#REDIRECT [[LIC-15-0086, Supplement to License Amendment Request (LAR) 14-04, Request to Adopt ASME Code, Section III, 1980 Edition (No Addenda) as an Alternative to Current Code of Record]]
| number = ML15188A155
| issue date = 07/02/2015
| title = Fort Calhoun, Unit 1 - Supplement to License Amendment Request (LAR) 14-04, Request to Adopt ASME Code, Section Iii, 1980 Edition (No Addenda) as an Alternative to Current Code of Record (TAC No. MF4160)
| author name = Cortopassi L P
| author affiliation = Omaha Public Power District
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000285
| license number = DPR-040
| contact person =
| case reference number = LIC-15-0086, TAC MF4160
| document type = Code Relief or Alternative, Letter
| page count = 9
| project = TAC:MF4160
| stage = Other
}}
 
=Text=
{{#Wiki_filter:Employment with Equal Opportunity  444 South 16th Street Mall Omaha, NE  68102-2247 LIC-15-0086 July 2, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC  20555-0001 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 
 
==Subject:==
Supplement to License Amendment Request (LAR) 14-04, Request to Adopt ASME Code, Section Ill, 1980 Edition (No Addenda) as an Alternative to Current Code of Record (TAC No. MF4160) 
 
==References:==
See Page 3  This letter is providing a revision to Appendix F, Table F-1 of the Fort Calhoun Station, Unit No. 1, Updated Safety Analysis Report (USAR) as submitted by Reference 1 and revised in References 3 and 5. The Omaha Public Power District (OPPD) discussed this issue with NRC staff during a teleconference on June 17, 2015. OPPD has revised Appendix F, Table F-1 by deleting (i.e., striking out) the reference to footnote (d) from Load Combination 2 because the application of footnote (d) could be interpreted incorrectly. As currently written, the application of footnote (d) to Load Combination 2 could be construed to indicate that fluid transient loadings only need to be applied to the pressurizer relief valve piping and supports, which is incorrect. Fluid transient loadings should be applied to all piping for which a fluid transient is applicable. Also, OPPD had proposed to reference footnote (d) in Service Level C of the new Load Combination table proposed for new footnote (e). However, that reference to footnote (d) has been removed to clarify that fluid transients must be considered, where applicable, as noted above. OPPD's Corrective Action Program will resolve the remaining references to footnote (d) in Appendix F, Table F-1.
 
Markup and re-typed (i.e. clean) USAR, Appendix F pages are attached. Please note that this change to USAR, Appendix F does not affect the proposed changes to USAR Section 1.2 or USAR Appendix G as provided in Reference 1.
 
U. S. Nuclear Regulatory Commission LIC-15-0086 Page 3 
 
==References:==
1. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "License Amendment Request (LAR) 14-04, Revise Current Licensing Basis to Adopt American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code, Section III, 1980 Edition, (no Addenda) as an Alternative to Current Code of Record," dated May 16, 2014 (LIC-14-0043) (ML14143A370) 2. Letter from NRC (C. F. Lyon) to OPPD (L. P. Cortopassi), "Fort Calhoun Station, Unit No.1- Request for Additional Information RE: License Amendment Request to Adopt ASME Code, Section Ill, 1980 Edition (no Addenda) as an Alternative to Current Code of Record (TAC No. MF4160)," dated September 24, 2014 (NRC-14-0110) (ML14259A365)  3. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "OPPD Response to NRC Request for Additional Information Regarding License Amendment Request (LAR) 14-04, Request to Adopt ASME Code, Section Ill, 1980 Edition (no Addenda) as an Alternative to Current Code of Record (TAC No. MF4160)," dated January 9, 2015 (LIC-15-0002) (ML15009A319)  4. Letter from NRC (C. F. Lyon) to OPPD (L. P. Cortopassi), "Fort Calhoun Station, Unit No. 1 - Request for Additional Information Round 2 RE: License Amendment Request to Adopt ASME Code, Section Ill, 1980 Edition (no Addenda) as an Alternative to Current Code of Record (TAC No. MF4160)," dated February 25, 2015 (NRC-15-005) (ML15043A061)  5. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "OPPD Response to Second Round NRC Request for Additional Information Regarding License Amendment Request (LAR) 14-04, Request to Adopt ASME Code, Section Ill, 1980 Edition (no Addenda) as an Alternative to Current Code of Record (TAC No. MF4160)," dated March 27, 2015 (LIC-15-0043) (ML15086A545) 
 
LIC-15-0086 Attachment 1 Page 1 USAR Markup Pages USAR-Appendix F Information Use Page 9 of 40 Classification of Structures and  Rev. 10 Equipment and Seismic Criteria Table F  Loading Combinations and Primary Stress Limits                                                                                          Primary Stress Limits Loading Combinations    Vessels    Piping (e)    Supports (f) 
: 1. Design Loading +  PM < SM    PM < 1.2Sh    Working Design Earthquake            Stress PB + PL < 1.5SM  PB + PM < 1.2Sh  Anchor Bolts F.S.>4.0 (d)                                                                                                                                                                                                   
: 2. Normal Operating    PM < SD    PM < SD    Within Loadings + (Maximum                                                            Yield Hypothetical Earthquake            Anchor Bolts + (Fluid Transient              F.S.> 2.0 (d) Loadings(d)) (g))    (b)            (c)                                                                                                                                                                                                     
: 3. Normal Operating    PM < SL    PM < SL  Deflection of supports Loadings + (Pipe                                                            limited to  Rupture + Maximum      maintain supported Hypothetical Earthquake(g))          equipment within        (b)    (a), (c)        limits shown USAR-Appendix F Information Use Page 10 of 40 Classification of Structures and  Rev. 10 Equipment and Seismic Criteria Table F  Loading Combinations and Primary Stress Limits (Continued)  NOTES:  (a) These stress criteria are not applied to a piping run within which a pipe break is considered to have occurred.   
(b) Loading combinations 2 and 3, stress limits for vessels, are also used in evaluating the effects of local loads imposed on vessels and/or piping, with the symbol PM changed to PL. 
(c) The tabulated limits for piping are based on a minimum "shape factor". These limits are modified to incorporate the shape factor of the particular piping being analyzed. 
(d) These load cases and limits apply only to the Pressurizer relief valve piping and supports.
 
(e) As an alternative to USAS B31.7, 1968, Class 1, 2, and 3, non-reactor coolant loop piping analysis may also be performed in accordance with ASME III, 1980 Edition (no Addenda). Material properties shall be from the original code of record (i.e., USAS B31.7, 1968). Associated stress limits shall be in accordance with ASME III, 1980 Edition (no Addenda) for Service Levels as shown below:  Load Combination Service Level A: Design Loading (Pressure, Weight, Other Mechanical Loadings, and Thermal where applicable) Service Level B: Design Loading + Design Earthquake Service Level C: Normal Operating Loadings + (Maximum Hypothetical Earthquake + (Fluid Transient Loading) (g)) Service Level D: Normal Operating Loadings + (Maximum Hypothetical Earthquake + Pipe Rupture (g)) 
(f) Support analysis will continue to be performed in accordance with the existing licensing basis (i.e., Seventh Edition, AISC, American Institute of Steel Construction). (g) Square-Root-Sum-of-the-Squares may be used to combine loads.
LIC-15-0086 Attachment 2 Page 1 USAR Clean Pages USAR-Appendix F Information Use Page 9 of 40 Classification of Structures and  Rev. 10 Equipment and Seismic Criteria Table F  Loading Combinations and Primary Stress Limits                                                                                          Primary Stress Limits Loading Combinations    Vessels    Piping (e)    Supports (f) 
: 1. Design Loading +  PM < SM    PM < 1.2Sh    Working  Design Earthquake            Stress PB + PL < 1.5SM  PB + PM < 1.2Sh  Anchor Bolts F.S.>4.0 (d)                                                                                                                                                                                                   
: 2. Normal Operating    PM < SD    PM < SD    Within  Loadings + (Maximum                                                            Yield Hypothetical Earthquake            Anchor Bolts + (Fluid Transient              F.S.> 2.0 (d) Loadings)(g))    (b)            (c)                                                                                                                                                                                                     
: 3. Normal Operating    PM < SL    PM < SL  Deflection of supports Loadings + (Pipe                                                            limited to  Rupture + Maximum      maintain supported Hypothetical Earthquake(g))          equipment within        (b)    (a), (c)        limits shown USAR-Appendix F Information Use Page 10 of 40 Classification of Structures and  Rev. 10 Equipment and Seismic Criteria Table F  Loading Combinations and Primary Stress Limits (Continued)  NOTES:  (a) These stress criteria are not applied to a piping run within which a pipe break is considered to have occurred.   
(b) Loading combinations 2 and 3, stress limits for vessels, are also used in evaluating the effects of local loads imposed on vessels and/or piping, with the symbol PM changed to PL. 
(c) The tabulated limits for piping are based on a minimum "shape factor". These limits are modified to incorporate the shape factor of the particular piping being analyzed.   
(d) These load cases and limits apply only to the Pressurizer relief valve piping and supports.
 
(e) As an alternative to USAS B31.7, 1968, Class 1, 2, and 3, non-reactor coolant loop piping analysis may also be performed in accordance with ASME III, 1980 Edition (no Addenda). Material properties shall be from the original code of record (i.e., USAS B31.7, 1968). Associated stress limits shall be in accordance with ASME III, 1980 Edition (no Addenda) for Service Levels as shown below:  Load Combination Service Level A: Design Loading (Pressure, Weight, Other Mechanical Loadings, and Thermal where applicable) Service Level B: Design Loading + Design Earthquake Service Level C: Normal Operating Loadings + (Maximum Hypothetical Earthquake + (Fluid Transient Loading) (g)) Service Level D: Normal Operating Loadings + (Maximum Hypothetical Earthquake + Pipe Rupture (g))  (f) Support analysis will continue to be performed in accordance with the existing licensing basis (i.e., Seventh Edition, AISC, American Institute of Steel Construction). (g) Square-Root-Sum-of-the-Squares may be used to combine loads. 
}}