Pages that link to "05000373/LER-1982-026, Forwards LER 82-026/03L-0.Detailed Event Analysis Encl"
Jump to navigation
Jump to search
The following pages link to 05000373/LER-1982-026, Forwards LER 82-026/03L-0.Detailed Event Analysis Encl:
Displayed 23 items.
- ML20054J762 (redirect page) (← links)
- 05000373/LER-1982-026 (redirect page) (← links)
- ML20054F819 (redirect page) (← links)
- 05000373/LER-1982-026, Forwards LER 82-026/03L-0 (redirect page) (← links)
- 05000373/LER-1982-155, Forwards LER 82-155/03L-0.Detailed Event Analysis Encl (← links)
- 05000373/LER-1982-150, Forwards LER 82-150/03L-0 (← links)
- 05000373/LER-1982-147, Forwards LER 82-147/03L-0 (← links)
- 05000373/LER-1982-148, Forwards LER 82-148/03L-0 (← links)
- 05000373/LER-1982-140, Forwards LER 82-140/03L-0 (← links)
- 05000373/LER-1982-142, Forwards LER 82-142/03L-0 (← links)
- 05000373/LER-1982-106, Forwards LER 82-106/03L-0 (← links)
- 05000373/LER-1982-108, Forwards LER 82-108/03L-0 (← links)
- 05000373/LER-1982-114, Forwards LER 82-114/01T-0 (← links)
- 05000373/LER-1982-113, Forwards LER 82-113/03L-0 (← links)
- 05000373/LER-1982-103, Forwards LER 82-103/03L-0 (← links)
- 05000373/LER-1982-104, Forwards LER 82-104/03L-0 (← links)
- 05000373/LER-1982-138, Forwards LER 82-138/03L-0 (← links)
- 05000373/LER-1982-127, Forwards LER 82-127/03L-0 (← links)
- 05000373/LER-1982-124, Forwards LER 82-124/03L-0.Detailed Event Analysis Encl (← links)
- 05000373/LER-1982-128, Forwards LER 82-128/03L-0 (← links)
- 05000373/LER-1982-123, Forwards LER 82-123/03L-0 (← links)
- 05000373/LER-1982-115, Forwards LER 82-115/03L-0 (← links)
- 05000373/LER-1982-133, Forwards LER 82-133/03L-0 (← links)
- 05000373/LER-1982-112, Forwards LER 82-112/03L-0 (← links)
- 05000373/LER-1982-175, Forwards LER 82-175/03L-0 (← links)
- 05000373/LER-1982-149, Forwards LER 82-149/03L-0 (← links)
- 05000373/LER-1982-094, Forwards LER 82-094/03L-0 (← links)
- 05000373/LER-1982-096, Forwards LER 82-096/03L-0 (← links)
- 05000373/LER-1982-093, Forwards LER 82-093/03L-0.Detailed Event Analysis Encl (← links)
- 05000373/LER-1982-026-03, /03L-0:on 820526,no Closure Sealing Welds Found on Subfloor Drain Piping Where Piping Penetrates Sump Liner. Drawings A-529 & A-598 Indicate Seals in Place,But No Record of Installation Is Available.Sumps Sealed (redirect page) (← links)
- ML20054J772 (redirect page) (← links)
- 05000373/LER-1982-026-03 (redirect page) (← links)
- ML20054F829 (redirect page) (← links)
- 05000373/LER-1982-023-03, /03L-0:on 820524,piston Seal on Damper Actuator Failed to Operate in Control Room Emergency HVAC Sys.Caused by Personnel Failure to Adequately Review Degraded Equipment Log.Other HVAC Train Repaired & Parts Ordered for Dampe (← links)
- 05000373/LER-1982-027-03, /03L-0:on 820526,blowdown Valve House Radiation Monitor Failed.Probably Caused by Either Loss of Power or High Voltage Surge to Radwaste Effluent Monitor.High Voltage Button in Radwaste Effluent Monitor Reset.Procedure Revis (← links)
- 05000373/LER-1982-038-01, /01T-0:on 820609,reactor Vessel Water Low Level Channel Placed in Trip Position After Over 24-h W/Inoperable Switch.Caused by Misinterpretation of Tech Specs.Tech Specs Will Be Reviewed by Operating Personnel (← links)
- 05000373/LER-1982-028-03, /03L-0:on 820526 & 0601,audits Revealed Temporary Procedure Changes 45-82 & 40-82 Not Signed by Station Superintendent.Caused by Improper Filing & Processing. Procedure Revised (← links)
- 05000373/LER-1982-030-03, /03L-0:on 820531,particulate & Iodine Not Sampled for 7-h When RCT Failed to Return Station Stack Wide Range Monitor Sample Valve Lineup to Normal Position After Grab Sampling for Noble Gas.Rct Retrained (← links)
- 05000373/LER-1982-046-01, /01T-0:on 820609,both Emergency Makeup Trains Disabled.A Train Inoperable Due to Improper Installation of Detector Paper Causing High Ammonia Signal.B Train Inoperable Due to Bent Linkage.Sys Mod Effected (← links)
- 05000373/LER-1982-033-03, /03L-0:on 820605,excessive Leakage Found in 1B RHR Svc Water Radiation Monitor Sample Pump Housing. Caused by Damaged O-ring on Sample Pump housing.O-ring Replaced & Tested Satisfactorily (← links)
- 05000373/LER-1982-032-03, /03L-0:on 820517,upon Completion of Main Stack & Standby Gas Treatment Wide Range Radiation Gas Monitor Source Check,Low Range Monitor Failed to Return to Normal. Caused by Failure in Photomultiplier Tube (← links)
- 05000373/LER-1982-043-03, /03L-0:on 820518,during Lake Blowdown Flow Indicator Quarterly Channel Functional Test,Lake Blowdown Flow Instrument Inoperable.Caused by Transmitter Failure. Transmitter Replaced & Loop Check Performed (← links)
- 05000373/LER-1982-019-03, /03L-0:on 820519,LPCS Injection Valve Permissive Switch 1E21-N006 Found Piped Incorrectly.Caused by Line Reversal on Mechanical Drawing.Piping Error Will Be Corrected.Drawing Change Requested (← links)
- 05000373/LER-1982-022-03, /03L-0:on 820523,emergency Makeup Train Heater Temp Switch for Control Room HVAC Tripped.Caused by Inadvertent Closure of Tornado Damper Which Blocked All Suction to Train Thus Raising Temp & Tripping Switch (← links)
- 05000373/LER-1982-024-03, /03L-0:on 820526,fuel Oil Found Leaking from Flange on Flexible Fuel Line Connecting Day Tank to Diesel Fire Pump 0A.Caused by Broken Flexible Fuel Line.Temporary Copper Tube Fuel Line Installed & Pump Tested (← links)
- 05000373/LER-1982-021-03, /03L-0:on 820515,outside Air Radiation Monitor 2D18-K751A Failed High.Caused by Rain Water Seeping Into Circuitry Around Conduit,Junction Boxes or Metal to Metal Interfaces.Detectors Will Be Sealed (← links)
- 05000373/LER-1982-031-01, /01T-0:on 820528,while Performing Turbine Stop Valve Test,Lead Accidentally Grounded,Tripping Reactor Protection Sys Bus A.Isolation Dampers Would Not Close. Caused by Override of Damper Trip Signals (← links)
- 05000373/LER-1982-020-03, /03L-0:on 820512,while Performing LOS-FP-W2,OA Diesel Tripped After Running 2 Mins.Caused by Operator Shorting Out Starter W/Engine Oil Dipstick During Test. Control Circuit Repaired (← links)
- 05000373/LER-1982-004-03, /03L-0:on 820422,sealing Tubing Under Reactor Bldg Trackway Doors Found Partially Pulled Out.Cause Undetermined.Tubing Replaced.Doors Locked Closed W/Shift Engineer Maintaining Control Over Key (← links)
- 05000373/LER-1982-014-03, /03L-0:on 820501,station Stack Flow Recorder Reading Low.Caused by Flow Transmitter Failure.Validyne P232 Flow Transmitter Replaced (← links)
- 05000373/LER-1982-018-03, /03L-0:on 820504,ultraviolet Fire Detectors to Refuel Floor de-energized to Prevent Damage While Completing Welding on Reactor Side.Welding Completed & Fire Detectors Back in Svc on 820514 (← links)
- 05000373/LER-1982-015-03, /03L-0:on 820417,fire Doors Were Not Inspected Daily or Weekly as Required by Lsf 172 Per Tech Spec.Caused by Security Personnel Inadvertently Deleting Insp.Daily & Weekly Fire Door Insp Immediately Established (← links)
- 05000373/LER-1982-017-03, /03L-0:on 820425,during Performance of Instrument Surveillance LIS-PC-05,standby Gas Treatment Suction Valves 1(2)VG001 Did Not Open.Caused by Four Lifted Leads Preventing Opening of Suction Valves.Leads Reterminated (← links)