Changes to these documents are also reviewed and approved. In addition, QA is responsible for review and approval of selected specifications, test procedures, and results of testing . 17.2-23 HCGS-UFSAR Revision 8 September 25, 1996

  • 17.2.6 Document Control Instructions, procedures, drawings, and changes thereto are reviewed for the inclusion of appropriate QA requirements approved by appropriate levels of management of the PSE&G organizations producing such documents, and distributed on a timely basis to using locations.

Measures are provided for the timely removal of obsolete or superseded documents from the using location. Supplier documents are controlled according to contractual agreements with suppliers. The following is a generic listing of key documents for the operational phase, showing minimum organization responsibility for review and/or approval, including changes thereto: 1. Design specification -Nuclear Engineering, QA. 2. Design modification, manufacturing, construction, and installation drawings Nuclear Engineering, Nuclear Operations Services, station operations

3. Procurement documents initiating Nuclear Business Unit organization, PHroaasin§" Department, Nuclear Operations Services, QA 4. Nuclear Administrative Procedures Manual -Nuclear Business Unit organizations responsible for implementation, QA 5. Nuclear Business Unit second tier manuals, including station administrative procedures

-cognizant department head, QA 6. Maintenance, modification, and calibration procedures for Q, F, and R designated station work activities - Station eperatiene

7. Operating procedures

-station operations HCGS-UFSAR 17.2-24 Revision 8 September 25, 1996

8. UFSAR -Nuelear Operations Berviees and 9. 10. 11. other Nuclear Business Unit organizations responsible for implementing applicable sections.

In addition, QA reviews subsequent changes to UFSAR sections to the extent necessary for assuring compliance with applicable QA program requirements Maintenance, inspection, and testing instruction -Nuclear Business I Unit implementing organizations Post modification test procedures -Nuclear Engineering Design Change Requests -Nuclear Engineering, QA QA involvement in the work activity includes review of work procedures prior to approval for designation of inspection hold points (see Section 17.2.10), review of completed safety-related Work Orders on a sampling basis, and periodic QA surveillance and assessments. The establishment and maintenance of a document control system for all instructions, procedures, specifications, and drawings received from the Nuclear Business Unit, or prepared at the station for use in operating, maintaining, refueling, or modifying items and services covered by the QA program, is the responsibility of the Senior Vice President Nuclear Engineering. The Nuclear Administrative Procedures Manual describes the controls for specific documents. Control of station practices is included in the administrative procedures and in department directives authorized by the responsible station department managers. Measures are established to assure that the administrative procedures and department directives are up to date, properly authorized, changed only after the required review and approvals are obtained, and distributed to appropriate personnel. Design change procedures provide for the timely update of affected drawings, following design change implementation, to reflect as-built configuration. Computerized databases maintained by the NEU organization are used to control drawings and specifications. 17.2-25 HCGS-UFSAR Revision 8 September 25, 1996

  • Revision control of procedures and instructions is accomplished through the control of computerized databases.

Controls of software affecting nuclear safety are identified in the Nuclear Administrative Procedures Manual. These controls are based on applicable guidelines provided by the NRC and include software review and approval as well as access controls to prevent unauthorized software changes. 1 7 . 2 . 7 Control of Purchased Material, Equipment, and Ser'vices QA maintains an up-to-date listing of approved suppliers of material, equipment, and services covered by the QA program. This list identifies suppliers and contractors who have demonstrated the ability to supply acceptable material, equipment, or services. The list includes manufacturers of commercial grade items. All QA program procurements are made from approved suppliers. The responsible engineer and QA personnel select and evaluate prospective bidders and suppliers. The responsible engineer determines the technical competence of the supplier, while QA evaluates the prospective supplier's QA program for the capability of meeting applicable requirements of lOCFRSO, Appendix B, and for extending applicable program requirements to subtier suppliers. Qualified QA personnel evaluate the prospective supplier's QA capability using one or more techniques, including but not necessarily limited to: 1. Evaluation of supplier's or contractor's procedures or manuals and changes thereto 2. ASME code stamp approval 3. Nuclear Utility Procurement Issues Council (NUPIC) or Nuclear Fuel Users Forum (NFUF) Audits. 4. Satisfactory past history of providing similar items 17.2-26 HCGS-UFSAR Revision 8 September 25, 1996

  • * --
5. Survey of supplier's facility The evaluations checklist form of the prospective suppliers designed to include the 18 Appendix B, as appropriate.

are conducted using quality criteria of standard 10CFR50, Surveys of suppliers' capabilities include evaluation of management systems, manufacturing processes and adherence to QA/QV procedures. The results of supplier evaluations are documented by the appropriate checklist form and filed. Supplier control is maintained through a planned inspection, monitoring, and audit program by QA'. QA and the responsible engineer conduct a review of the manufacturing process for complex manufactured items, such as pumps, valves, heat exchangers, vessels, electrical panels, etc. This review establishes critical inspection points and establishes a notification point program for the identified inspection or surveillance activities. The established inspection or surveillance activities are implemented by qualified QA personnel or QA agents. Commercial Grade Items are dedicated in accordance with recognized industry standards, e.g. EPRI NP 5652. Monitoring of suppliers/contractors during fabrication, installation, modification, rework, repair, inspection, testing, and shipment of Q, F, and designated materials, equipment, and services, is conducted by qualified QA personnel or QA agents at the supplier' sf contractor's facility or at the generating station. Surveillances are conducted in accordance with written procedures and are designed to assure conformance with procurement requirements, in accordance with the safety significance of the item or service . 17.2-27 HCGS-UFSAR Revision B September 25, 1996

  • Periodic evaluations of the supplier/contractor quality program are conducted, consistent with the importance or complexity of the item or service. Dependent upon the evaluation, additional audits or corrections by the supplier/contractor may be required.

Supplier's certificates of conformance are periodically evaluated by audit, inspection, or test to assure that they are valid. Results of these audits, inspections, or tests are documented. Where feasible, replacement parts adhere to the original design criteria (such as Nuclear Steam Supply System (NSSS) components in accordance with NSSS documentation and other code components in accordance with AWWA, AISC, SPCC, and ASME B&PV Code, Section III, 1971 and Summer 1972 Addenda or later) . This provides the intended level of safety, and does not result in redesign of the system. The requirement for appropriate supplier documentation of conformance to applicable code, standard, specification, or other quality requirements is provided by the procurement document. The supplier-provided documentation is reviewed either at the supplier's facility during source surveillance or by Material Compliance Group during material evaluation activities. A data review checkoff is used to document the acceptability of the supplier-provided data and to identify discrepancies. Evaluation of supplier equipment, material, and services is conducted by qualified personnel to verify correct identification, appropriate documentation, and to verify that the item is acceptable and can be released for storage, installation, or use. Nonconforming items identified by the Material Compliance Group are tagged or segregated to prevent inadvertent use. described in Section 17.2.15. Nonconforming items are controlled as 17.2.8 Identification and Control of Materials, Parts, and Components Procurement document controls provide assurance that materials, parts, and components received can be properly identified. The 17.2-28 HCGS-UFSAR Revision 8 September 25, 1996

  • *
  • identification is directly marked on the item, or on records traceable to the item. The data review conducted at receiving assures that proper documentation of received items is available.

Materials and items received without proper identification are tagged or segregated until satisfactory documentation and identification is obtained. Procedures requfre Q, F, and R-designated materials, parts, and components to be marked or otherwise identified, and require that such identity be maintained either on the item or on records traceable to it throughout receipt, storage, installation, and use. Protection against use of incorrect or defective items is also provided. Material identification and traceability is maintained for rework, repairs, and modifications throughout operation. Organi2mtions whieh iH1pleH1ent requireffients for the identifieation and eontrol of Hlaterials, parts, and eoH1ponents inelude Nuelear Operations Serviees, Nuelear Engineering, station operations and QA for proeureff\ent doeuffient eontrols, and Proeureff\ent and Materials Hanagefftent, station operations aad QA for reeeipt, storage, installation, inspeetion and test aetivities. . e#mm?r§::;::.

:

1#Ma 17.2.9 Control of Special Processes Special process controls provide for the use of qualified procedures, equipment, personnel, and documentation of satisfactory completion of an activity. Special processes are generally those processes where direct inspection is impossible or disadvantageous. Procedures have been established for special processes such as welding, brazing, soldering, concreting, protective coating, cleaning, heat treating, and nondestructive examination (NDE) to assure compliance with codes and design specifications. The Senior Vice President -Nuclear Engineering is 17.2-29 HCGS-UFSAR Revision 8 September 25, 29*95 responsible for preparing special process procedures such as concreting, protective coating and cleaning, while the Director Huclear Operations Services is responsible for preparing specifications for processes such as welding, brazing, soldering, and heat treating and . Nuclear Engineering is responsible for preparing specifications for non-destructive examination (NDE) . These specifications are reviewed and approved by QA_ for necessary quality content. QA monitoring assessments and audits assure that qualification of special processes, equipment and personnel have been satisfactorily performed. Procedures for implementing the requirements of the specifications are prepared either by the Nuclear Business Unit or by supplier personnel, and are reviewed by QA and the appropriate general manager or their designees, with the exception of special process procedures prepared by code suppliers holding a valid certificate of authorization. Qualification records of procedures, equipment, and personnel associated with special processes arc retained as stated in Section 17.2.17. 17.2.lO Inspection A planned inspection program is conducted and documented by personnel appropriately qualified in accordance with Section l 7. 2. 2. The inspection program verifies conformance to the established procedure, code, or standard, consistent with the item's or activity's importance to safety. The inspection program for maintenance and modification activities is based upon the following three important levels of inspection:

l. HCGS-UFSAR Worker Checks Quality cannot be achieved unless the worker performs the activity in a quality manner. The worker is the individual best able to control the quality of work performed.

Work steps that contain 17.2-30 Revision 8 September 25, 1996

  • *
  • 2. elements impacting plant equipment or systems have provisions for signoff by the worker. This worker sign-off establishes accountability for the activity and is acknowledgement that the activity has been performed as specified in the work step. Supervisory Inspection

-Although the work supervisor may have overall responsibility for the conduct and performance of the work activity, certain conditions at the work location require supervisory inspection to increase confidence that work activities are completed as specified through familiarity of the work activity, work group, or past experience. Supervisory inspections are established in the appropriate work procedure and accomplished through direct observation of the work activity.

3. Independent Inspection

-Independent inspections are not intended to dilute or replace the responsibility of the worker check or supervisory inspection for quality of work. Independent inspections provide the maximum confidence attainable that the work activity has been performed in accordance with the overall objective. Typical guidelines for establishing independent inspections include conditions similar to the following: HCGS-UFSAR Work activity affecting redundant equipment or potentially causing cascading failure. Retest will not verify the applicable attribute. Establishing a baseline in a new process or procedure. It is deemed necessary to maintain confidence in the work process . 17.2-30a Revision 4 April 11, 1992

  • *
  • This guidance is considered by the responsible QA organization in the establishment of inspection activities . Independent inspections are identified as Inspection Hold Points (IHPs) in the applicable work instructions and are performed by individuals independent of the work activity.

IHPs cannot be passed without authorization from the applicable management representative responsible for the inspection activity. General guidelines for the inspection criteria are established by QA and incorporated into various administrative and work instructions. Independent inspections are performed by QA or other individuals who are independent of the work activities. If the individuals performing inspections are not part of the QA organization, the inspection procedures, personnel qualification criteria, and independence from undue pressure, such as cost and schedule, are reviewed for acceptability by the QA organization prior to initiation of the activity. Work procedures and inspection instructions include, as required, characteristics to be inspected, method of inspection, acceptance/rejection criteria, required measuring and test equipment, and required reference documents. Documentation includes inspection identification and results of inspection performance . As a result of its review, the Station Operations Review Committee (SORC) may recommend additional or different hold points to the organization performing the work activity. Periodic inspection, other than IHPs, is performed by qualified individuals other than those who performed or directly supervised the activity being inspected. These typically include periodic inspections of the following: 17.2-30b HCGS-UFSAR Revision 4 April 11, 1992

  • 1. Storage areas 2. Housekeeping (general)
3. Fire protection equipment
4. Special handling tools and equipment
5. NDE visual inspection required by the inservice inspection program. An independent organization shall perform NDE as required, using qualified individuals other than those who performed or directly supervised the activity.

When inspections are performed by individuals other than those who performed or directly supervised the work, but who belong to the same work group, and the activity involves breaching a pressure-retaining boundary, the quality of the work is demonstrated through appropriate testing, unless restrictions such as ALARA considerations prevent such testing. The applicable inspection and retest requirements necessary to assure that modifications, rework, or repairs have been accomplished correctly are included in the design change package, work order, or procedure. The inspection and retest requirements for modification, rework, and repair are based on the original inspection and test program, as well as the nature and scope of the modification or repair activity. Evaluation and review of inspection results are conducted by personnel certified Level II in ANSI/ASME N45.2.6 and SNT-TC-lA, as applicable. A planned and documented QA monitoring program is conducted by QA for Quality Program activities, including the inspection program and personnel qualifications. Monitoring of the 17.2-31 HCGS-UFSAR Revision 8 September 25, 1996

  • implementation of the QA program by station and site contractor personnel is conducted by QA, in addition to offsite supplier activities as appropriate.

Conditions adverse to quality found during the conduct of monitoring are brought to the attention of the management responsible for the activity. The Manager -Quality Assessment, or designee, routinely attends and participates in plant work schedule and status meetings to assure that they are kept abreast of day-to-day work assignments throughout the plant and that there is adequate QA coverage relative to procedural and inspection controls, acceptance criteria, and QA staffing and qualification of personnel to carry out QA assignments. 17.2-32 HCGS-UFSAR Revision 8 September 25, 1996

  • *
  • HCGS-UFSAR THE INFORMATION ON THIS PAGE HAS BEEN DELETED . 17.2-33 ----*-.,;*--sy 1?or*1r,.-*

'* Revision 4 April 11, 1992 ........ --* ... '

  • *
  • HCGS-UFSAR THE INFORMATION ON THIS PAGE HAS BEEN DELETED . 17.2-34 Revision 4 April 11, 1992
  • 17.2.11 Test Control Q, F, and R-designated equipment and components that must be tested periodically to assure satisfactory performance, or have been replaced, modified, or repaired, are tested by qualified personnel in accordance with written procedures that provide acceptance criteria based on requirements contained in applicable design and procurement aocuments.

Provisions are implemented that assure that nonconformances are corrected or resolved prior to the initiation of the preoperational test program on the item. Retest requirements are provided by engineering specifications or the responsible engineer, or both as were the original test requirements. The Nuclear and operations departments are responsible for preparation of test procedures incorporating the engineering parameters. Test procedures prescribe, as applicable:

1. 2. 3. 4. 5. 6 . HCGS-UFSAR Prerequisites, including completeness of test item(s) Instructions for performing the test Instrumentation and equipment for conduct of the test adequate to the test objective Suitable environmental conditions and adequate test methods Critical test sequence Acceptance criteria.

17.2-35 Revision 8 September 25, 1996

  • Test results, including verification of above items, are documented and reviewed for acceptability by the qualified department representative.

Syoteffl tests perferffled fellewiH§J ffledifieatiefis te Q, F, aHd R desigHated systems require review of toot proeedureo afid toot results by tJ::i.e SORG. The Nuclear Administrative Procedures Manual provides for the use of temporary changes which are controlled in accordance with Technical Specifications. Detailed instructions for implementation of temporary changes are provided. QA performs assessments of selected post modification tests to assure compliance with the test procedure. Test results are reviewed for the following:

1. Presentation of proper documentation
2. Assurance that tests meet objectives
3. Identification and reporting of unacceptable results and initiation of corrective measures.

17.2.12 Control of Measuring and Test Equipment Test equipment, instrumentation, and controls used to monitor and measure activities affecting quality and personnel safety are identified, controlled, and calibrated at specific intervals by cognizant Nuclear Business Unit personnel. Written procedures for meeting these requirements include provisions for: 1. 2 . HCGS-UFSAR Specifying calibration frequency Recording and maintaining calibration records 17.2-36 Revision 8 September 25, 1996

  • *
  • 3. Controlling and calibrating primary and secondary standards
4. Determining methods of calibration
5. Tracing use on safety-related items. Measuring and test equipment (M&TE) calibration procedures are prepared in accordance with the applicable supplier's manual requirements, unless specific exemption is approved by the cognizant station department head. M&TE, which is so exempted, is identified by use of a label or tag on the item. Prior use of measuring and test equipment found to be out of calibration is evaluated for possible effect on safety-related items. Measurements are repeated where necessary.

Secondary standards are calibrated by certified calibration laboratories and are traceable to the National Institute of Standards and Technology (NIST) , or best industry standards where no NIST standards exist. Implementing procedures will provide for documenting the basis of calibrations which are not traceable to NIST. To the extent permitted by the state-of-the-art, the accuracy of the primary standards used to perform this calibration are at least four times greater than the accuracy of the device being calibrated. The basis of acceptance is documented and authorized, with responsibility assigned to the cognizant department head . Test equipment is marked or otherwise identified to indicate a unique identification number, HCGS-UFSAR the latest calibration date and the 17.2-37 Revision 8 September 25, 1996

  • *
  • next required calibration date. Measuring and test equipment is identified by affixing a calibration label unless the size of the item makes this impractical . Out of calibration identification is used for instruments and controls to indicate this status pending calibration, repair, or replacement.

Calibration frequency is based on the manufacturers recommendations. This frequency is adjusted when experience supports this action. Organizations responsible for implementing measuring and test equipment calibration controls include station, Nuclear t1\'@!#.:!@!iriaride Operatien:s Services, and Maplewood Testing Services. 17.2.13 Handling, Storage, and Shipping The control of handling, storage, cleaning, and preservation of material and equipment covered by the QA program is specified, implemented and accomplished by suitably trained personnel in accordance with predetermined work and inspection instructions. Implementing procedures provide for the storage of chemicals, reagents (including control of shelf life), lubricants, and other consumable materials as required. The nuclear materials management group is responsible for control of material in storage, including preservation and shipping controls. The station departments are responsible for system cleanliness and handling of equipment during operational maintenance or modification. Nuclear Engineering is responsible for specifying equipment requirements. Manufacturer's instructions and recommendations, design requirements, and applicable codes and standards are implemented, as appropriate. Compliance with specific handling, storage, or shipping requirements is required. Requirements for new components and spares, where applicable, are included in the procurement documents . 17.2-38 HCGS-UFSAR Revision 8 September 25, 1996

  • ---------------

17.2.14 Inspection, Test, and Operating Status Nuclear Business Unit procedures are required to specify the periodic tests and inspections required for equipment covered by the QA program, and to include the necessary management controls to assure that such required tests and/or inspections are completed in accordance with specified requirements. Equipment awaiting repairs, under repair, or repaired, and received materials are marked to indicate the status of inspection and test requirements and/or acceptability for use. Procedures provide for tagging valves and switches to prevent inadvertent operation. These procedures control the application and removal of tags and are designed to prevent operation of valves and/or switches that could result in personnel hazard or equipment damage. Valve and equipment status boards or logs are maintained to indicate status. 17.2.15 Nonconforming Materials, Parts, or Components Organizations involved in material receipt, installation, test, design modification and other operating activities are responsible for identifying, and documenting nonconformances. Nonconforming materials, where practical, are segregated to prevent installation or use until proper approvals are obtained. Materials, parts, or components that have failed in service are identified and, where practical, segregated. Procedures control the application and removal of tags. Documentation of the nonconformance includes a description of the nonconformance, review by SNSS for Limiting condition for Operation (LCO) applicability when appropriate and the disposition and inspection or retest requirements, as appropriate. The responsible Engineer dispositions each nonconformance report. Dispositions for repair or "use-as-is" are required to be reviewed and approved by QA prior to implementation. Rework or repair of nonconforming material, parts, 17.2-39 HCGS-UFSAR Revision 8 September 25, 1996

  • or components is inspected or retested or both in accordance with specified test and inspection requirements established by the responsible engineering representative, based on applicable requirements.

QA shall verify the satisfactory completion of the disposition of nonconformances. QA and other organizations in the Nuclear Business Unit review nonconformance reports for quality problems, including adverse quality trends, and initiate reports to higher management, identifying significant quality problems with recommendations for appropriate action. 17.2.16 Corrective Action Organizations involved in activities covered by the QA program are required to implement corrective action for significant conditions adverse to quality (SCAQ) and conditions adverse to quality identified within their scope of activity. such conditions are documented and controlled by issuance of an action request. The QA Corrective Action Group reviews responses to action requests for adequacy and monitors these action requests through periodic summary and status reports to management. Responses to action requests are based on the four elements of corrective action, which are: 1. Identification of cause of deficiency

2. Action to correct deficiency and results achieved to date 3. Action taken or to be taken to prevent recurrence
4. Date when full compliance was or will be achieved.

For significant conditions adverse to quality, such as LERs and NRC/INPO/CMAP findings, the QA Corrective Action Group is involved in the review of such conditions and provides oversight to assure timely 17.2-40 HCGS-UFSAR Revision 8 September 25, 1996

  • follow-up and close out. Items 3 and 4 are optional for conditions adverse to quality . Proper implementation of corrective action is verified through surveillance, inspection, assessment or audit, as appropriate.

The station general manager SF!Hilf##,2&9#: is responsible for assuring that conditions adverse to quality are promptly identified and corrected for all activities involving station operation, maintenance, testing, refueling, and modification. Administrative procedures that govern station activities covered by the QA program provide for the timely discovery and correction of nonconformances. This includes receipt of defective material, failure or malfunction of equipment, deficiencies or deviations of equipment from design performance, and deviations from procedures. In cases of significant conditions adverse to quality, the cause of the condition is determined, and measures are established to preclude recurrence. Such events, together with corrective action taken, are documented and reported as described in Section 17.2.15. Corrective action is initiated by the responsible department head. QA closely monitors station conditions requiring corrective action. Repetitive deficiencies, procedure or process violations at the station that are not classified as operational incidents or reportable occurrences, or nonconformances under the QA program, are documented via the issuance of an action request. This request provides a formal administrative vehicle to alert management of conditions adverse to quality that require corrective action . 17.2-41 HCGS-UFSAR Revision 8 September 25, 1996

  • 17.2.17 Quality Assurance Records Records necessary to demonstrate that activities important to quality have been performed in accordance with applicable requirements are identified and maintained in accordance with Regulatory Guide 1.88, as noted in Section 17.2.2. Records shall be considered valid only when authenticated by authorized personnel.

Record types as a minimum, comply with applicable technical specification requirements and include operating logs, maintenance and modification procedures and related inspection results and reportable occurrences. The Nuclear Business Unit is responsible for the permanent storage of station records. The retention period for records; permanent storage location; and methods of control, identification, and retrieval are specified by administrative procedure. Individual station department heads are responsible for submitting applicable department records to the designated location for retention. 17.2.18 Audits Audits of PSE&G and supplier organizations that implement the QA program are performed by QA to verify compliance with the applicable portions of the program, through personnel interview, observation of activities in process, and review of applicable documents and records as required. Performance based assessment should be an integral part of the auditing program and should evaluate activities on the basis of their effect on the safe and reliable operation of the facility. An annual audit schedule is developed to identify the audits to be performed and their frequency. A dominant factor in audit schedule development is performance in the subject area. Audit schedules are revised so that weak or declining areas receive increased audit coverage and strong areas receive less, consistent with the audit schedule frequency requirements of the Code of Federal Regulations and the UFSAR. Audits of the selected aspects of operational phase activities are performed with a frequency commensurate with safety significance and in a manner to assure that at least biennial (2 years) audits of safety related activities are performed. A list of operational phase activities subject to the audit program is provided in the Technical Specifications and in Table 17.2-1. Audits are conducted by audit teams comprised of a certified lead auditor and certified auditors, and technical specialists (when deemed necessary) . 17.2-42 HCGS-UFSAR Revision 8 September 25, 1996

  • Audits are conducted using preestablished written procedures and checklists.

Areas of deficiency revealed by audits are reviewed with management and are corrected in a timely manner. Required corrective action is documented and verified. Followup action, including reaudit of deficient areas, is performed. The audit program conducted by QA includes, but is not limited to, the following activities covered by the QA program: 1. Operation, maintenance, and modification

2. Preparation, review, approval, and control of design, specifications, procurement and requisition documents, instructions, procedures, and drawings 3. Inspection programs 4. Indoctrination and training 5. Implementation of operating and test procedures
6. Calibration of measuring and test equipment
7. Fire protection
8. Other applicable activities delineated in Table 17.2-1. The audit data is analyzed and a written report of the results of each audit is distributed to appropriate management representatives of the organization(s) audited, as well as other affected management personnel.

Included in the report is a statement of QA program effectiveness. QA is audited by independent auditors at least every two years to verify implementation of the corporate QA program. Reports of these audits are directed to appropriate PSE&G management personnel. 17.2-43 HCGS-UFSAR Revision 8 September 25, 1996

  • TABLE 17.2-1 HOPE CREEK Q ACTIVITIES/SERVICES The listing below identifies those activities and services, to which the Operational QA program applies during operations:

A. Safety-related activities delineated in Regulatory Guide 1. 33, Appendix A (See Regulatory Guide for further guidance on these activities) HCGS-UFSAR

1. The procedures that define safety-related processes and programs, and that provide for the control of nuclear operations, and that incorporate regulatory requirements and commitments, will be called administrative procedures.

Refer to Section 13.5.1. The following is a partial list of related administrative procedures: (a) Security Program, (Regulatory Guide 1.77) (b) Equipment Control, e.g., locking and tagging (c) Shift and Relief Turnover (d) . Bypass of Safety Functions and Jumper Control (e) Maintenance of Minimum Shift Complement and Call-In of Personnel (f) Fire Protection Program (FPP) including Inspection by Fire Consultants (g) Communication System.

2. The general plant operating Procedures at Hope Creek will be called Integrated Operating Procedures (IOPs) . Refer to Section 13.5.2.1.2.
3. The procedures for startup, operation and shutdown of safety related BWR systems at Hope Creek will be called System Operating Procedures (SOPs) . Safety related BWR systems for Hope Creek are designated as QA required in Table 3. 2-1. Refer to Section 13.5.2.1.1.
4. The procedures for offnormal or alarm Conditions of safety related BWR systems at Hope Creek will be called alarm response procedures.

Safety related BWR systems for Hope Creek are designated as QA required in Table 3.2-1. Refer to Section 13.5.2.1.4. 1 of 3 Revision 8 September 25, 1996

  • TABLE 17.2-1 (Cont) 5 . The procedures for combating emergencies and other significant events, at HCGS will be broken down into two categories:

Emergency Operating Procedures (EOPs) and Abnormal Operating Procedures (AOPs). Refer to Section 13.5.2.1.3.

6. The procedures for the control of radioactivity will be broken down into several types to facilitate their use by the appropriate personnel.

Structures, systems, and components that control the discharge of solid, liquid, or gaseous radioactive waste to the environment are designated as Quality Group R in Table 3. 2 -1. Refer to Section 13. 5. 2. 2. The following is a representative list of procedures and systems related to the control of radioactivity: HCGS-UFSAR (a) Liquid Radioactive Waste System (b) Solid Waste System (c) BWR Gaseous Effluent System (d) Radiation Protection, including Occupational Radiation Exposure per Regulatory Guide 8.8 (e) Area Radiation Monitoring System Operation (f) Process Radiation Monitoring System Operation (g) Meteorological Monitoring and Data Collection Program (h) Packaging and Transport of Radioactive Material per 10CFR71 (i) Decontamination.

7. The procedures for performing Technical Specification required surveillances will be broken down into several types to facilitate their use by the appropriate personnel.

Section 13.5.2. Refer to 8. The procedures for performing maintenance on safety related BWR systems at Hope Creek will be called maintenance procedures. Safety related BWR systems for Hope Creek are designated as QA required in Table 3.2-1. Refer to Section 13.5.2.2.5.

9. The procedures for chemical and radiochemical analysis, sample collection, maintenance of coolant quality, and maintaining concentrations of harmful agents within prescribed limits will be called chemistry procedures.

Refer to Section 13.5.2.2.1 . 2 of 3 Revision 8 September 25, 1996

  • TABLE 17.2-1 (Cont) B. Additional NRC requirements HCGS-UFSAR
1. Technical Specification Administrative Controls (a) StatieE: OperatieE:s Review Celftlftittee (SORG) (b) .Nuclear Safety Review (c) Reportable occurrences.
2. Inservice Inspection Plan 3. Reporting of Defects and Noncompliance.
4. Modifications to Site Grading. 3 of 3 Revision 8 September 25, 1996 TABLE 17.2-2 SEISMIC II/I -DESIGNATED STRUCTURES, SYSTEMS, AND COMPONENTS A seismic II/I designation is incorporated on the following design document types: a. Drawings 1. System isometrics 2 . Area drawings 3. Concrete unit masonry details 4. Heating & ventilation duct layout 5. Control room ceiling layouts 6 . Floor plans 7. Miscellaneous steel drawings 8. Piping and Instrumentation Diagrams (P&ID's) b. Indices 1. Pipe line index 2. Equipment index c. Specifications
1. Acoustical unit ceilings 2. Insulation for reactor pressure vessel (RPV) and drywell piping equipment The Seismic II/I identification on drawings and indices is provided in the detail of the document, as necessary, to define "Q" items/boundaries.

A "Q" suffix is added to the drawing number of those drawings that identify application of the Seismic II/I QA program. The Seismic II/I identification on specifications consists of adding a "Q" suffix to the specification number. 1 of 2 HCGS-UFSAR Revision 4 April 11, 1992

  • *
  • TABLE 17.2-2 (Cont) Seismic II/I structures, systems, and components are further delineated in Table 3.2-1 . 2 of 2 HCGS-UFSAR Revision O
  • TABLE 17.2-3 F-DESIGNATED SYSTEMS An "F"-designation system is incorporated on the following design document types as a minimum: a. Drawings 1. P&IDs for Fire Protection System (FPS) 2. FPS safety-related area drawings 3. Fire wall location drawings 4. Structural steel fireproofing drawings 5. Concrete unit masonry details 6. Penetration seal details 7. Door hardware schedules
8. Lighting notes, symbols, and details 9. Lighting and telephone plans 10. FPS isometrics.
b. Indices 1. Pipe line index 2 . Equipment index 3. Instrument index 4. Valve index. FPS-QA identification system incorporation on drawings and indices is provided in the detail of the document, as necessary, to define "F" items/boundaries.

An "F" suffix is added to the drawing number of those drawings that identify application of the FPS-QA program. Specifications are as follows: Deluge water spray and sprinkler system Fire and smoke detection system HCGS-UFSAR 1 of 2 Revision O April 11, 1988

  • TABLE 17.2-3 (Cont) Carbon dioxide systems Installation of carbon dioxide system Portable extinguishers Hose racks for wet standpipe system Horizontal fire pumps Fireproofing of structural steel FPS-QA identification system incorporation onto specifications consists of adding an "F" suffix to the specification number. Fire Protection Systems, including emergency lighting and communications, are I further delineated in Table 3.2-1 . 2 of 2 HCGS-UFSAR Revision 4 April 11, 1992
  • TABLE 17.2-4 R -DESIGNATED SYSTEMS The letter "R" shall be used to identify items of the Radioactive Waste Management system which protect the health and safety of the public, and plant operating personnel from uncontrolled discharge of solid, liquid, or gaseous radioactive waste to the environment.

The radwaste management systems classified as quality group R shall be designated by the use of R-flags on piping and instrumentation diagrams. Quality group R standards shall be those provided in Regulatory Guide 1.143. Radwaste Management Systems are further delineated in Table 3.2-1. 1 of 1 HCGS-UFSAR Revision 4 April 11, 1992 April 11, 1988

  • QUALITY ASSUHANCE/NUCLEAR SAFETY REVIEW MANAGE II conn EC TIVE /\C TIOtl A OU/\LITY SEHVICES MANAGER QUALITY ASSESSr.IEtH -illO.u:cft E 6Jq MANA QUALITY SESSMENT ALEM) Updalrd FSl\R MANAGER EMPLOYEE COtlCERNS fAft r;i;t/4t 17.z-J l) fnJ Trt1 c I/£ LJ, PUOLIC SERVICE ELECTRIC AND GAS COMPANY tlOPE CREEK tlUCLEAR GENERATING STATION QUALITY ASSURANCE/

tlUCLEAfl SAFETY REVIEW Rrvlslon 0, 25, I 99G r1uu1117.2*1



*

! -

  • QUALITY, NUCLEAR TRAINING & EMERGENCY PREPAREDNESS CHIEF NUCLEAR OFFICER & PRESIDENT

-NBU DIRECTOR -QUALITY, NUCLEAR TRAINING AND EMERGENCY PREPAREDNESS LEGEND: lNRB I I I I I I MANAGER QUALITY ASSESSMENT PROGRAM MANAGER-NRB REPORTS TO COORDINATION TECHNICAL TRAINING/SERVICES MANAGER OPERATIONS TRAINING MANAGER MANAGER CORRECTIVE ACTION EMERGENCY PREPAREDNESS MANAGER I MANAGER EMPLOYEE CONCERNS PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM NUCLEAR GENERATING STATION QUALITY, NUCLEAR TRAINING & EMERGENCY PREPAREDNESS Updated FSAR Figure 17.2-1 Revision 8 Sheet 1 of 1 September 25, 1996

  • *
  • Document Control Desk Attachment 3 PROPOSED SALEM CHANGES LR-N970364
  • *
  • 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE Public Service Electric and Gas Company (PSE&G) is responsible for assuring that the oper-;ci.tion, maintenance, refueling, and modification of the nuclear generating stations are accomplished in a manner that protects public health and safety and that is in compliance with applicable regulatory requirements.

To carry out this responsibility, PSE&G developed and implemented a comprehensive Quality Assurance (QA) Program tnat was applicable to the design, construction, and testing phases and is now applied to the operation phase. The Operational Quality Assurance Program is described in the following doeumento:

1. NC.VP PO.ZZ OOlO{Q), Operational Quality Aoouranee Program establishes the Quality Assuranee Program. Nuclear Administrative Procedures the programs and processes that implement the QA Program. The QA Program provides measures to assure the control of activities affecting the quality function of structures, systems, and components, to an extent consistent with their importance to safety. The Quality Assurance Program encompasses fire protection of safety-related areas and other activities enumerated in Regulatory Guide 1.33. A planned monitoring assessment and audit program assures effective implementation of the Operational Quality Assurance Program. An assessment is a direct observation of activities and review of documentation to verify compliance/conformance to specified requirements and effectiveness of processes.

The program provides coordinated and centralized quality assurance direction, control, and documentation as required by Nuclear Regulatory Commission (NRC} criteria set forth in lOCFRSO, Appendix B. The program provides for monitoring, assessing and auditing elements of the For-Duty (FFD} Program as set forth in 10CFR26 and is applied to, and includes non Q-list (i.e. balance of plant} activities and services necessary to achieve safety, reliability, availability, and economy in the operation of the Salem Generating Station. Applicable NRC Regulatory Guides, codes, and standards, as well as the policy statements contained in the Nuclear Administrative Procedures Manual, are used by PSE&G organizations performing activities affecting safety to prepare appropriate implementing procedures. To assess the effectiveness of the PSE&G Quality 17.2-1 SGS-UFSAR Revision 15 June 12, 1996

  • Assurance Program, independent auditors from outside the company audit the program every 2 years for compliance with lOCFRSO, Appendix B, and other regulatory commitments.

Reports of such audits are made directly to upper management. Quality Assurance (QA) policy statements are issued by key management including the Chairman and Chief Executive Officer and the Chief Nuclear Officer and President -Nuclear Business Unit (CNO/PNBU). These policy statements are mandatory throughout the Company for nuclear facilities. Key policy elements, as they apply to nuclear safety, include the following:

1. Nuclear safety is of the highest priority and shall take precedence over matters concerning power production.
2. The public's health and safety is the prime consideration in the conduct and support of PSE&G's nuclear operations and shall not be compromised.

All decisions which could affect the health and safety of the public shall be made conservatively.

3. The Operational Quality Assurance Program is an essential part of the PSE&G commitment to safe and reliable nuclear power operation.

Applicable program requirements shall be strictly adhered to in the performance of activities covered by the Operational Quality Assurance Program. PSE&G requires its suppliers and contractors to assume responsibility for establishing and implementing Quality Assurance/Quality Verification (QA/QV} programs, as applicable, to meet lOCFRSO, Appendix B. However, responsibility for the overall QA program is retained and exercised by PSE&G. QA reviews those programs and conducts appropriate monitoring and auditing as required to assure that the suppliers are properly implementing 17.2-2 SGS-UFSAR Revision 15 June 12, 1996

  • their QA/QV programs.

The Operational QA Program verifies that requirements necessary to assure quality are properly included or referenced in procurement documents. In addition, these suppliers' procurement documents include applicable PSE&G quality assurance requirements for items and services provided by their suppliers. 17.2.1 Organization The Operational QA Program, referred to hereafter as the QA Program, assures that adequate administrative and management controls are established for safe operation of the station. Implementation is assured by ongoing review, monitoring, assessment and audit under the direction of the Director -Quality Aoouranee/Nuelear Safety Review, who reports to the CNO/PNBU.

=:f.p::t?

.. .uzj:der:. the:* *ccntJ:foT'. =pf": t,lm" .. ... Quality, Company organization is shown on Figures 13.1-1 through 13.1-9 and 17.2-1. Responsibilities for activities affecting quality are described in the following sections. 17.2.1.1 Nuclear Business Unit The Chief Nuclear Officer and President -Nuclear Business Unit (CNO/PNBU) is responsible for managing and directing the nuclear activities of the company. Overall duties and responsibilities of the Nuclear Business Unit (NBU) are provided in Section 13. 1. Vice Presidents, Directors and General managers reporting to the CNO/PNBU are responsible for implementation of QA requirements by their staff. These QA requirements are contained in the Nuclear Administrative Procedures Manual and individual department documents. The CNO/PNBU regularly assesses the scope, status, adequacy, and compliance of the QA program to lOCFRSO, Appendix B, through: 1. Frequent contacts in staff meetings, QA audit reports, audits by independent auditors, NRC inspection reports, department status reports. 17.2-3 SGS-UFSAR Revision 15 June 12, 1996

  • *
  • 2. An annual assessment of the QA program that is preplanned and documented.

This assessment addresses the scope, status, and adequacy of the QA program. Corrective action is identified and tracked. l7.2.l.l.l Quality Assurance The DIR QA/HSR P;i:#*-'Stii?.@

jj:fffS1#¥:!i*=1fiM{:

§R is responsible for defining, formulating, implementing, and coordinating the QA program. The DIR QA/NSR has been-delegated the authority and has the independence to interpret quality requirements, identify quality problems and trends, and provide recommendations or so 1 u ti ons to quality probl BPS#}f: g$#.f:gi\#1##§Ji. The DIR QA/HBR ffW is responsible for approval of the QAf afffi NSR Department Manual used during the operations phase of the nuclear stations{ The DIR Q."./N'BR also is responsible for verifying compliance with established requirements for the QA program through document review, inspection, monitoring, assessments and audits QA provides a centralized coordinating function for QA/QV activities applied to the operations phase. The DIR

©.B.$f.\ffi#:¥foii
ffl¥)t:::rniue:

has the authority and responsibility to stop work, through the issuance of a Stop Work Order, when significant conditions adverse to quality require such action . The PSE&G policies and organization structure assure that the DIR QA/N'BR, Directop* "*..; * \])!::::m:;;::::::::i\@Rg!\\]f:lt'! has sufficient organizational freedom and independence to carry out his responsibilities. f:BP Responsibilities of the Manager -Corrective Action and Quality Services include the following:

1. PreparatieR aRd H1aiRteE:aRce of the QA/NBR DepartffleRt MaRual, the QA Preg:raffl deooription in the UFB.".R, and the Operational Program desoription in the nuclear Aeifflinistrative Procedures Manual. 2. Review of the Nuclear Administrative Procedures HaRual for compliaRce with the Operational QA Prograffl. 3 . Performing assessments of PSE&G Program administrative and implementing:

procedures (as necessary, these assessfflents may also iRclude statioR administrative and implementing: procedures) .

  • *
  • 4. g Rel aeff\iHis teriag the :eaet1:etiag Qi'\ Pregraff\

erieatatiea fer :i?ersen. traiaiH§' aHe eertifieatieH pre§'raff\ for Q.7'* :i?ersonnel iHvelved iH iHspeetioH, at1:eitiHg aetivities, fflaiHtaiHiHg the QA traiHiHg :i?laH, aHe assesslfteHts aHd fflaiHtaiHiH§' Q."i: traiHiH§' reaords . SGS-UFSAR 17.2-4 Revision 15 June 12, 1996

  • S. Review of new regulatory requirements for QA Program impact. 6 . Coordination of tfie cofflff!itment verification program on a selected basis. 7. Administration of tfie Nuclear Repair Program. B-i. Review of -engineering documents such as equipment specifications, *.veld procedures, etc. for inclusion of QA requirements . .g. it. Review and approve specifications for Q-listed materials, equipment, and services.

M$. Review of procurement documents for insertion of applicable QA requirements. +/--+/-*=. Conduct of supplier surveys, audits and surveillances. Evaluation of prospective and existing Supplier QA Programs. Administration of the Corrective Action Program. ::;::: -+/-47. Performing statistical analysis trend reports for management. +/--5-g. Monitoring/auditing of nuclear fuel fabrication and installation. Review of NEU fuel specifications for inclusion of QA requirements. +/--:7-ib.. Perform material evaluation activities on items subject to the QA Program. :::::;:;:::; Responsibilities of the Manager -Quality Assessment include the following:

m:;

17.2-5 SGS-UFSAR Revision 15 June 12, 1996

  • Development and implementation of the QA Audit and Assessment Program. Performing assessments of contractor activities and evaluation of emergent contractor programs and procedures.

Planning and scheduling of surveillances conducted within the Nuclear Business Unit. 47:. Performing station procedure review and concurrence. 5;i4; * .e-1:5.. Performing design change package pre-implementation review and closure :-:*:*:-:-:- review for compliance with Inspection Hold Point (IHP) requirements. Performing Performance Based Inspections'/ (IHPs) .*.*.:

  • Rcspoasibilitics of tfic Haaagcr Nuclear Safety Review arc described ia Scctioa 13.1. Reopoaoibilitieo of tfie Haaager Liceaoiag aad Regulatioa are described ia Scctioa 13.1.

f:i!#wii'§F:§*

      1. .$.@#¢
  1. ft@t §tj;¢
  • SB E83.'

Responsibilities of the Manager Employee are described in Section 13. 1. 17.2.1.1.1.1 Quality Assurance Personnel Qualifications The DIR and the QA managers reporting directly to him tfie DIR QA/N"SR must each have a combination of 6 years of experience in the field of QA and operations. At least 1 of these 6 years of experience must be in the overall implementation of a nuclear power plant QA program. A minimum of 1 year and a maximum of 4 of the 6 years of experience may be fulfilled by related technical or academic training. Personnel performing inspections, examinations, and test activities (i.e., to verify conformance) are certified as Level I, Level II, Level III as appropriate to their responsibilities, also in accordance with Regulatory Guide 1.58. Personnel performing quality assurance audits are certified as auditors or lead auditors as appropriate to their reponsibilities in accordance with Regulatory Guide 1.146. 17.2-6 SGS-UFSAR Revision 15 June 12, 1996

  • The DIR fulfills the above qualifications with the addition of the following:
1. Knowledge and experience in quality
2. High level of leadership, with the ability to command the respect and cooperation of company personnel, suppliers, and construction forces. 3. Initiative and judgment to establish related policies to attain high achievements and economy of operations.

17.2.1.1.2 Operational Review

advisory groups, the Station Operations Review Committee (SORC), Onsite Safety Review Group (SRG) , and the Offsite Safety Review Group (OSR) , are responsible for reviewing and evaluating items related to nuclear safety. The overall responsibilities of these groups are described in Section 13.4. **:*:.:*:*:*:*:*:*****:*:*:**** . The Manager Quality Assessment is to all SORC meetings and receives the minutes of the meetings, attends the meetings periodically.

at

17.2.1.2 P4aplewood Teotinq Servieeo The P4anager Haplewood Testing Services reports to the Director Business and Maintenance Services in fossil generation. Maplewood Testing Services performs calibrations, analyses, and O"<l'aluations on systems, equipment, and materials, as requestee by PSB&G departments, and maintains compliance with its quality assurance program . 17.2-7 SGS-UFSAR Revision 15 June 12, 1996

  • *
  • ma+/-rlta+/-rleat
                • .:*:*:*:*:*:*:*:*:*:*:*:*:*:*:*:-:-:-:-:-:*:*:-:-:-:-:
  • . : jj:f

'!RF R ;:? ::::::::: ?!@t:r

  • *
  • *
  • *
  • * *
  • 17.2.1.3 Distribution Systems Department The Vice President

-Electric Distribution Systems reports to the Senior Vice President Transmission and Distribution . The Distribution Systems Department is responsible for providing support to Salem operations for setting and testing protective relays for the external vital power supplies at the station. SGS-UFSAR 17.2-8 Revision 15 June 12, 1996

  • 17.2.2 Quality Assurance Program The QA program is designed to comply with the requirements of 10CFR50, Appendix B, and with fire protection program requirements of Appendix A of Branch Technical Position No. 9.5-1. This program is applied to items and activities delineated in the Salem Q-List that can affect the health and safety of the public. During the 17.2-Sa SGS-UFSAR Revision 14 December 29, 1995
  • *
  • SGS-UFSAR THIS PAGE INTENTIONALLY BLANK 17.2-Bb *.., -,....-,.

.. :; x--it.-..,,..,,,,...,... 0---* .,--......,.,;:*gt..,n;..+" x*-*c--<<'OF* Revision 11 July 22, 1991

  • * ... &1 _...,. operational phase, this includes:
1. Structures, systems, and components delineated in Table 17.2-1, Section 2. 2. Safety-related activities delineated in Regulatory Guide 1.33 and summarized in Table 17.2-1, Section 1. 3. Portions of structures, systems, and components whose continued function is not required, but whose failure, caused by a safe shutdown earthquake (SSE), could reduce the functioning of a Seismic Category I structure, system, or component to an unacceptable safety level; or could result in an incapacitating injury to occupants of the control room as shown in Table 17.2-1. 4. Fire protection systems, including emergency lighting and communications, as shown in Table 17.2-1. 5. Radwaste management systems as described in Table 17.2-1. The QA program is applied during the operational phase using a graded approach to the extent consistent with the item's or activity's importance to safety. These activities are performed in compliance with applicable regulatory requirements that include but are not limited to: 1. Regulatory Guide 1.8, Qualification and Training of personnel for Nuclear Power Plants. 2. Regulatory Guide 1.17, Protection of Nuclear Plants Against Industrial Sabotage.
3. Regulatory Guide 1.29, Seismic Design Classification.
4. Regulatory Guide 1.30, Quality Assurance Requirements for the Installation, Inspection, and Testing of 17.2-9 SGS-UFSAR Revision 15 June 12, 1996
  • *
  • SGS-UFSAR Instrumentation and Electric Equipment.
5. Regulatory Guide 1. 33, Quality Assurance Program Requirements (Operation)
6. 7. Regulatory Guide 1.37, Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water Cooled Nuclear Power Plants. Regulatory Guide 1.38, Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water Cooled Nuclear Power Plants. 8. Regulatory Guide 1.39, Housekeeping Requirements for Water-Cooled Nuclear Power Plants. 9. Regulatory Guide 1. 54, QA Requirements for Protective Coatings Applied to Water-Cooled Nuclear Power Plants. 10. Regulatory Guide 1.58, Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel.
11. Regulatory Guide 1. 64, Quality Assurance Requirements for the Design of Nuclear Power Plants . 12. Regulatory Guide 1. 88, Collection, Storage, and Maintenance of Nuclear Power Plant Quality Assurance Records. 13. Regulatory Guide 1.94, Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel during the Construction Phase of Nuclear Power Plants. 17.2-10 Revision 10 July 22, 1990
  • 14. Regulatory Guide 1.137, Fuel-Oil Systems for Standby Diesel Generators.
15. Regulatory Guide 1.144, Auditing of Quality Assurance Programs for Nuclear Power Plants. 16.

Guide 1.146, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants. 17. BTP 9.5-1, Appendix A, Guidelines for Fire Protection for Nuclear Plants Docketed Prior to July 1, 1976. Commitments to Regulatory Guides, with respect to revision level, exceptions, etc, are contained in Section 3, Appendix 3A. The code QA requirements are used for the procurement of systems, components, and structures covered by ASME Boiler and Pressure Vessel Code B31.l and B31.7 or evaluated to be an acceptable replacement. The standard QA program controls apply to Q-Listed code items following receipt at the station. In addition, applicable requirements of Regulatory Guide 1. 38 are applied to ASME Code procurements where necessary to assure safe shipment. Substantive changes to the QA program described herein will be submitted to the NRC within 30 days of implementation. Nonsubstantive changes will be identified in the annual UFSAR updates. 17.2-11 SGS-UFSAR Revision 15 June 12, 1996 The station General Manager has instituted and will maintain a station administrative procedures (SAP) manual. Regulatory Guide 1.33 requires that plant activities affecting quality-related items and services be conducted in accordance with written administrative controls prepared by management. The procedures and instructions by which plant activities are performed are prepared by the responsible organization as required by the Nuclear Administrative Procedures Manual, reviewed by the organization responsible for the activity, reviewed as required by QA and SORC, and approved by the department manager. Nuclear Administrative Procedures (NAPs) and station APs and all subsequent revisions thereto are reviewed by QA and SORC and are approved by the station General Manager. Procedures cannot be implemented unless the review/approval process is accomplished. The Nuclear Administrative Procedures Manual provides a means to accommodate on-the-spot changes to subtier implementing procedures. The routine practice for revising a procedure is to repeat the original review and approval sequence. Implementation of the QA program is verified by means of independent inspections, assessments, monitoring, and audits conducted by QA. QA reviews and analyzes problems affecting quality that occur during the operational phase. Items subject to review include: 1. Documented nonconformances occurring at the supplier's facility and those identified during receiving, storage, installation, test, and operation, e.g., Deficiency Reports, Nonconformance Reports, Work Orders, Licensee Event Reports, etc. 2. Documented corrective actions taken on conditions adverse to quality and actions to prevent recurrence on significant conditions adverse to quality. 3. NRC inspection findings, notifications, bulletins, etc. 17.2-12 SGS-UFSAR Revision 15 June 12, 1996 The DIR Q.'\/NBR i:l;t,id; ?:El\ i:i.;:i;4 . ftae-J.:%y.E; the authority to stop work through the issuance of a Stop Work Order where continuance of an activity would seriously compromise quality or constitute a persistent and deliberate failure to correct a significant condition adverse to quality. Designees include the Manager Quality Assessment for activities conducted at the station and the Manager Corrective Actien and Quality Cervices for supplier activities. QA reports significant conditions adverse to quality affecting the quality assurance program to respective management, along with: 1. Measures taken to improve QA program controls.

2. Appropriate recommendations to achieve compliance with applicable requirements.

Management policy and administrative procedures provide all personnel with awareness and direction for reporting of defects and noncompliance pursuant to 10CFR21. The QA program requires that safety related activities and activities affecting the fire protection of safety-related areas, be accomplished under suitably controlled conditions. The program takes into consideration the need for procedures, special controls, cleanliness, special processes, test equipment, tools, and skills to obtain the required quality and the verification of quality by inspection, test, examination, monitoring, assessments and independent review and audit. These activities include, but are not limited to, designing, purchasing, fabricating, handling, shipping, storing, cleaning, erecting, installing, inspecting, testing, operating, maintaining, reworking, repairing, refueling, and modifying. Personnel who have the responsibility to implement the QA program also have the responsibility and authority to escalate unresolved quality problems to the level of management necessary to effect resolution. Escalation is applied by QA personnel to increasingly higher levels of management, up to the CNO/PNBU, as required. 17.2-13 SGS-UFSAR Revision 15 June 12, 1996 Personnel performing Q-Listed activities are trained or indoctrinated as necessary to assure that suitable proficiency is achieved and maintained. Personnel outside the QA organization who perform inspections and tests are trained and qualified in QA concepts and practices. Orientation is provided for new employees entering QA from other organizations within PSE&G and. from outside the company. An outline of the content and program objective is contained in the QA training and certification program. The training and certification program is designed to familiarize the employee with: 1. Codes, regulations, specifications, etc, applicable to nuclear and other power generation equipment.

2. QA procedures, instructions, specifications, documentation, records, etc. 3. Auditing and assessment objectives and techniques.
4. Operational Quality Assurance Program. 5. Quality Assurance Operational Philosophy.
6. Other organizations within PSE&G with which QA interfaces.

QA administers formal QA training sessions for personnel outside the QA organization who perform safety related activities. The content of these training programs, dates of the sessions, and names of the attendees and their individual performance evaluations are documented and retained. Personnel requiring certification are evaluated to establish their qualifications for their respective level and discipline. Recertification is based upon demonstrated continued proficiency or requalification, if necessary. Personnel requiring certification in accordance with Regulatory Guide 1.58 are limited to personnel who perform inspection, test, and nondestructive examination (NDE) 17.2-14 SGS-UFSAR Revision 15 June 12, 1996

  • 303acti vi ties, personnel who perform post-design modification testing, and Inservice Inspection personnel who perform NDE and tests required by the Inservice Inspection Program. Those above personnel who perform visual examination (VTl, 2, 3) and NDE in accordance with the Inservice Inspection Program are trained, qualified, and certified in accordance with a program which additionally meets the prescribed supplementary requirements of ASME Section XI. These personnel receive a periodic training needs assessment to identify additional supportive training needs, as well as to evaluate individual training performance.

The assessment period is 3 years or less. Personnel who are qualified and requalified for their respective level and discipline in accordance with Regulatory Guide 1.8 and ANSI Nl8.l and direct or supervise the conduct of individual preoperational, startup, and operational inspections and tests, including Technical Specification Surveillances and periodic inspection and test of fire protection equipment, do not require certification per Regulatory Guide 1.58 and ANSI N45.2.6 1978. When a single inspection or test requires implementation by a team or group, personnel not meeting the requirements of Regulatory Guide 1.58 and ANSI N45.2.6 1978 may be used in data-taking assignments or in plant or equipment operation provided they are supervised or overseen by an individual participating in the inspection, examination, or test and the individual is qualified and requalified for their respective level and discipline in accordance with either Regulatory Guide 1.8 and ANSI Nl8.l or the individual is certified in accordance with Regulatory Guide 1.58 and ANSI N45.2.6 1978 as appropriate. In addition, Regulatory Guide 1.58 and ANSI N45. 2. 6 1978 do not apply to NRC -Licensed Operators and Senior Operators for the performance of duties specified in 10 CFR 55 "Operator Licenses". The Nuclear Training Center is responsible for the licensed operator training and retraining, in addition to other technical and supervisory training programs. Training programs of supporting organizations are described in their manuals, which are required to comply with the QA program . 17.2-15 SGS-UFSAR Revision 15 June 12, 1996

  • General Employee Training, which is required for all personnel having access to the station, is the responsibility of the U1;lelear See"1:rity.

17.2.3 Design Control The scope of the design control program includes design activities associated with the preparation and of design documents, including the correct translation of applicable regulatory requirements into design modification, procurement, and procedural documents. The design control program includes activities such as field design engineering, associated computer programs, compatibility of 17.2-lSa SGS-UFSAR Revision 15 June 12, 1996 THIS PAGE INTENTIONALLY LEFT BLANK 17.2-lSb SGS-UFSAR Revision 13 June 12, 1994

  • *
  • materials, and accessibility for inservice inspection, maintenance, and repair. Issuance of new drawings and revisions to existing drawings require the implementation of a design change. The term design change, as used throughout this document, shall apply to both design and configuration changes. The Nuclear Engjneering Manual (NEM) procedures provide implementation guidance for the intent of Regulatory Guide 1. 64, "Quality Assurance Requirements for the Design of Nuclear Power Plants." QA will conduct periodic engineering process assessments which include procedures contained in the The Nuclear Engineering Department has the following responsibilities:
1. Prepare and update detailed engineering and design documents, including drawings and specifications, for all systems, components, and structures.
2. Specify applicable codes, standards, regulatory and quality requirements acceptance standards, and other design input in design documents.
3. Identify systems, components, and structures that are covered by the quality assurance program . 4. Perform design verification for systems, components, and structures covered by the QA Program. 5. Perform safety evaluations of proposed design changes, as required.

Sa. Apply Generic lOCFR 50. 59 Safety Evaluation, as required, to configuration changes that impact the SAR. 6. Prepare documents for procurement of equipment, materials, and components. 17.2-16 SGS-UFSAR Revision 15 June 12, 1996

  • 7. Recommend engineering consultants and laboratories for procurement services and coordinate their activities . 8. Review design documents submitted by suppliers (including the Nuclear Steam Supply System (NSSS) supplier) and contractors.
9. Specify, or approve as required, inspections and/or tests. 10. Designate whether they will seek the service of other qualified engineering organizations.

The cognizant engineer is responsible for the identification and completion of design analyses. The purpose of design analysis is to assure that the technical design is accomplished in a planned, controlled, and correct manner. Types of design analyses include, but are not limited to, reactor physics, stress, seismic, thermal, hydraulic, radiation, and accident. Design verification is performed on design analyses, drawings, specifications, and other design documents, as applicable. It is the process of reviewing, confirming, or substantiating the adequacy of design by one or more methods. Design verification is performed on changes to previously verified designs, including evaluation of the effects of those changes on the overall design. In general, design verification is completed prior to installation and in all cases is completed prior to placing the modified system or component into service. Design verification is performed by competent individuals or groups other than those who performed the original design, with the following exception: a design verifier may be the design originator's supervisor, provided that he did not specify a singular design approach or rule out certain design considerations and did not establish the design inputs used in the design, or if the supervisor is the only individual competent to perform the verification. This design verification provision is individually documented and approved in advance by the supervisor's management. Procedural control is 17.2-17 SGS-UFSAR Revision 9 July 22, 1989

  • established for design documents that reflect the commitments of the UFSAR; this control differentiates between documents that receive formal design verification by interdisciplinary or multiorganizational teams and those which can be reviewed by a single individual (a signature and date is acceptable documentation for personnel certification).

Design documents subject to procedural control include, but are not limited to, specifications, calculations, computer programs, system descriptions, and drawings, including flow diagrams, electrical line diagrams, structural systems for major facilities, site arrangements, and equipment locations. Specialized reviews should be used when uniqueness or special design considerations warrant. The responsibilities of the verifier, the areas and features to be verified, the pertinent considerations to be verified, and the extent of documentation are identified in procedures. Control of this function is assured through periodic QA/NSR audits and assessments. Design verification methods comply with applicable requirements of ANSI N45.2.ll and may include, but are not limited to: 1. Design reviews. 2. Alternate or independent calculations.

3. Qualification testing. In the event that the verification method for design modifications is only by test, procedures and instructions will be written which include measures to ensure that: 1. Criteria are provided to specify when verification should be by test. 2. Where applicable, prototype, component or feature testing will be performed prior to installation of plant equipment.

In those cases where this cannot be met, the 17.2-18 SGS-UFSAR Revision 15 June 12, 1996

  • testing will be deferred, but not beyond the point when the installation would be irreversible.
3. Tests will be performed under conditions that simulate the most adverse design conditions, as determined by analysis.

Drawings are prepared by, or under the supervision of, a designer from information received from the responsible engineer, manufacturer's drawings, etc. The drawings are reviewed and initialed as being checked by another designer or design supervisor. The drawings are approved by the functional supervisor or his designee. Specifications and changes thereto for items covered by the QA program are prepared by Nuclear Engineering, and are reviewed by Supplier Assessment for QA content. QA review assures that the documents are prepared, reviewed, and approved in accordance with company procedures and that the documents contain the necessary QA requirements, such as inspection and test requirements, acceptance requirements, and the extent of documenting inspection and test results . The Station Operations Review Committee (SORC) reviews proposed changes affecting nuclear safety and makes recommendations concerning implementation of the change to the station general manager. The design change process provides for signoff of the design change by the appropriate department head for the purpose of identifying required procedure change. If the proposed modification involves a Technical Specification change or is considered by the SORC to involve an unreviewed safety question (10CFR50.59), the matter is submitted to the

.
;
;
::::::::::::::*:*:*=

Safety R:eview Greup (OSR) for a determination of its safety implication before a license change request is submitted for NRC approval.

  1. fil@f Nuelear Eng:ineerin§'

prepared design changes, Nuclear Engineering assigns a project team led by a project The project team consists of members of various 17.2-19 SGS-UFSAR Revision 15 June 12, 1996

  • organizations, both internal and external to Nuclear Engineering.

The project team members are responsible for providing technical and administrative input to the entire design change process, which consists of design, installation, testing, and closeout phases. The technical and administrative input is guided by the requirements of those organizations which comprise the project team. The project manager ensures that the specific requirements of each organization on the project team are considered to ensure the overall quality of the product. For design changes important to safety, the QA representative on the project team provides input and assures that design changes include quality assurance requirements such as inspection and test requirements, acceptance requirements, test result documentation, and project team compliance with company procedures during preparation, review, and approval of design changes. Updating of records, including drawings, blueprints, instructions technical manuals, and specifications resulting from design changes, is the responsibility of the Senior Vice President -Nuclear Engineering. provide for the timely update of affected drawings implementation to reflect as-built configuration. 17.2.4 Procurement Document Control Design change procedures following design change Procurement documents and changes thereto for the purchase of Q-Listed material, equipment, or services are reviewed and approved by QA prior to issuance by the Purchasing Department to the prospective supplier. QA review assures that spare and replacement parts are procured using controls which are commensurate with current QA program requirements. 17.2-20 SGS-UFSAR Revision 15 June 12, 1996

  • The review also assures that procurement documents adequately and correctly:
1. Identify applicable QA program requirements . 2. Reference applicable regulatory requirements, codes, and standards.
3. Provide right of access for source surveillance and audit by QA or its agents. 4. Provide for required supplier documentation to be submitted to PSE&G or maintained by the supplier, as appropriate.
5. Provide for PSE&G review and approval of critical procedures prior to fabrication, as appropriate.

Procurement documents require suppliers and contractors of other than grade items to provide services or components in accordance with a QA program that complies with applicable parts of 10CFR50, Appendix B. The requirement for notifying PSE&G of procurement requirements that have not been met is conveyed to the supplier through the standard warranty provision contained in each purchase order. In addition, where 10CFR21 is imposed, suppliers are required to comply with applicable reporting requirements . 17.2.5 Instructions, Procedures, and Drawings Organizations engaged in Q-Listed activities are required to perform these activities in accordance with written and approved procedures, instructions, or drawings, as appropriate. Simple, routine activities that can be performed by qualified 17.2-21 SGS-UFSAR Revision 10 July 22, 1990

  • personnel with normal skills do not require a detailed written procedure.

Complex activities require detailed procedures. The designation of those activities requiring detailed procedures is made by cognizant department heads and, as a minimum, complies with applicable requirements of Regulatory Guide 1.33. Procedures references, include, as prerequisites, appropriate, precautions, scope, statement limitations, and of applicability, checkoff lists of inspection requirements, in addition to the detailed steps required to accomplish the activity. Instructions, procedures, and drawings also contain acceptance criteria where appropriate. The general manager:; is responsible for assuring that station procedures are prepared, approved, and implemented in compliance with the Nuclear Administrative Procedures Manual. Documents affecting nuclear safety are reviewed by the SORC for technical content, by QA for QA requirements, and are approved by the responsible station department manager or his designee. Nuclear Engineering is responsible for issuing specifications, drawings, blueprints, procedures and administrative and technical manuals associated with structures, systems, and components covered by the QA Program. Approved and implemented modifications and design changes are incorporated in these reference documents for the life of the station. Master lists of current editions or revisions of these documents are maintained by Nuclear and are available at the station to assure that only current and approved referenced documents are used. QA reviews and approves selected station procedures that implement the QA program, including testing, calibration, maintenance, modification, rework, and repair. Changes to these documents are also reviewed and approved. In addition, QA is responsible for review and approval of selected specifications, test procedures, and results of testing . 17.2-22 SGS-UFSAR Revision 15 June 12, 1996

  • *
  • 17.2.6 Document Control Instructions, procedures, drawings, and changes thereto are reviewed for the inclusion of appropriate QA requirements, approved by apppropriate levels of management of the PSE&G organizations producing such documents, and distributed on a timely basis to using locations.

Measures are provided for the timely removal of obsoiete or superseded documents from the using location. Supplier documents are controlled according to contractual agreements with suppliers. The following is a generic listing of key documents for the operational phase, showing minimum organization responsibility for review and/or approval, including changes thereto: 1. Design specification -Nuclear Engineering, QA. 2. Design modification, manufacturing, construction, and installation drawings Nuclear Engineering, Nuclear Services, station operations.

3. Procurement documents

-Initiating NEU organization, Purchasing Departfflenl::, Nuclear Services, QA. 4 . 5. Nuclear Administrative Procedures Manual responsible for implementation, QA. NEU organizations NEU second-tier manuals, including station administrative procedures -Cognizant department head, QA. 6. Maintenance, modification, and calibration procedures for Q-Listed designated station work activities operations.

7. Operating procedures

-Station operations. 17.2-23 SGS-UFSAR Revision 15 June 12, 1996

  • *
  • 8. UFSAR -

Operat:ions Services and other NBU organizations responsible for implementing applicable sections. In addition, QA reviews subsequent changes to the UFSAR sections to the extent necessary for assuring compliance with applicable QA program requirements.

9. Maintenance, inspection, and testing instruction

-NBU implementing organizations.

10. Post-modification test procedures

-Nuclear Engineering.

11. Design Change Requests -Nuclear Engineering, QA. QA involvement in the work activity includes review of work procedures prior to approval for designation of inspection hold points (see Section 17.2.10), review of completed safety-related Work Orders on a sampling basis, and periodic QA surveillance and assessment.

The establishment and maintenance of a document control system for all instructions, procedures, specifications, and drawings received from the NBU or prepared at the station for use in operating, maintaining, refueling, or modifying items and services covered by the QA program is the responsibility of the eni or Vice President !iucl ear Engineering. The Nuclear Administrative Procedures Manual describes the controls for specific documents. Control of station practices is included in the administrative procedures authorized by the responsible station department managers. Measures are established to assure that administrative procedures are up to date, properly authorized, changed only after the required review and approvals are obtained, and distributed to appropriate personnel. Design change procedures provide for the timely update of affected drawings, following design change implementation, to reflect as-built configuration. Computerized databases maintained by the NBU organization are used to control drawings, specifications, procedures and instructions .

  • Controls of software affecting nuclear safety are identified in the Nuclear Administrative Procedures Manual. These controls are based on applicable guidelines provided by the NRC and include software review and approval as well as access controls to prevent unauthorized software changes. 17.2.7 Control of Purchased Material, Equipment, and Services QA maintains an up-to-date listing of approved suppliers of material, equipment, and services covered by the QA program. This list identifies suppliers and contractors that have demonstrated the ability to supply acceptable material, equipment, or services.

The list includes manufacturers of commercial-grade items. All QA program procurements are made from approved suppliers. The responsible engineer and QA personnel select and evaluate prospective bidders and suppliers. The responsible engineer determines the technical competence of the supplier, while QA evaluates the prospective supplier's QA program for the capability of meeting applicable requirements of 10CFR50, Appendix B, and for extending applicable program requirements to subtier suppliers. Qualified QA personnel evaluate the prospective supplier's QA capability using one or more techniques, including but not necessarily limited to: 1. Evaluation of supplier's or contractor's procedures or manuals and changes thereto. 2. ASME code stamp approval.

3. Nuclear Utility Procurement Issues Council (NUPIC) or Nuclear Fuel Users Forum (NFUF) Audits. 4. Satisfactory past history of providing similar items. 17.2-25 SGS-UFSAR Revision 15 June 12, 1996
  • *
  • 5. Survey of supplier's facility.

The evaluations of the prospective suppliers are conducted using standard checklist form designed to include the 18 quality criteria of lOCFRSO, Appendix B, as appropriate. Surveys of capabilities include evaluation of management systems, manufacturing processes, and adherence to QA/QV procedures. The results of supplier evaluations are documented by the appropriate checklist form and filed. Supplier control is maintained through a planned inspection, monitoring, and audit program by QA. QA and the responsible engineer conduct a review of the manufacturing process for complex manufactured items, such as pumps, valves, heat exchangers, vessels, electrical panels, etc. This review establishes critical inspection points and establishes a notification point program for the identified inspection or surveillance activities. The established inspection or surveillance activities are implemented by qualified QA personnel or QA agents. Commercial grade items are dedicated in accordance with recognized industry standards, e.g. EPRI NP-5652. Monitoring of suppliers/contractors during fabrication, installation, modification, rework, repair, inspection, testing, and shipment of Q-Listed materials, equipment, and services is conducted by qualified QA personnel or QA agents at the supplier's/ contractor's facility or at the generating station. Surveillances are conducted in accordance with written procedures and are designed to assure conformance with procurement requirements, in accordance with the safety significance of the item or service. Periodic evaluations of the supplier/contractor quality program are also conducted, consistent with the importance or complexity of the 17.2-26 SGS-UFSAR Revision 15 June 12, 1996

  • item or service. Dependent upon the evaluation, additional audits or corrections by the supplier/contractor may be required.

Supplier's certificates of conformance are periodically evaluated by audit, inspection, or test to assure that they are valid. Results of these audits, inspections, or tests are documented. Where feasible, replacement parts adhere to the original design criteria (such as Nuclear Steam Supply System (NSSS} components in accordance with NSSS documentation and other code components in accordance with AWWA, AISC, SPCC., and ASME B&PV Code, editions and addenda as applicable to the component or system). This provides the intended level of safety and does not result in redesign of the system. The requirement for appropriate supplier documentation of conformance to applicable code, standard, specification, or other quality requirements is provided by the procurement document. The supplier-provided documentation is reviewed either at the supplier's facility during source surveillance, or by Material Compliance Group during material evaluation activities. A data review checkoff is used to document the acceptability of the supplier-provided data and to identify discrepancies. Evaluation of supplier equipment, material and services is conducted by qualified personnel to verify correct identification, appropriate documentation, and to verify that the item is acceptable and can be released for storage, installation, or use. Nonconforming items identified by the Material Compliance Group are tagged or segregated to prevent inadvertent use. described in Section 17.2.15. Nonconforming items are controlled as 17.2.8 Identification and Control of Materials, Parts, and Components Procurement document controls provide assurance that materials, 17.2-27 SGS-UFSAR Revision 13 June 12, 1994

  • r*,_-parts, and components received can be properly identified.

The identification is directly marked on the item or on records traceable to the item. The data review conducted at receiving assures that proper documentation of received items is available. Materials and items received without proper identification are tagged or segregated until satisfactory documentation and identification is obtained. Procedures require that Q-Listed materials, parts, and components be marked or otherwise identified and that such identity be maintained either on the item or on records traceable to it throughout receipt, storage, installation, and use. Protection against use of incorrect or defective items also is provided. Material identification and traceability is maintained for rework, repairs, and modifications throughout operation. which iH!pleffient reeyuirefficnts for the iclentifieation and eontrol of materials, parts, and components include Nuel ear Operations Services, Nuclear Engineering, station operations and QA for procureFRent document controls and Prootlrement and Materials Management, station operations and QA for rcoeipt, storage, installation, inspection ancl test activities. 17.2.9 Control of Special Processes Special process controls provide for the use of qualified procedures, equipment, personnel, and documentation of satisfactory completion of an activity. Special processes are generally those processes where direct inspection is impossible or disadvantageous. Procedures have been established for special processes such as welding, brazing, soldering, concreting, protective coating, cleaning, heat treating, and nondestructive examination (NDE) to assure compliance with codes and design specifications. The Senior -Nuclear Engineering is responsible for preparing special process procedures such as concreting, protective coating and cleaning, while the 17.2-28 SGS-UFSAR Revision 15 June 12, 1996

  • General Manager -

Operat:iens Services is responsible for preparing specifications for processes such as weldjng, brazing, soldering, and heat treating. Nuclear Engineering is responsible for preparing specifications for nondestructive examination (NDE). reviewed and approved by QA for necessary quality These specifications are content. QA moni taring assessements and audits assure that qualification of special processes, equipment, and personnel have been satisfactorily performed. Procedures for implementing the requirements of the specifications are prepared either by the NEU or by supplier personnel and are reviewed by QA and the appropriate general manager, or their designee, with the exception of special process procedures prepared by code suppliers holding a valid certificate of authorization. Qualification records of procedures, equipment, and personnel associated with special processes are retained as stated in Section 17.2.17. 17.2.10 Inspection A planned inspection program is conducted and documented by personnel appropriately qualified in accordance with Section 17. 2. 2. The inspection program verifies conformance to the established procedure, code, or standard, consistent with the item's or activity's importance to safety. The inspection program for maintenance and modification activities is based upon the following three _important levels of inspection:

1. SGS-UFSAR Worker Checks Quality cannot be achieved unless the worker performs the activity individual best able in a quality manner. The worker is the to control the quality of work being performed.

Work steps that contain elements impacting plant equipment or systems have provisions for signoff by the worker. This worker signoff establishes accountability for the activity and is 17.2-29 Revision 15 June 12, 1996

  • acknowledgement that the activity has been performed as specified in the work step. 2. Supervisory Inspection

-Although the work supervisor may have overall responsibility for the conduct and performance of the work activity, certain conditions at the work location require supervisory inspection to increase coqfidence that work activities are completed as specified through familiarity of the work activity, work group, or past experience. Supervisory inspections are established in the appropriate work procedure and accomplished through direct observation of the work activity.

3. Independent Inspection

-Independent inspections are not intended to dilute or replace the responsibility of the worker check or supervisory inspection for quality of work. Independent inspections provide the maximum confidence attainable that the work activity has been performed in accordance with the overall objective. Typical guidelines for establishing independent inspections include conditions similar to the following: -Work activity affecting redundant equipment or potentially causing cascading failure. -Retest will not verify the applicable attribute. -Establishing a baseline in a new process or procedure. -It is deemed necessary to maintain confidence in the work process. This guidance is considered by the responsible QA organization in the establishment of inspection activities . 17.2-30 SGS-UFSAR Revision 9 July 22, 1989

  • Independent inspections are identified as Inspection Hold Points (IHPs) in the applicable work instructions and are performed by individuals independent of the work activity.

IHPs cannot be passed without authorization from the applicable management representative responsible for the inspection activity. General guidelines for the inspection criteria are established by QA and incorporated into various administrative and work instructions. Independent inspections are performed by QA or other individuals who are independent of the work activities. If the individuals performing inspections are not part of the QA organization, the inspection procedures, personnel qualification criteria, and independence from undue pressure, such as cost and schedule, are reviewed for acceptability by the QA organization prior to initiation of the activity. Work procedures and inspection instructions include, as required, characteristics to be inspected, method of inspection, acceptance criteria, required measuring and test equipment, and required reference documents. Documentation includes inspection identification and results of inspection performance. As a result of its review, the Station Operations Review Committee (SORC) may recommend additional or different hold points to the organization performing the work activity . Periodic inspection, other than IHPs, is performed by qualified individuals other than those who performed or directly supervised the activity being inspected. These typically include periodic inspections of the following:

1. Storage areas. 2. Housekeeping (general).

SGS-UFSAR 17.2-31 Revision 11 July 22, 1991

.. "* 3. Fire protection equipment.

4. Special handling tools and equipment.
5. NDE visual inspection required by the inservice inspection program. An independent organization shall perform NDE as required, using qualified individuals other than those who performed or directly supervised the activity.

When inspections are performed by individuals other than those who performed or directly supervised the work, but who belong to the same work group, and the activity involves breaching a pressure-retaining boundary, the quality of the work is demonstrated through appropriate testing, unless restrictions such as ALARA considerations prevent such testing. The applicable inspection and retest requirements necessary to assure that modifications, rework, or repairs have been accomplished correctly are included in the design change package, work order, or procedure. The inspection and retest requirements for modification, rework, and repair are based on the original inspection and test program, as well as the nature and scope of the modification or repair activity. Evaluation and review of inspection results are conducted by personnel certified Level II in ANSI/ASME N45.2.6 and SNT-TC-IA, as applicable. A planned and documented QA monitoring program is conducted by QA for quality program activities, including the inspection program and personnel qualifications. Monitoring of the implementation of the QA program by station and site contractor personnel is conducted by QA, in addition to offsite supplier activities as appropriate. Conditions adverse to quality found during the conduct of monitoring are brought to the attention of the management responsible for the activity . 17.2-32 SGS-UFSAR Revision 15 June 12, 1996 The Manager -Station Quality or his designee, routinely attends and participates in plant work schedule and status meetings to assure that they are kept abreast of day-to-day work assignments throughout the plant and that there is adequate QA coverage relative to procedural and inspection controls, acceptance criteria, and QA staffing and qualification of personnel to carry out QA assignments. 17.2.11 Test Control Q-Listed equipment and components that must be tested periodically to assure satisfactory performance, or have been replaced, modified, or repaired, are tested by qualified personnel in accordance with written procedures that provide acceptance criteria based on requirements contained in applicable design and procurement documents. Provisions are *implemented that assure that nonconformances are corrected or resolved prior to the initiation of the preoperational test program on the item. Retest requirements are provided by engineering specifications and/or the responsible engineer, or both as were the original test requirements. The Nuclear and operations departments are responsible for preparation of test procedures incorporating the engineering parameters. Test procedures prescribe, as applicable:

1. Prerequisites, including completeness of test item(s). 2. Instructions for performing the test. 3. Instrumentation and equipment for conduct of the test adequate to the test objective.
4. Suitable environmental conditions and adequate test methods. 17.2-33 SGS-UFSAR Revision 15 June 12, 1996
  • 5. Critical test sequence.
6. Acceptance criteria.

Test results, including verification of above items, are documented and reviewed for acceptability by the qualified department representative. In addition, the Nuclear Administrative Procedures Manual provides for the use of temporary changes which are controlled in accordance with Technical Specifications. Detailed instructions for implementation of temporary changes are provided. QA performs assessments of selected post-modification tests to assure compliance with the test procedure. Test results are reviewed for the following:

1. Presentation of proper documentation.
2. Assurance that tests meet objectives.
3. Identification and reporting of unacceptable results and initiation of corrective measures.

17.2.12 Control of Measuring and Test Equipment Test equipment, instrumentation, and controls used to monitor and measure activities affecting quality and personnel safety are identified, controlled, and calibrated at specific intervals by cognizant NEU personnel. Written procedures for meeting these requirements include provisions for: 1. Specifying calibration frequency.

2. Recording and maintaining calibration records. 3. Controlling and calibrating primary and secondary 17.2-34 SGS-UFSAR Revision 15 June 12, 1996
  • standards.
4. Determining methods of calibration . 5. Tracing use on Q-Listed items. Measuring and test equipment (M&TE) calibration procedures are prepared in accordance with the applicable supplier's manual requirements, unless specific exemption is approved by the cognizant station department head. M&TE, which is so exempted, is identified by use of a label or tag on the item. Prior use of measuring and test equipment found to be out of calibration is evaluated for possible effect on safety-related items. Measurements are repeated where necessary.

Secondary standards are calibrated by certified calibration laboratories and are traceable to the National Institute of Standards and Technology (NIST) , or best industry standards where no NIST standards exist. Implementing procedures will provide for documenting the basis of calibrations which are not traceable to NIST. To the extent permitted by the state of the art, the accuracy of the primary standards used to perform this calibration is at least four times greater than the accuracy of the device being calibrated. The basis of acceptance is documented and authorized, with responsibility assigned to the cognizant department head. Test equipment is marked or otherwise identified to indicate a unique identification number, the latest calibration date, and the next required calibration date. Measuring and test equipment is identified by affixing a calibration label, unless the size of the item makes this impractical. calibration identification is used for instruments and controls to indicate this status pending calibration, repair, or replacement. Calibration frequency is based on the manufacturer's recommendations. This frequency is adjusted when operating experience supports this action. 17.2-35 SGS-UFSAR Revision 15 June 12, 1996

  • ----------,_. ----------

Organizations responsible for implementing measuring and test equipment calibration controls include station, Nuclear Serviees, and the Maplewood Testing Services . 17.2.13 Handling, Storage, and Shipping The control of handling, storage, cleaning, and preservation of material and equipment covered by the QA program is specified, implemented, and accomplished by suitably trained personnel in accordance with predetermined work and inspection instructions. Implementing procedures provide for the storage of chemicals, reagents (including control of shelf life), lubricants, and other consumable materials, as required. The nuclear materials management group is responsible for control of material in storage, including preservation and shipping controls. The station departments

are responsible for system cleanliness and handling of equipment during operational maintenance or modification.

Nuclear Engineering is responsible for specifying equipment requirements. Manufacturer's instructions and recommendations, design requirements, and applicable codes and stan dards are implemented, as appropriate. Compliance with specific handling, storage, or shipping requirements is required. Require ments for new components and spares, where applicable, are included in the procurement documents. 17.2.14 Inspection, Test, and Operating Status NEU procedures are required to specify the periodic tests and inspections required for equipment covered by the QA program and to include the necessary management controls to assure that such required tests and/or inspections are completed in accordance with specified requirements. Equipment awaiting repairs, under repair, or repaired, and received materials are marked to indicate the status of inspection and test requirements and/or acceptability for use. Procedures provide for tagging valves and switches to prevent inadvertent operation. These 17.2-36 SGS-UFSAR Revision 15 June 12, 1996

  • procedures control the application and removal of tags and are designed to prevent operation of valves and/or switches that could result in personnel hazard or equipment damage . Valve and equipment status boards or logs are maintained to indicate status. 17.2.15 Nonconforming Materials, Parts, or Components Organizations involved in material receipt, installation, test, design modification, and other operating activities are responsible for identifying and documenting nonconformances.

Nonconforming materials, where practical, are segregated to prevent installation or use until proper approvals are obtained. Materials, parts, or components that have failed in service are identified and, where practical, segregated. Procedures control the application and removal of tags. Documentation of the nonconformance includes a description of the nonconformance, review by for Limiting Condition for Operation (LCO) applicability when appropriate and the disposition and inspection or retest requirements, as appropriate. The responsible Engineer dispositions each nonconformance report. Dispositions for repair or "use-as-is" are required to be reviewed and approved by QA prior to implementation. Rework or repair of nonconforming material, parts, or components is inspected or retested, or both, in accordance with specified test and inspection requirements established by the responsible engineering representative, based on applicable requirements. QA shall verify the satisfactory completion of the disposition of nonconformances. QA and other organizations in the NBU review nonconformance reports for quality problems, including adverse quality trends, and initiate reports to higher management, 17.2-37 SGS-UFSAR Revision 15 June 12, 1996

  • identifying significant quality problems with recommendations for appropriate action . 17.2.16 Corrective Action Organizations involved in activities covered by the QA program are required to implement corrective action for significant conditions adverse to quality and conditions adverse to quality identified within their scope of activity.

Such conditions are documented and controlled by the issuance of an action request. The QA Corrective Action Group reviews responses to action requests for adequacy and monitors these action requests through periodic summary and status reports to management.* Responses to action requests are based on the four elements of corrective action, which are: 1. Identification of cause of deficiency.

2. Action to correct deficiency and results achieved to date. 3. Action taken or to be taken to prevent recurrence.
4. Date when full compliance was or will be achieved.

For significant conditions adverse to qualityi! not identified by QJ'., such as LERs and NRC/INPO/CMAP findings, the QA Corrective Action Group is involved in the review of such conditions and provides oversight to assure timely followup and closeout. Items 3 and 4 are optional for conditions adverse to quality. Proper implementation of corrective action is verified through surveillance inspection assessment or audit, as appropriate. The iRWERPEffi!:i#ifstation general manager p:§jj\]j!9$%#$!p§!f\ris responsible for assuring that 17.2-38 SGS-UFSAR Revision 15 June 12, 1996 conditions adverse to quality are promptly identified and corrected for all activities involving station operation, maintenance, testing, refueling, and modification. Administrative procedures that govern station activities covered by the QA program provide for the timely discovery and correction of nonconformances. This includes receiP-t of defective material, failure or malfunction of equipment, deficiencies or deviations of equipment from design performance, and deviations from procedures. In cases of significant conditions adverse to quality, the cause of the condition is determined, and measures are established to preclude recurrence. Such events, together with corrective action taken, are documented and reported as described in Section 17.2.15. Corrective action is initiated by the responsible department head. QA closely monitors station conditions requiring corrective action. Repetitive deficiencies, procedure or process violations at the station that are not classified as operational incidents or reportable occurrences, or nonconformances under the QA program are documented by QA via the issuance of an action request. This request provides a formal administrative vehicle to alert management of conditions adverse to quality that require corrective action. 17.2 .17 Quality A.ssurance Records Records necessary to demonstrate that activities important to quality have been performed in accordance with applicable requirements are identified and maintained in accordance with Regulatory Guide 1.88, as noted in Section 17.2.2. Records shall be considered valid only when authenticated by authorized personnel. Record types, as a minimum, comply with applicable technical specification modification occurrences. SGS-UFSAR requirements and include operating procedures and related inspection 17.2-39 logs, results maintenance and and reportable Revision 14 December 29, 1995

  • -ji.i:1t}

The NBU is responsible for the permanent storage of station records. The retention period for records; permanent storage location; and methods of control, identification, and retrieval are specified by administrative procedure. Individual station department heads are responsible for submitting applicable department records to the designated location for retention. 17.2.18 Audits-Audits of PSE&G and supplier organizations that implement the QA program are performed by QA to verify compliance with the applicable portions of the program, through personnel interview, observation of activities in process, and review of applicable documents and records as required. Performance based assessment should be an integral part of the auditing program and should evaluate activities on the basis of their effect on the safe and reliable operation of the facility. An annual audit schedule is developed to identify the audits to be performed and their frequency. A dominant factor in audit schedule development is performance in the subject area. Audit schedules are revised so that weak or declining areas receive increased audit coverage and strong areas receive less consistent with the audit schedule frequency requirements of the Code of Federal Regulations and the UFSAR. Audits of the selected aspects of operational phase activities are performed with a frequency commensurate with safety significance and in a manner to assure that at least biennial (2 year) audits of safety related activities are performed. A list of operational phase activities subject to the audit program is provided in Teohnieal Speeifieationo and in Table 17.2-1. Audits are conducted by audit teams comprised of a certified lead auditor, certified auditors, and technical specialists (when deemed necessary). Audits are conducted using preestablished written procedures and checklists. Areas of deficiency revealed by audits are reviewed with management and are corrected in a timely manner. Required corrective action is documented and verified. Followup action, including reaudit of deficient areas, is performed. The audit program conducted by QA includes, but is not limited to, the following activities covered by the QA program: 1. Operation, maintenance, and modification.

2. SGS-UFSAR Preparation, review, approval, and control of design; specifications, procurement and requisition documents, instructions, procedures, and drawings.

17.2-40 Revision 15 June 12, 1996

-______ , *.. .. 3. Inspection programs.

4. Indoctrination and training.
5. Implementation of operating and test procedures.
6. Calibration of measuring and test equipment.
7. Fire protection.
8. Other applicable activities delineated in Table 17.2-1. The audit data is analyzed, and a written report of the results of each audit is distributed to appropriate management representatives of the organization(s) audited, as well as other affected management personnel.

Included in the report is a statement of QA program effectiveness. QA is audited by independent auditors at least every 2 years to verify implementation of the QA program. Reports of these audits are directed to appropriate PSE&G management personnel. 17.2-41 SGS-UFSAR Revision 15 June 12, 1996

  • TABLE 17.2-1 SALEM Q-LIST The listing below identifies those activities, services, structures, components and systems to which the Operational Quality Assurance Program applies. 1. ACTIVITIES/SERVICES

1.1 Safety

Related Activities Delineated in Regulatory Guide 1.33, App. A (See Regulatory Guide for further breakdown of activities) 1.1.1 1.1.2 1.1. 3 1.1.4 1.1. 5 1.1. 6 Administrative Procedures

a. Security Program (Regulatory Guide 1.17) b. Equipment Control (e.g., Locking and Tagging) c. Shift and Relief Turnover d. Bypass of Safety Functions and Jumper Control e. Maintenance of Minimum Shift Complement and Call-In of Personnel
f. Fire Protection Program including Inspection by Fire Consultants
g. Communication System
a. b. c. d. e. General Plant Operating Procedures Startup, Operation, and Shutdown of Safety-Related Systems Abnormal, Offnormal, or Alarm Conditions Combating Emergencies and Other Significant Events Control of Radioactivity Liquid Radioactive Waste System (including the contaminated floor and equipment drain systems) Solid Waste System PWR Gaseous Effluent System Radiation Protection including Occupational Radiation Exposure per Regulatory Guide 8.8 Area Radiation Monitoring System Operation 1 of 5 SGS-UFSAR Revision 13 June 12, 1994
  • Table 17.2-1 (Cont) f. Process Radiation Monitoring System Operation
g. h. Meteorological Monitoring and Data Collection Program Packaging and Transport of Radioactive Material per 10CFR71 i. Decontamination

1.1.7 Technical

Specification Surveillance

1.1.8 Performing

Maintenance

1.1.9 Chemical

and Radiochemical Control 1.2 Additional NRC Requirements

1.2.1 Technical

Specification Administrative Controls a. SORG Reportable Occurrences

2. EQUIPMENT, COMPONENTS, AND STRUCTURES 2.1 The following are items and systems contained in commitment letters to the NRC. 2.1.1 Accident Monitoring Instrumentation 2.1.2 AC Control Power Buses and Inverters 2.1.3 All Systems Which Penetrate Containment, up to and including the Containment Isolation Valve (Identified in UFSAR Section 6.2.4) 2.1.4 Anticipatory Reactor Trip on Turbine Trip 2 .1. 5 Auxiliary Building (including Control Room and Diesel Generator Area) 2.1.6 Auxiliary Building Ventilation System (Supply and Exhaust Units) 2.1.7 Auxiliary Feedwater Storage Tank 2.1.8 Auxiliary Feedwater System 2.1.9 Component Cooling System 2.1.10 Chill Water System 2 of 5 SGS-UFSAR Revision 9 July 22, 1989 2.1.11 a. 2.1.12 2.1.13 2.1.14 2.1.15 2.1.16 2.1.17 a. b. c. d. Table 17.2-1 (Cont) Containment (including penetrations, concrete shielding, interior structures, air locks, equipment hatch) Containment Polar Crane Containment Pressure -Vacuum Relief System Control Area Air Conditioning System Control Panels -Class lE circuits Electrical Cable Tunnels Emergency Power for Pressurizer Heaters Emergency Power Supply System DC Power Supply System Diesel Generator Area Ventilation System Diesel Generators (including associated fuel oil, lube oil, starting auxiliary systems, fuel storage and day tanks, jacket cooling, governor, voltage regulation and excitation systems, piping and valves) Control Boards and Motor Control Centers e. Control equipment, facilities and lines required for above items f. 2.1.18 2.1.19 a. b. c. SGS-UFSAR Power distribution lines to equipment required for emergency transformers and switchgear supplying Engineered Safety Features (includes 4-kV, 460-V and 230-V vital buses) Emergency Response Facilities (NUREG-0737, Supplement l; document control and verification of functionality only) Engineered Safety Features Containment Spray System (including spray pumps, spray header, spray additive tank, connecting piping and valves) Containment Ventilation System (including fan coolers, distribution ducts, dampers, HEPA filters, and moisture separators)

ECCS (including Safety Injection and RHR pumps, RWST, Accumulators, RHR heat exchangers, containment sump, sump screen vortex suppression devices, and connecting pipes and valves) 3 of 5 Revision 9 July 22, 1989 Table 17.2-1 (Cont) d. Portions of the CVCS (including Centrifugal Charging Pumps, Boron Injection Tank, connecting piping) 2.1.20 2.1.21 2. 1. 22 2.1.23 2.1.24 2.1.25 2 .1. 26 2.1.27 2.1.28 2. 1. 29 2.1.30 2 .1. 31 2.1.32 2 .1. 33 2. 1. 34 2.1.35 2.1.36 2.1.37 2.1.38 2.1.39 SGS-UFSAR Expendable and consumable items necessary for performance of critical structures, systems, (i.e., weld rod, boric acid, fuel oil, etc) Feedwater System (to outermost isolation valve) the functional and components Fire Protection System for safety-related areas (hardware) Fuel Handling Building Fuel Handling Building Ventilation System (exhaust units) Fuel Handling System Fuel Transfer Tube Hydrogen Recombiners, Hydrogen Analyzers, and Supports Instrument Air System (including accumulators, interconnecting piping and valves) for air-operated valves that perform a safety function Instrumentation and Control Systems required for safe shutdown (including safety-related instrumentation) Instrumentation for detection of inadequate core-cooling Leakage Detection System (as discussed in UFSAR Section 5.2.7) Main Steam System (to isolation valve) Meteorological Data Collection Program (hardware) Missile Barriers (protecting safety-related equipment) Nuclear Instrumentation System Plant Shielding Process Instrumentation and Controls (those portions required for Class I equipment and systems) Radiation Monitoring System (those portions required for Class I equipment and systems) Radioactive Waste Disposal Systems 4 of 5 Revision 6 February 15, 1987

a. b. 2.1.40 2.1.41 2.1.42 2. 1. 43 2.1.44 2.1.45 2. 1. 46 2.1.47 2.1.48 2. 1. 49 2 .1. 50
  • 2 .1. 51 2 .1. 52 2.2 SGS-UFSAR Table 17.2-1 (Cont) Gas Decay Systems Compressor Reactor Coolant System (including piping, valves, steam generators, pressurizer, safety and relief valves, block valves, piping to p!'essurizer relief tank, reactor coolant pumps, and supports)

Reactor (including vessel, supports, internals, fuel assemblies, RCC assemblies and drive mechanisms, supporting and positioning members, and in-core instrumentation) Reactor Protection System Residual Heat Removal System Safety Parameter Display Console (instrument calibration and verification only) Sampling System (to outermost containment isolation valve) Service Water Intake Structure Service Water System (entire system serving the nuclear portion of the plant, as shown in UFSAR Figures 9.2-lA and B) Shoreline Dike (for protection against excessive wave action) Spent Fuel Pool Cooling System Steam Generator Blowdown System (to outermost containment isolation valve) Switchgear Room Ventilation System Valve operators for all valves incorporated in this list Items Required by Regulatory Guide 1. 2 9, Classifications," Regulatory Position 3. 5 of 5 "Seismic Revision 9 July 22, 1989 Design QUALITY ASSURANCE/NUCL[AR SAFETY REVIEW Manger Corrective /\cllon & Qualily Services Ulreclor Assurance/-Nuclear S fc(y Review Manager Quality Assessment -{Mope-Greek)- Manager)l alily As e(smenl (Salem) Manager EmployH Concerns f<tS.f)C/J CE slJI(

17. z-1 lJ*, 01 A1/ACJ/*.IJ.

PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM NUCLEAR GENERATING STATION QUALITY ASSURANCE UUCLEAR SAFETY REVIEW UNITS I & 2 Updated FSAR Figure 17.2*1 Revision 15 ShMI I of I i i QUALITY, NUCLEAR TRAINING & EMERGENCY PREPAREDNESS CHIEF NUCLEAR OFFICER & PRESIDENT -NBU DIRECTOR -QUALITY, NUCLEAR TRAINING AND EMERGENCY PREPAREDNESS LEGEND: I NRB --------, I I I I I I MANAGER QUALITY ASSESSMENT PROGRAM MANAGER-NRB REPORTS TO COORDINATION TECHNICAL TRAINING/SERVICES MANAGER OPERATIONS TRAINING MANAGER MANAGER CORRECTIVE ACTION EMERGENCY PREPAREDNESS MANAGER I MANAGER EMPLOYEE CONCERNS PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM NUCLEAR GENERATING STATION QUALITY, NUCLEAR TRAINING & EMERGENCY PREPAREDNESS Updated FSAR Figure 17.2-1 Revision 15 Sheet 1 of 1}}