|
---|
Category:Letter type:W
MONTHYEARW3F1-2024-0049, Notification of Readiness for Supplemental Inspection2024-10-21021 October 2024 Notification of Readiness for Supplemental Inspection W3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2024-0038, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0039, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0041, Reply to a Notice of Violation, EA-24-0522024-09-19019 September 2024 Reply to a Notice of Violation, EA-24-052 W3F1-2024-0040, Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days2024-09-0303 September 2024 Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 252024-07-22022 July 2024 (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0032, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-07-17017 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation W3F1-2024-0024, Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days2024-06-17017 June 2024 Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program W3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 252024-05-0101 May 2024 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0014, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20242024-04-29029 April 2024 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2024 W3F1-2024-0015, Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure2024-04-24024 April 2024 Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure W3F1-2024-0016, Annual Radiological Environmental Operating Report (AREOR) - 20232024-04-24024 April 2024 Annual Radiological Environmental Operating Report (AREOR) - 2023 W3F1-2024-0017, Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.22062024-04-23023 April 2024 Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.2206 W3F1-2024-0020, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20232024-04-11011 April 2024 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023 W3F1-2024-0008, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0009, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0012, Response to NRC Integrated Inspection Report 05000382/20230042024-03-11011 March 2024 Response to NRC Integrated Inspection Report 05000382/2023004 W3F1-2024-0006, Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days2024-02-28028 February 2024 Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0056, Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal2023-09-28028 September 2023 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-09-25025 September 2023 Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-05-0404 May 2023 Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 20222023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) 2022 W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 20222023-04-27027 April 2023 Submittal of Annual Radiological Environmental Operating Report - 2022 W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.22062023-04-11011 April 2023 Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-022023-03-30030 March 2023 Updated Final Supplemental Response to NRC Generic Letter 2004-02 W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use2023-03-22022 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days2023-03-17017 March 2023 Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use2023-03-0303 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2023-0013, Notification of Readiness for Supplemental Inspection2023-02-15015 February 2023 Notification of Readiness for Supplemental Inspection W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use2023-02-0606 February 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days2023-01-25025 January 2023 Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days2023-01-0505 January 2023 SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue – 191 and Generic Letter 2004-022022-12-20020 December 2022 Commitment Change Notification for Generic Safety Issue – 191 and Generic Letter 2004-02 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 372022-10-27027 October 2022 Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0037, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-07-0606 July 2022 SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. W3F1-2022-0026, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20222022-04-28028 April 2022 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 2024-09-03
[Table view] Category:License-Monthly Operating Report
MONTHYEARW3F1-2005-0059, June 2005 Monthly Operating Report for Water Ford Steam Electric Station Unit 3 Revised2005-09-19019 September 2005 June 2005 Monthly Operating Report for Water Ford Steam Electric Station Unit 3 Revised ML0519903462005-07-13013 July 2005 June 2005 Monthly Operating Report, Waterford Steam Electric Station, Unit 3 ML0516001392005-06-0606 June 2005 May 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2005-0035, April 2005 Monthly Operating Report for Waterford, Unit 32005-05-0909 May 2005 April 2005 Monthly Operating Report for Waterford, Unit 3 W3F1-2005-0023, March 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 32005-04-0606 April 2005 March 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2005-0016, February 2005 Monthly Operating Report for Waterford Unit 32005-03-0909 March 2005 February 2005 Monthly Operating Report for Waterford Unit 3 W3F1-2005-0008, January 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 32005-02-14014 February 2005 January 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 3 ML0501302112005-01-10010 January 2005 December 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2004-0124, November 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 32004-12-0606 December 2004 November 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2004-0112, October 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 (Waterford 3)2004-11-10010 November 2004 October 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 (Waterford 3) W3F1-2004-0093, September 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 32004-10-0606 October 2004 September 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2004-0083, August 2004 Monthly Operating Report for Waterford Unit 32004-09-23023 September 2004 August 2004 Monthly Operating Report for Waterford Unit 3 W3F1-2004-0079, June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 32004-08-31031 August 2004 June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2004-0067, July 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 (Waterford 3)2004-08-0505 August 2004 July 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 (Waterford 3) W3F1-2004-0057, June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 32004-07-12012 July 2004 June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2004-0039, April 2004 Monthly Operating Report for Waterford, Unit 32004-05-11011 May 2004 April 2004 Monthly Operating Report for Waterford, Unit 3 W3F1-2004-0032, February 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 32004-04-0606 April 2004 February 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2004-0020, February 2004 Monthly Operating Report for Waterford Unit 32004-03-15015 March 2004 February 2004 Monthly Operating Report for Waterford Unit 3 W3F1-2004-0011, January 2004 Monthly Operating Report for Waterford, Unit 32004-02-0505 February 2004 January 2004 Monthly Operating Report for Waterford, Unit 3 W3F1-2004-0001, December 2003 Monthly Operating Report for Waterford Unit 32004-01-12012 January 2004 December 2003 Monthly Operating Report for Waterford Unit 3 W3F1-2003-0101, November 2003 Monthly Operating Report for Waterford Unit 32003-12-0808 December 2003 November 2003 Monthly Operating Report for Waterford Unit 3 W3F1-2003-0088, October 2003 Monthly Operating Report for Waterford Steam Electric Station, Unit 32003-11-11011 November 2003 October 2003 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 W3F1-2003-0081, September 2003 Monthly Operating Report for Waterford Unit 32003-10-0707 October 2003 September 2003 Monthly Operating Report for Waterford Unit 3 W3F1-2003-0072, August 2003 Monthly Operating Report for Waterford Steam Electric Station Unit 32003-09-0909 September 2003 August 2003 Monthly Operating Report for Waterford Steam Electric Station Unit 3 W3F1-2003-0064, July 2003 Monthly Operating Report for Waterford 3 Ses2003-08-11011 August 2003 July 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0051, June 2003 Monthly Operating Report for Waterford 3 Ses2003-07-0909 July 2003 June 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0046, May 2003 Monthly Operating Report for Waterford 32003-06-0606 June 2003 May 2003 Monthly Operating Report for Waterford 3 W3F1-2003-0040, April 2003 Monthly Operating Report for Waterford 3 Ses2003-05-0808 May 2003 April 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0023, March 2003 Monthly Operating Report for Waterford 32003-04-0808 April 2003 March 2003 Monthly Operating Report for Waterford 3 ML0307704452003-03-12012 March 2003 February 2003 Monthly Operating Report for Waterford 3 W3F1-2003-0012, January 2003 Monthly Operating Report for Waterford 3 Ses2003-02-13013 February 2003 January 2003 Monthly Operating Report for Waterford 3 Ses W3F1-2003-0001, December 2002 Monthly Operating Report for Waterford 32003-01-13013 January 2003 December 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0105, November 2002 Monthly Operating Report for Waterford 32002-12-0606 December 2002 November 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0098, October 2002 Monthly Operating Report for Waterford 32002-11-12012 November 2002 October 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0094, September 2002 Monthly Operating Report for Waterford 32002-10-10010 October 2002 September 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0088, August 2002 Monthly Operating Report for Waterford 32002-09-10010 September 2002 August 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0077, July 2002 Monthly Operating Report for Waterford 3 Ses2002-08-0808 August 2002 July 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0067, June 2002 Monthly Operating Report for Waterford 32002-07-10010 July 2002 June 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0061, May 2002 Monthly Operating Report for Waterford 32002-06-10010 June 2002 May 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0054, April 2002 Monthly Operating Report for Waterford 32002-05-0808 May 2002 April 2002 Monthly Operating Report for Waterford 3 W3F1-2002-0036, March 2002 Monthly Operating Report for Waterford 3 Ses2002-04-10010 April 2002 March 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0029, February 2002 Monthly Operating Report for Waterford 3 Ses2002-03-12012 March 2002 February 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0017, January 2002 Monthly Operating Report for Waterford 3 Ses2002-02-14014 February 2002 January 2002 Monthly Operating Report for Waterford 3 Ses W3F1-2002-0003, December 2001 Monthly Operating Report for Waterford 3 Ses2002-01-14014 January 2002 December 2001 Monthly Operating Report for Waterford 3 Ses 2005-09-19
[Table view] |
Text
Entergy Operations, Inc.
I NEn tergy 17265 River Road Killona, LA 70066 Tel 504 739 6650 W3F11-2003-0072 September 9, 2003 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Monthly Operating Report Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
Attached is the subject report which covers the operating statistics for the month of August, 2003. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
Sincerely, G. Sen Licensing Manager GSITMM/cbh Attachment(s)
')' --
11 C3
W3F1 -2003-0072 Page 2 September 9, 2003 cc: Mr. Thomas P. Gwynn Acting Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford NPS P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop 0-7 D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502 Platts Energy ATTN: B. Lewis 1200 G. St., N.W. Suite 1000 Washington, DC 20005 lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office
NRC MONTHLY OPERATING REPORT WATERFORD 3 for August, 2003
SUMMARY
OF OPERATIONS The unit operated at an average reactor power level of 99.9% during the period.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.
9N2003 Pap: I of s
OPERATING DATA REPORT DOCKET NUMBER: 50-382
,UNIT NAME: WATERFORD 3 DATE OF REPORT: September 3, 2003 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 OPERATING STATUS
- 1. Reporting Period August, 2003 Gross Hours in Reporting Period l 744
- 2. Currently Authorized Power Level (MWt) 3,441 Maximum Dependable Capacity (Net MWe) 1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe) NIA
- 4. Reason for Restriction (if any) NlA THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 744.0 5,786.1 136,035.3
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 744.0 5,733.3 134,695.8
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,558,749 19,704,147 449,438,098
- 10. Gross Electrical Energy Generated (MWH) 846,623 6,569,236 160,599,347
- 11. Net Electrical Energy Generated (MWH) 809,434 6,296,136 143,876,370
- 12. Reactor Service Factor 100.0 99.2 86.6
- 13. Reactor Availability Factor 100.0 99.2 86.5
- 14. Unit Service Factor 100.0 98.3 85.7
- 15. Unit Availability Factor 100.0 98.3 85.7
- 16. Unit Capacity Factor (using MDC) 101.2 100A 85.1
- 17. Unit Capacity Factor (using DER) 98.5 97.8 82.9
- 18. Unit Forced Outage Rate 0.0 1.7 3.6 9/B2OD3 Page: 2 of 5
- w OPERATING DATA REPORT DOCKET NUMBER: 50-382
- UNIT NAME: WATERFORD 3 DATE OF REPORT: September 3, 2003 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
REFUEL OUTAGE #12 - commencing on October 19, 2003 - 25 day outage
- 20. If Shutdown at end of report period, estimated date of startup: NIA
- 21. Unit is in Commercial Oreration.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 744 5,831 157,224
- 23. Unit Forced Outage Hours 0.0 97.7 4,995.6
- 24. Nameplate Rating (Gross MWe) : 1,200 Max. Dependable Capacity (Gross MWe) : 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:
NIA 4t&20a Page: I of 5
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: September 3, 2003 COMPLETED BY: Jim Pollock I TELEPHONE: (504) 739-6561 Reporting Period: August, 2003 (NET MWe)
DAY Avg. Power Level DAY Avg. Power Level 1 1,088 16 1,091 I-~~~~~~~~~~~
2 1,089 17 1,090 3 1,088 18 1,091 4 1,089 19 1,090 5 1,088 20 1,087 6 1,089 21 1,087 7 1,088 22 1,087 8 1,090 23 1,087 9 1,093 24 1,085 10 1,092 25 1,085 11 1,090 26 1,085 12 1,090 27 1,083 13 1,091 28 1,082 14 1,093 29 1,082 15 1,090 30 1,083 31 1,083 INSTRUCTIONS:
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
9ALIM03 Page: 4 of 5
.t -
- UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF -REPORT: September 3, 2003 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 REPORTING PERIOD: August, 2003 Outage Date Duration : ** Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NA A*
TYPE REASC )N F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License-Examination 1 Manual F - Administrative 2 Manual Scram G - Operational Error (explain) 3 Automatic Scram H - Other (explain) 4 Continuation from Previous Periocd 5 Power Reduction 6 Other (explain) 91S1203 Page: 5 of 5