Pages that link to "05000311/LER-1983-083, Forwards Supplemental LER 83-083/03X-1.Detailed Event Analysis Encl"
Jump to navigation
Jump to search
The following pages link to 05000311/LER-1983-083, Forwards Supplemental LER 83-083/03X-1.Detailed Event Analysis Encl:
Displayed 5 items.
- 05000311/LER-1983-017, Supplemental LER 83-017/03X-1:on 810515,during Startup & Cycle 1 Operations,Leakage Past Pressurizer PORVs & Pressurizer Overpressure Protection Sys Values Observed. Cause Not Stated.Porvs Modified (← links)
- 05000311/LER-1983-007, Telecopy Message of LER 83-007/01P:on 830218,two 1,000-kip Steam Generator Snubbers Failed to Meet Lockup & Bleed Rate Velocity Requirements.Cause Not Stated.Investigation Continuing.Detailed Rept to Be Submitted in 14 Days (← links)
- 05000311/LER-1982-083, Supplemental LER 82-083/03X-1:on 820812,during Routine Surveillance,Control Room Operator Received Low Svc Water Flow Indication on Containment Fan Coil Unit (Cfcu) 25. Caused by Oysters or Silt Restricting Cfcu Flow (← links)
- ML20073T340 (redirect page) (← links)
- 05000311/LER-1983-083 (redirect page) (← links)