ZS-2012-0098, Fitness for Duty Performance Data Report - Annual 2011

From kanterella
Jump to navigation Jump to search
Fitness for Duty Performance Data Report - Annual 2011
ML12062A150
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 02/29/2012
From: Thurman P
ZionSolutions
To:
NRC/FSME, Office of Nuclear Reactor Regulation, Document Control Desk
References
ZS-2012-0098
Download: ML12062A150 (6)


Text

~ -4t

~-.

===============ZIONSOLUTIONSL;;;Lc=================

10 CFR 50.75(£)(1)

February 29,2012 u.s. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 An EnergySoIutions Company Zion Nuclear Power Station, Units 1 and 2

Subject:

Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304 Fitness for Duty Performance Data Report - Annual 2011 ZS-2012-0098 In accordance with 10 CFR 26.717(e), "Fitness-For-Duty Program Performance Data," and 10 CFR 26.203(e) "General Provisions," ZionSolutions LLC (ZS) is providing the compiled Fitness-For-Duty Program Performance Data for the Zion Nuclear Power Stations and the corporate support employees within the scope of the rule for the period January 1,2011 through December 31, 2011.

There are no regulatory commitments contained in this letter.

If you have any questions regarding this submittal, please contact me at (224) 789-4041.

Respectfully, 0-/?-----.

B trick S. Thurman, Esq.

ice President Regulatory Affairs

'cc: John Hickman, U.S. NRC Senior Project Manager Service List

Attachment:

Fitness for Duty Performance Data - Personnel Subject to 10 CFR 26 101 Shiloh Boulevard, Zion* IL 60099 (224) 789-4016* Fax: (224) 789-4008

  • www.zionsolutionscompany.com

Zion Nuclear Power Station, Unit 1 and 2 License Transfer Service List cc:

Mr. Patrick T. Daly Senior VP and General Manager ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099 Patrick Thurman, Esq.

VP Regulatory Affairs, Licensing and Document Control ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099 Gary Bouchard VP Engineering, Ops & Nuclear Security and Decommissioning Plant Manager 101 Shiloh Boulevard Zion, IL 60099 John Hess Executive VP and General Manager Commercial Services 1009 Commerce Park Drive, Ste. 100 Oak Ridge, TN 37830 Thomas Magette Senior VP Nuclear Regulatory Strategy 6350 Stevens Forest Road, Ste. 2000 Columbia, MD 21046 Russ Workman Deputy General Counsel Energy Solutions 423 West 300 South, Ste. 200 Salt Lake City, UT 84101 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704 Mr. Kent McKenzie Emergency Management Coordinator Lake County Emergency Management Agency 1303 N. Milwaukee Avenue Libertyville, IL 60048-1308 Regional Administrator U.S. NRC, Region III 2443 Warrenville Road Lisle, IL 60532-4352 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004

ATTACHMENT 2011 Fitness-For-Duty Perfonnance Data - Personnel Subject to 10 CFR 26

Random Testing Rate ZionSolutions LLC (ZS) maintains separate testing pools for employees and contractors. For the period of January 1 through December 31, 2011, the company wide random testing rate for employees was greater than 50%.

Work Hours Control Waivers - Summary of Corrective Actions ZS issued no waivers.

Additional Information As shown on the attached schedule for ZionSolutions LLC's Fitness for Duty Program, the work force has been divided into three groups: Licensee Employees, Long-Term Contractor Personnel and Short-Term Contractor Personnel. For the reporting period in 2011, of the 243 tests conducted (101 pre-access, 5 for-cause post accident, 130 random and 7 follow-up) for Licensee Employees, there were 2 positive results. There were no Long-Term Contractor Personnel tested since none of these personnel had unescorted access. There were 444 tests conducted for the Short-Term Contractor Personnel (277 pre-access, 2 for-cause post accident, 1 for-cause observed behavior, 148 random and 16 follow-up) with 3 positive results.

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 Zion Solutions Company ZION NUCLEAR POWER STATION Location Eileen Moore Contact Name Cutoffs: Screen/Confirmation (ng/ml)

Marijuana 50/15 Amphetamine Cocaine 300/150 Phencyclidine 1000/500 25/25 Opiates 2000/2000 Alcohol (%BAC) 0.04%

12131/2011 12 Month Ending (224)789-4036 Phone N/A N/A N/A N/A N/A N/A Testing Results Licensee Long-Term Short-Term Employees Contractor Contractor Personnel Personnel Average Number with 170 0

209 Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 100 1

0 0

275 3

Pre-Access 0

Random 1

0 0

2 0

For-Cause Post Accident 5

0 0

0 2

0 For-Cause Observed Behavior 0

0 0

0 1

0 Random 130 1

0 0

148 0

Follow-Up 7

0 0

0 16 0

Other 0

0 0

0 0

0 Total 243 2

0 0

444 3

BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine 50 I 100 Opiates Amphetamine~ Phencyclidene Alcohol Creatinine Nitrites pH Licensee Employees 1

0 1

0 0

0 0

1 0

0 Long-Term Contractors 0

0 0

0 0

0 0

0 0

0 Short-Term Contractors 2

0 1

0 0

0 0

0 0

0 Total 3

0 2

0 0

0 0

1 0

0 Refusal 3X Adulterated Substituted To Test Dilute Specimen Specimen Licensee Employees 0

0 0

0 Long-Term Contractors 0

0 0

0 Short-Term Contractors 0

0 0

0 Total 0

0 0

0 Total Confirmed Positive Tests For All Specific Substances, Refusals, Dilutes, Substituted and Adulterated Specimens:

5