IR 05000395/2011301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML111430858
| number = ML18057B537
| issue date = 05/23/2011
| issue date = 02/26/2018
| title = Virgil C. Summer Nuclear Station - Notification of Licensed Operator Initial Examination 05000395-11-301
| title = VC Summer 05000395/2011301 Exam Administrative Items 2D
| author name = Franke M E
| author name =  
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II
| addressee name = Gatlin T D
| addressee name =  
| addressee affiliation = South Carolina Electric & Gas Co
| addressee affiliation = South Carolina Electric & Gas Co
| docket = 05000395
| docket = 05000395
| license number = NPF-012
| license number =  
| contact person =  
| contact person =  
| document report number = IR-11-301
| case reference number = 50-395/11-301
| document type = Letter
| document report number = 50-395/OL-11
| page count = 5
| document type = License-Operator, Part 55 Examination Related Material
| page count = 24
}}
}}


Line 19: Line 20:
=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:
[[Issue date::May 23, 2011]]
Mr. Thomas Vice President - Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065
SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000395/2011301
==Dear Mr. Gatlin:==
In a meeting on May 11, 2011, between Mr. Robert N. Johnston, Operations Initial Training Supervisor, and Mr. Richard S. Baldwin, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at Virgil C. Summer Nuclear Plant. The operating test is scheduled to be administered during the weeks of September 12, 2011, and September 19, 2011. The written examination is scheduled to be administered the week of September 26, 2011. The on-site preparatory week is scheduled for the week of August 22, 2011. As agreed during the meeting, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, your staff initially furnished the operating test outline to the NRC on September 13, 2010, and will update this material on June 28, 2011. Mr. Caballero provided a written examination outline to your staff in February 2009. The operating test, written examination, and the supporting reference materials identified in Attachment 3, to ES-201, will be due by August 1, 2011. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials may cause the examinations to be rescheduled.
SCE&G 2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E, of NUREG-1021, contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any), at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
SCE&G 3 Thank you for your cooperation in this matter. Mr. Johnston has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).
Sincerely,/RA/ Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-395 License No.: NPF-12
cc: (See page 4)
ML111430858 X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII: DRS RII: DRS RII: DRP SIGNATURE R A R A R A NAME R. BALDWIN M. FRANKE G. MCCOY DATE 05-12/2011 05/12/2011 05/13/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO SCE&G 4 cc w/encl: Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532
J. B. Archie Senior Vice President Nuclear Operations South Carolina Electric & Gas Company Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution Kathryn M. Sutton, Esq. Morgan, Lewis & Bockius LLP Electronic Mail Distribution Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution Mark Yeager Division of Radioactive Waste Mgmt. S.C. Department of Health and Environmental Control Electronic Mail Distribution
Andy T. Barbee, Director Nuclear Training South Carolina Electric & Gas Company Electronic Mail Distribution Bruce L. Thompson, Manager Nuclear Licensing (Mail Code 830)
South Carolina Electric & Gas Company Electronic Mail Distribution Robert M. Fowlkes General Manager Engineering Services South Carolina Electric & Gas Company Electronic Mail Distribution
Senior Resident Inspector Virgil C. Summer Nuclear Station U.S. NRC 576 Stairway Road Jenkinsville, SC 29065 R. J. White, Nuclear Coordinator S.C. Public Service Authority Mail Code 802 Electronic Mail Distribution Robin R. Haselden, General Manager Organizational Development & Effectiveness South Carolina Electric & Gas Company Electronic Mail Distribution
George A. Lippard, III., General Manager Nuclear Plant Operations South Carolina Electric & Gas Company Electronic Mail Distribution
Moses Coleman Manager, Health Physics and Safety South Carolina Electric & Gas Company Electronic Mail Distribution
Robert L. Justice, Manager Nuclear Operations South Carolina Electric & Gas Company Electronic Mail Distribution
Donald D. Shue, Manager Maintenance Services South Carolina Electric & Gas Company Electronic Mail Distribution South Carolina Electric & Gas Company ATTN: Mr. Leldon A. Blue, Training Manager Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065
}}
}}

Revision as of 18:14, 21 September 2018

VC Summer 05000395/2011301 Exam Administrative Items 2D
ML18057B537
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/26/2018
From:
NRC/RGN-II
To:
South Carolina Electric & Gas Co
References
50-395/11-301 50-395/OL-11
Download: ML18057B537 (24)


Text