Pages that link to "TAC:54199"
Jump to navigation
Jump to search
The following pages link to TAC:54199:
Displayed 11 items.
- ML20087K388 (← links)
- 05000336/LER-1983-007, Updated LER 83-007/01T-1:on 830318,nonconservative Safety Analysis Assumption Discovered in Steam Generator Tube Rupture Analysis.Radiological Consequences of Reanalysis Being Analyzed (← links)
- ML20098B777 (← links)
- ML20116E663 (← links)
- ML20112B543 (← links)
- ML20212M560 (← links)
- A03722, Forwards Addl Info Re Effects of Loss of Offsite Power on Steam Generator Tube Rupture & Main Steam Line Break Analyses (← links)
- A03635, Forwards Info & Comments in Response to 831114 Request for Various Confirmatory Evaluations & Justification for Analytical Models Utilized in Cycle 6 Safety Analyses (← links)
- B11098, Provides Summary of Radiological Results Re Steam Generator Tube Rupture Reanalysis.Table Containing Doses for All Analyzed Cases Encl (← links)
- B11003, Informs That Util QA-verified 831212 Reanalysis of Steam Generator Tube Rupture Event.Reported Results Remain Valid. Verification Completed Prior to Startup for Cycle 6 (← links)
- B10960, Discusses Steam Generator Tube Rupture Reassessment for Cycle 6 Operation.Radiological Doses Will Be Increased as Result of Lower Reseat Pressure.Releases Expected to Be Significantly Below 10CFR100 Criteria (← links)