- 05000304/LER-1985-026, Corrected LER 85-026-00:on 851108,discovered That Spring Loaded Check Valves Installed Backwards on Drain Lines for Reactor Containment Fan Cooler Motor HX Housings.Effect on Drainage Being Studied (← links)
- 05000304/LER-1984-006, Corrected LER 84-006-00:on 830602,during Normal Operation, Wide Range RCS Pressure Channels 403 & 405 Difference Exceeded Allowed Tolerance.Channel 405 Inoperable for 26 Days in Violation of Tech Specs (← links)
- 05000304/LER-1986-005, Forwards Errata to LER 86-005-00,correcting Rept Number to LER 86-010-00 (← links)
- 05000304/LER-1997-007, Forwards LER 97-007-00 Per 10CFR50.73(a)(2)(v)(B) Which Requires Written Rept for Any Event or Condition That Could Prevent Fulfillment of Safety Function of Structures or Sys Needed to Remove Residual Heat.W/Commitments Attach (← links)
- 05000304/LER-1997-006, Forwards LER 97-006-00 Per 10CFR50.73(a)92)(ii)(B) Which Requires 30 Day Written Rept When Any Event or Condition Occurs That Resulted in Condition of Nuclear Power Plant. Regulatory Commitments Encl (← links)
- 05000304/LER-1997-005, Forwards LER 97-005-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 2.Commitment Made within Ltr,Encl (← links)
- 05000304/LER-1997-003, Forwards LER 97-003-00 Re Unit 2 RHR Sys Declared Inoperable,Per 10CFR50.73(a)(2)(v)(B) (← links)
- 05000304/LER-1997-004, Forwards LER 97-004-00,per 10CFR50.73(a)(2)(i).Commitments Associated W/Correspondence,Encl (← links)
- 05000304/LER-1997-002, Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl (← links)
- 05000304/LER-1997-009, Forwards LER 97-009-00,re Event Which Occurred at Zion Nuclear Power Station,Unit 2.Commitments Made within Ltr Also Encl (← links)
- 05000304/LER-1997-008, Forwards LER 97-008-00 Per 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Written Rept.Attachment a Provides Commitments Associated W/Correspondence (← links)
- 05000304/LER-1988-009, Corrects Typo in Transmittal Ltr for LER 88-009-00.Correct Docket Is 50-304 Not 50-204 (← links)
- 05000304/LER-1985-012, Submits Revised LER Cover Ltr as Update to Cover Ltr Transmitting LER 85-012-01.Original Cover Ltr Inadvertently Ref Unit 1.LER Correct as Originally Transmitted (← links)
- 05000304/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Encl (← links)
- 05000304/LER-1996-004, Forwards LER 96-004-01 Re Results of Investigation Into Failure of Unit Containment Inner Air Lock Door.Addl Corrective Action Listed in Attachment a (← links)
- 05000304/LER-1998-001, Forwards LER 98-001-00,per 10CFR50.73(a)(2)(iv) Which Requires 30 Written Rept Following Event That Resulted in Manual or Automatic Actuation of Any Esf,Including Rps. Commitments Also Encl (← links)
- 05000304/LER-1997-001, Forwards LER 97-001-00 Per 10CFR50.73(a)(2)(iv) Which Requires Written Rept Using NRC Form 366, License Event Rept, within 90 Days of Discovery of Event.Attachment a Contains Commitments Associated W/Ltr (← links)
- 05000304/LER-1979-033, Forwards LER 79-033/03L-0 (← links)
- 05000304/LER-1982-017, Forwards LER 82-017/03L-0 (← links)
- 05000304/LER-1978-060, Forwards LER 78-060/03L-0 (← links)
- 05000304/LER-1978-062, Forwards LER 78-062/03L-0 (← links)
- 05000304/LER-1978-061, Forwards LER 78-061/03L-0 (← links)
- 05000304/LER-1978-057, Forwards LER 78-057/03L-0 (← links)
- 05000304/LER-1982-016, Forwards LER 82-016/03L-0 (← links)
- 05000304/LER-1982-015, Forwards LER 82-015/03L-0 (← links)
- 05000304/LER-1982-014, Forwards LER 82-014/03L-0 (← links)
- 05000304/LER-1982-013, Forwards LER 82-013/03L-0 (← links)