Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-14-0250, Unit 2 Request for Relaxation of Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (Unit 2 Request for Relaxation of Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
- ML031611043 + (Unit 2 Response to Nuclear Regulatory Commission Order Regarding Compliance with Revised Design Basis Threat (DBT) for Operating Power Reactors)
- 05000254/FIN-2008003-01 + (Unit 2 Restart of 2A Recirculation Pump in Mode 1)
- NL-05-2269, Unit 2 Results of Inspection Per NRC Bulletin 2004-01 of Alloy 82//182/600 Pressurizer Penetrations and Steam Space Piping Connections + (Unit 2 Results of Inspection Per NRC Bulletin 2004-01 of Alloy 82//182/600 Pressurizer Penetrations and Steam Space Piping Connections)
- ML053540156 + (Unit 2 Results of Inspection Per NRC Bulletin 2004-01 of Alloy 82//182/600 Pressurizer Penetrations and Steam Space Piping Connections)
- 05000237/FIN-2009007-02 + (Unit 2 SBLC Tank Thickness Calculation Errors)
- ML090500109 + (Unit 2 SFP Crack Leakage Graph - Entergy Document)
- ML17056B478 + (Unit 2 Safety Evaluation Rept 1991)
- ML17059A504 + (Unit 2 Safety Evaluation Summary Rept 1994)
- ML022060542 + (Unit 2 Second 10-Year Interval - Tenth Refueling Outage Inservice Inspection Summary)
- ENS 47844 + (Unit 2 Secondary Containment Affected by Violation of Unit 1 Secondary Containment Integrity During Outage)
- 05000324/FIN-2014002-02 + (Unit 2 Secondary Containment Inoperable Due to Door Gaps)
- ENS 49984 + (Unit 2 Secondary Containment Interlocked Doors Opened Simultaneously)
- ML19325C173 + (Unit 2 Semiannual Radioactive Effluent Release Rept Jan-June 1989)
- ML052510422 + (Unit 2 Senior Management Organization Change in the Nuclear Generation Group)
- 05000335/FIN-2015003-05 + (Unit 2 Shutdown Due to Through Wall Crack and Leak in the 2B2 Safety Injection Tank Discharge Pipe)
- ENS 48822 + (Unit 2 Shutdown Required by Technical Specifications Due to Inoperable Rcic)
- ENS 52267 + (Unit 2 Shutdown Required by Technical Specifications Due to Inoperable Diesel Generator)
- ENS 51264 + (Unit 2 Site Stack Radiation Monitor Failure)
- NL-05-2320, Unit 2 Special Report No. 2005-001-00, Inoperable Radiation Monitor R-29B + (Unit 2 Special Report No. 2005-001-00, Inoperable Radiation Monitor R-29B)
- ENS 50262 + (Unit 2 Spray Addition Declared Inoperable Due to Tank Indication Greater than 67%)
- ENS 50106 + (Unit 2 Stack High Range Radiation Monitor Removed from Service for Pre-Planned Maintenance)
- 05000315/FIN-2013004-01 + (Unit 2 Steam Generator #1 Stop Valve Dump Valve 2-MRV-212 Stroke Time Failure due to Operation of Dump Valve Outside its Packing Design)
- ML033510702 + (Unit 2 Steam Generator (SG) Tube Plugging Report - SG Tube Inspections During Unit 2 Cycle 12 Refueling Outage)
- ML020990197 + (Unit 2 Steam Generator Category C-3 Inspection Results 30 Day Report)
- L-PI-06-102, Unit 2 Steam Generator Inspection Results - 15 Day Report + (Unit 2 Steam Generator Inspection Results - 15 Day Report)
- L-PI-05-054, Unit 2 Steam Generator Inspection Results - 15-Day Report + (Unit 2 Steam Generator Inspection Results - 15-Day Report)
- ML022840014 + (Unit 2 Steam Generator Plugging 15 - Day Report)
- ML17310B025 + (Unit 2 Steam Generator Tube Insp Plan Addendum)
- ML021280548 + (Unit 2 Steam Generator Tube Plugging Report - SG Tube Inspections During Unit 2 Cycle 11 Refueling Outage)
- ML15280A422 + (Unit 2 Technical Specification Pages 6-15b)
- ENS 50370 + (Unit 2 Technical Specification Required Shutdown Due to Multiple Inoperable Emergency Diesel Generators)
- ML20263D421 + (Unit 2 Three Line Diagram 125 - 250 Volt DC System MCC 2XDA,2XDB,2TDA,2TDB, as-built)
- ML032180040 + (Unit 2 Transmittal of Emergency Plan Implementing Procedures)
- 05000281/FIN-2014005-01 + (Unit 2 Trip Due to Loose RPS Wire Connection)
- 05000304/LER-1981-008-03, Unit 2 Tripped & Safety Injected,Causing One Feedwater Pump to Tripp.Caused by Loss of Inverter 213 Due to High Inverter Circulating Current. Tuning Adjustments Made + (Unit 2 Tripped & Safety Injected,Causing One Feedwater Pump to Tripp.Caused by Loss of Inverter 213 Due to High Inverter Circulating Current. Tuning Adjustments Made)
- ML20263M277 + (Unit 2 Turbine Roll Integrated Schedule)
- 05000368/FIN-2014005-05 + (Unit 2 Unplanned Scrams Performance Indicator)
- AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements + (Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements)
- ML19224A161 + (Unit 2 Will Install Feedwater Sys Mod Prior to Startup Following Plant First Refueling Outage.Requests Opportunity to Meet W/Nrc 781019)
- ML052520205 + (Unit 2 and Unit 3 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors)
- 05000388/LER-2016-004 + (Unit 2 experienced an electrical transient resulting in a manual SCRAM)
- ML19224B194 + (Unit 2 no-name Outage List,Revision 6)
- ML19224B339 + (Unit 2 out-of-svc Log)
- ML24114A015 + (Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping)
- BYRON 2005-0024, Unit 2, 2004 Annual Environmental Operating Report + (Unit 2, 2004 Annual Environmental Operating Report)
- ML14154A087 + (Unit 2, Acceptance Review Concerning Alternative to Inservice Inspection for Reactor Vessel Flange Leak-Off Lines)
- L-PI-13-075, Unit 2, Amended Inservice Inspection (Isl) Summary Report, for Unit 1 Cycle 27 and Unit 2 Cycle 26 + (Unit 2, Amended Inservice Inspection (Isl) Summary Report, for Unit 1 Cycle 27 and Unit 2 Cycle 26)
- 2CAN020303, Unit 2, Annual Primary Coolant Specific Activity Report for 2002 + (Unit 2, Annual Primary Coolant Specific Activity Report for 2002)
- 0CAN020901, Unit 2, Annual Radioactive Effluent Release Report, January 1 Through December 31, 2008 + (Unit 2, Annual Radioactive Effluent Release Report, January 1 Through December 31, 2008)
- WBL-24-021, Unit 2, Annual Radioactive Effluent Release Report + (Unit 2, Annual Radioactive Effluent Release Report)