Pages that link to "SP-112"
← SP-112
Jump to navigation
Jump to search
The following pages link to SP-112:
Displayed 50 items.
- ML072070388 (← links)
- ML072060545 (← links)
- ML19289F506 (← links)
- IR 05000302/2005003 (← links)
- ML19319D165 (← links)
- ML19329F952 (← links)
- ML20054K343 (← links)
- ML20096H441 (← links)
- ML20138Q583 (← links)
- ML20127J590 (← links)
- ML20127G770 (← links)
- ML20154F465 (← links)
- IR 05000302/1987034 (← links)
- IR 05000302/1988029 (← links)
- ML20199G686 (← links)
- IR 05000302/1986014 (← links)
- ML20204J574 (← links)
- ML20209E575 (← links)
- 05000302/LER-1977-104, Forwards Rev 1 to LER 77-104 Re Four RCS Flow Instruments Exceeding Calibr Tolerances.Util Revising Commitment to Agree W/Tech Specs to Calibr Transmitters Every 18 Months (← links)
- IR 05000302/1987013 (← links)
- IR 05000302/1987019 (← links)
- IR 05000302/1989006 (← links)
- IR 05000302/1989019 (← links)
- IR 05000302/1989008 (← links)
- ML20245J058 (← links)
- ML20215A471 (← links)
- 3F0987-19, Responds to Violations Noted in Insp Rept 50-302/87-19. Corrective Actions:Calibr of Reactor Protection Sys Revised to Incorporate Setpoints of 50 & 60 Psig for Main Turbine Control & Main Feedwater Control Oil Pressure,Respectively (← links)
- ML20210M573 (← links)
- IR 05000302/1985037 (← links)
- 3F0387-05, Revises Response to Violations Noted in Insp Rept 50-302/86-39.Temporary Mod T86-06-20-01 Re Temp Hot Channel C Removed.Util Confirmed That Procedure Used to Develop MAR Adequately Addressed Need to Document Refs (← links)
- 3F1184-19, Responds to Deviation Noted in Insp Rept 50-302/84-26. Corrective Actions:Computer Point Deleted from Calibr Procedure SP-113 & Point Added to SP-112.Point Deleted from SP-113 Will Be Added to SP-112 by 841231 (← links)
- 3F0185-16, Suppls Response to NRC Re Deviation Noted in Insp Rept 50-302/84-26.Corrective Actions:Calibr Procedures SP-112 & SP-113 Revised in May to Add Computer Points R-713 & P-714,respectively,to Ensure Calibr (← links)
- 3F1195-25, Submits Discussion in Response to Concerns Re Proposed TS Change Request to Extend Most Refueling Interval Surveillances to 24 Months.Revised Copies of Instrument Drift Studies Included in Original Submittal Attached Also (← links)
- 3F0990-07, Cycle 8 Startup Rept (← links)
- IR 05000302/1981023 (← links)
- 05000302/LER-1977-104-01, /01t-1:on 770902,four RCS Flow Instruments Discovered Out of Calibr.Caused by Calibr Drift of Differential Pressure Transmitters.Transmitters Replaced. Instruments Will Be Calibr Every 18 Months (← links)
- 05000302/LER-1982-011-03, /03L-0:on 820224,during Performance of SP-112,RC Flow,Channel a Was Found Out of Calibr.Caused by Linear Voltage Differential Transformer Shorting Out.Transformer Replaced & Instrument Calibr (← links)
- 05000302/LER-1981-070-03, /03L-0:on 811013,during Refueling Surveillance, Source Range Neutron Flux Monitoring Requirements Not Met on 811031,14 & 27.Caused by Instrument Drift & Grounded Cable. Instruments Recalibr & Cable Replaced (← links)
- 05000302/LER-1981-066-03, /03L-0:on 811010,various Reactor Protection Instruments Found Out of Tolerance.Caused by Bellows Failure,Instrument Drift & Loose Test Point Output Terminal. Bellows Replaced,Terminal Tightened & Instruments Recalibr (← links)
- IR 05000302/1981005 (← links)
- IR 05000302/1980033 (← links)
- IR 05000302/1981002 (← links)
- 05000302/LER-1980-025-03, /03L-0:on 800609,while Performing SP-112 Calibr of Reactor Protection Sys,Count Rate Amplifier for Channel a Source Range Neutron Flux Monitor Found out-of-tolerance Caused by Defective Pulse & Output Amplifier Cards (← links)
- IR 05000302/1977011 (← links)
- 05000302/LER-1979-049-03, /03L-0 on 790509:count-rate Amplifier & Rate of Change Amplifier for Nuclear Source Range Instrument NI-1 Were Inoperable.Caused by Amplifiers Being Out of Tolerance Due to Instrument Drift.Amplifiers Recalibr (← links)
- IR 05000302/1978026 (← links)
- IR 05000302/1979026 (← links)
- 05000302/LER-1979-050-03, /03L-0 on 790510:count-rate Amplifier & Rate of Change Amplifier for Nuclear Source Range Instrument NI-2 Found Inoperable.Caused by Amplifiers Being Out of Tolerance Due to Instrument Drift.Amplifiers Recalbr & Returned to (← links)
- IR 05000302/1979022 (← links)
- 05000302/LER-1979-086-03, /03L-0:on 790916,channel D Reactor Bldg High Pressure Bistable Tripped.Caused by Buildup of Dust on Shaft of Reactor Bldg Switch BS-62-PS.Switch Was Disassembled, Cleaned,Reassembled & Returned to Svc (← links)