ULNRC-05846, 30-Day Response to March 12, 2012 Information Request
| ML12090A499 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 03/30/2012 |
| From: | Maglio S Ameren Missouri, Union Electric Co |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| ULNRC-05846 | |
| Download: ML12090A499 (4) | |
Text
~~
WAmeren MISSOURI Callaway Plant March 30, 2012 ULNRC-05846 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 30-DAY RESPONSE TO MARCH 12, 2012 INFORMATION REQUEST
Reference:
NRC letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, ofthe Near-Term Task Force Review oflnsights from the Fukushima Dai-lchi Accident," dated March 12, 2012 On March 12, 2012, the NRC issued "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 ofthe Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident" (Information Request) to all NRC power reactor licensees and holders of construction permits in active or deferred status. In addition to requiring detailed information, the Information Request requires recipients to confirm receipt in writing within 30 days, and that the confirmation be signed under oath or affirmation.
In accordance with this requirement, Union Electric (dba Ameren Missouri) hereby submits notice to the NRC that it has received the Information Request and is currently assessing its contents and evaluating responses. Future responses will be provided to the NRC consistent with the terms of the Information Request.
This letter does not contain new commitments.
PO Box 620 Fulton, MD 65251 AmerenMissouri.com
ULNRC-05846 March 30, 2012 Page2 If you have any questions regarding this confirmation of receipt, please contact Scott Maglio at 573-676-8719.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, AeoJ A. M ~
Scott A. Maglio Regulatory Affairs Manager Executed on: 3 { '?,b I U l "L SJM/nls
ULNRC-05846 March 30, 2012 Page 3 cc:
Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)
Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Eric J. Leeds Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-13H16M Washington, DC 20555-0001
ULNRC-05846 March 30, 2012 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
A. C. Heflin F. M. Diya C. 0. Reasoner ill L. H. Graessle J. T. Patterson S.M. Maglio T. B. Elwood S. J. Meyer J. L. Fortman R. Holmes-Bobo NSRB Secretary Mr. Paul Parmenter, Director (SEMA)
Mr. Thomas Mohr, Senior REP Planner (SEMA)
Mr. Tom Masso, REP Planner (SEMA)
Mr. Bill Muilenburg (WCNOC)
Mr. Tim Hope (Luminant Power)
Mr. Ron Barnes (APS)
Mr. Tom Baldwin (PG&E)
Mr. Wayne Harrison (STPNOC)
Ms. Linda Conklin (SCE)
Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)
Mr. Dru Buntin (DNR)