Pages that link to "ST.llL"
← ST.llL
Jump to navigation
Jump to search
The following pages link to ST.llL:
Displayed 16 items.
- ML20217B003 (← links)
- ST-HL-AE-2202, Discusses Justification for Request to Delete Initial Startup Loss of Offsite Power Test.Preoperational Test on 1E Ac Power Distribution & Preoperational & Initial Startup Tests Meet Reg Guide 1.68,Rev 2 Test Description Jj (← links)
- ST-HL-AE-5754, Responds to NRC Re Violations Noted in Insp Rept 50-498/97-18.Corrective Actions:Replacement SG Specification Was Revised to Show Correct Plate Matl by 971016.Memo Was Issued to W Pensacola Project Engineering Personnel (← links)
- ST-HL-AE-5780, Forwards Response to 970912 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. W/38 Oversize Drawings (← links)
- ST-HL-AE-5676, Submits Amended Response to Request for Addl Info Re 10CFR50,App R,Deviation Request for Fire Area 07.Entire Package Resubmitted W/Previously Missing Matl in Italics. Procedures Encl (← links)
- ST-HL-AE-4268, Annual 10CFR50.59 Summary Rept for South Texas Project, Units 1 & 2, Describing Changes,Tests & Experiments Associated W/Required Safety Evaluations (← links)
- ST-HL-AE-3969, Forwards Revised Semiannual fitness-for-duty Performance Rept for First Half 1991.Rept Corrects Inconsistencies in Original Rept (← links)
- ST-HL-AE-3847, Responds to Confirmatory Items Identified in Station Blackout Safety Evaluation Rept for STP Electric Generating Station,Per (← links)
- ST-HL-AE-3889, Special Rept:On 910904,SDG 22 Failed.Caused by Intermittent Malfunctioning of Instantaneous Preposition Board. Instantaneous Preposition Board Replaced & Applicable Relays in Emergency Mode Tested for Proper Resistance (← links)
- ST-HL-AE-3883, Application for Amends to Licenses NPF-76 & NPF-80,changing Tech Spec Basis 3/4.2 to Reflect WRB-1 Critical Heat Flux Correlation (← links)
- ST-HL-AE-3828, Suppls 900612 Application for Amends to Licenses NPF-76 & NPF-80,changing Tech Spec 4.5.6.2.b to Delete Autoclosure Interlock on RHR Suction Valves.Proposes Implementation of Change During Fourth Refueling Outage for Unit 1 (← links)
- ST-HL-AE-3729, Forwards Response to NRC Questions Re Implementation of 10CFR50.63 on Loss of All Ac Power,Per 910212 Meeting W/Nrc. Facilities Currently Qualify as 8 H Coping Duration Plant (← links)
- ST-HL-AE-3731, Supplemental Special Rept:On 901120,valid Failure of Diesel Generator 23 Occurred During Refueling Outage.Caused by Failure of Four Holddown Studs.On 901122,injection Pump 5R Separated from Engine.Holddown Studs Replaced (← links)
- ST-HL-AE-3640, Forwards Rev 1 to Updated FSAR for South Texas Project Electric Generating Station Units 1 & 2.Changes Since Rev 0 & Unreviewed Safety Question Evaluations & Change Notices cross-reference Encl (← links)
- ST-HL-AE-2135, Forwards Results of Safeteam Investigation of Allegation 4-86-A.Evaluation Concludes Concerns Would Not Effect Safe Plant Operation,Health & Safety of Public & Cause Abnormal Radiation Exposure to Plant Personnel (← links)
- ST-HL-AE-3700, Annual Personnel Exposure Repts for 1990 (← links)