January 2002 Monthly Operating Report for Waterford 3 Ses
ML020640375
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/14/2002
From: Brandon M
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2002-0017
Download: ML020640375 (5)


Text

Entergy Operations, Inc.

17265 River Road tergyTel Killona, LA 70066 504 739 6650 W3F 1-2002-0017 A4.05 PR February 14, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject report which covers the operating statistics for the month of January, 2002. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Due to minor errors in the spreadsheets used in 2001 for calculating Gross Thermal Energy Generated (MWHt), the values reported in the December 2001 Monthly Operating Report were slightly higher than the actuals. This error resulted in the Gross Thermal Energy Generated values reported in the December 2001 Monthly Operating Report being approximately 0.01 % higher than the actuals. The corrected Year To Date value (actual) is 29,441,069 MWHt vice the reported 29,444,278 MWHt, and the corrected Cummulative value (actual) is 402,097,036 MWHt vice the reported 402,100,245 MWHt. Data reported prior to 2001 are not impacted.

Monthly Operating Report W3F 1-2002-0017 Page 2 February 14, 2002 There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.

Very truly yours, M.K. Brandon Manager, Licensing MKB/TMM/cbh Attachment cc: E.W. Merschoff (NRC Region IV),

N. Kalyanam (NRC-NRR),

J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),

lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for January, 2002 The unit operated at an average reactor power level of 99.8% and experienced no shutdowns or significant power reductions during the period.

2/5/02 Page : 1 of 6

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for January, 2002 There were no pressurizer safety valve failures or challenges experienced during the month.

2/5/02 Page : 2 of 6

OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: February 5, 2002 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 OPERATING STATUS

1. Reporting Period January, 2002 Gross Hours in Reporting Period 744
2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) : 1,075 Design Electrical Rating (Net MWe) 1,104
3. Power Level to which Restricted (if any) (Net MWe) N/A
4. Reason for Restriction (if any) N/A THIS YEAR TO MONTH DATE CUMULATIVE
5. Number of Hours Reactor was Critical 744.0 744.0 122,827.4
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 744.0 744.0 121,568.7
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,518,017 2,518,017 404,615,053
10. Gross Electrical Energy Generated (MWH) 855,135 855,135 135,650,952
11. Net Electrical Energy Generated (MWH) 821,080 821,080 129,553,386
12. Reactor Service Factor 100.0 100.0 85.7
13. Reactor Availability Factor 100.0 100.0 85.7
14. Unit Service Factor 100.0 100.0 84.8
15. Unit Availability Factor 100.0 100.0 84.8
16. Unit Capacity Factor (using MDC) 102.7 102.7 84.1
17. Unit Capacity Factor (using DER) 100.0 100.0 81.8
18. Unit Forced Outage Rate 0.0 0.0 3.9 2/5/02 Page: 3 of 6