Pages that link to "NEDC-32202P"
Jump to navigation
Jump to search
The following pages link to NEDC-32202P:
Displayed 11 items.
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 5 - Reactor Coolant System and Connected Systems (← links)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 15 - Accident Analysis (← links)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 5 - Reactor Coolant System and Connected Systems (← links)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 5 - Reactor Coolant System and Connected Systems (← links)
- RS-10-008, Clinton Power Station, Unit 1, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, (← links)
- RS-09-042, Request for Amendment to Technical Specifications Section 5.5.6, Inservice Testing Program to Incorporate Previously NRC-Approved Generic TS Changes (← links)
- U-603781, Transmittal of Revision 10 to the Clinton Power Station Technical Specifications Bases (← links)
- RS-04-024, Request for Amendment to Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles in Accordance with the Guidance of Generic Letter 91-04 (← links)
- U-603588, Transmittal of Revision 7 to Clinton Power Station Technical Specification Bases (← links)
- RS-02-018, Supplement to 06/21/2001 License Amendment Request, Surveillance Requirements for Main Steam Line Safety Relief Valves (← links)
- IR 05000461/1999003 (← links)