{{Adams
#REDIRECT [[DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report]]
| number = ML15309A764
| issue date = 11/05/2015
| title = Diablo Canyon, Units 1, 2 and ISFSI - Submits 2014 Annual Commitment Change Summary Report
| author name = Welsch J M
| author affiliation = Pacific Gas & Electric Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NMSS, NRC/NRR
| docket = 05000275, 05000323, 07200026
| license number = DPR-080, DPR-082, SNM-2511
| contact person =
| case reference number = DCL-15-134, DIL-15-023
| document type = Letter, Report, Technical
| page count = 1
}}
 
=Text=
{{#Wiki_filter:Pacific Gas and Electric Company November 5, 2015 PG&E Letter DCL-15-134 PG&E Letter DIL-15-023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Materials License No. SNM-2511, Docket No. 72-26 James M. Welsch Site Vice President Diablo Canyon Independent Spent Fuel Storage Installation 2014 Annual Commitment Change Summary Report  
 
==Dear Commissioners and Staff:==
Diablo Canyon Power Plant Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 805.545.3242 Internal: 691.3242 Fax: 805.545.4884 In accordance with Nuclear Energy Institute (NEI) 99-04, "Guidelines for Managing NRC Commitment Changes," Revision 0, endorsed by the U.S. Nuclear Regulatory Commission (NRC) in SECY-00-0045, "Acceptance Of NEI 99-04, 'Guidelines for Managing NRC Commitments,"' Pacific Gas and Electric Company (PG&E) is submitting this letter regarding Regulatory Commitment Changes for Diablo Canyon Power Plant, Units 1 and 2 and the Independent Spent Fuel Storage Installation. During the period of January 1, 2014; through December 31, 2014, there were no regulatory commitment changes considered by NEI 99-04 to require notification. Commitment changes that are contained in 10 CFR 50.59 evaluation summary reports, or in other submittals previously transmitted to the NRC, are not provided as part of this report. PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. If you have any questions or require additional information, please contact Mr. Hossain Hamzehee at (805) 545-4720. Sincerely, -Welsch BNSM/4540/641 07 481 cc: Marc L. Dapas, NRC Region IV Administrator Thomas R. Hipschman, NRC Senior Resident Inspector Siva P. Lingam, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek Pacific Gas and Electric Company November 5, 2015 PG&E Letter DCL-15-134 PG&E Letter DIL-15-023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Materials License No. SNM-2511, Docket No. 72-26 James M. Welsch Site Vice President Diablo Canyon Independent Spent Fuel Storage Installation 2014 Annual Commitment Change Summary Report
 
==Dear Commissioners and Staff:==
Diablo Canyon Power Plant Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 805.545.3242 Internal: 691.3242 Fax: 805.545.4884 In accordance with Nuclear Energy Institute (NEI) 99-04, "Guidelines for Managing NRC Commitment Changes," Revision 0, endorsed by the U.S. Nuclear Regulatory Commission (NRC) in SECY-00-0045, "Acceptance Of NEI 99-04, 'Guidelines for Managing NRC Commitments,"' Pacific Gas and Electric Company (PG&E) is submitting this letter regarding Regulatory Commitment Changes for Diablo Canyon Power Plant, Units 1 and 2 and the Independent Spent Fuel Storage Installation. During the period of January 1, 2014; through December 31, 2014, there were no regulatory commitment changes considered by NEI 99-04 to require notification. Commitment changes that are contained in 10 CFR 50.59 evaluation summary reports, or in other submittals previously transmitted to the NRC, are not provided as part of this report. PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. If you have any questions or require additional information, please contact Mr. Hossain Hamzehee at (805) 545-4720. Sincerely, -Welsch BNSM/4540/641 07 481 cc: Marc L. Dapas, NRC Region IV Administrator Thomas R. Hipschman, NRC Senior Resident Inspector Siva P. Lingam, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
* Diablo Canyon
* Palo Verde