Pages that link to "EPID:L-2018-LLR-0126"
Jump to navigation
Jump to search
The following pages link to EPID:L-2018-LLR-0126:
Displayed 6 items.
- RS-18-123, Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) (← links)
- ML19155A060 (← links)
- RS-21-008, Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) (← links)
- ET 23-0005, 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peen (← links)
- RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) (← links)
- RA-24-0193, Supplement to Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) (← links)