Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20261M503 + (Unit 1 Service Water Header Supports for South Side Control Rod Drive, as-built)
- ML19224B489 + (Unit 1 Shift Foreman Log)
- ML13322A855 + (Unit 1 Shutdown to Hot Standby Condition,Revision 9)
- ML20262B654 + (Unit 1 Single Line Diagram of Electrical System)
- NL-11-1904, Unit 1 Sixteenth Maintenance/Refueling Outage Steam Generator Tube Inspection Report + (Unit 1 Sixteenth Maintenance/Refueling Outage Steam Generator Tube Inspection Report)
- 05000348/FIN-2013002-02 + (Unit 1 Solid State Protection System Modifications)
- 05000348/FIN-2015003-05 + (Unit 1 Solid State Protection System Modifications)
- ML19321B309 + (Unit 1 Special Startup Test Rept)
- ENS 49175 + (Unit 1 Spent Fuel Pool Island Radiation Monitor Inoperable)
- ML20266J767 + (Unit 1 Stairwell G24.Sheet 1R of 2R)
- RBG-30602, Unit 1 Startup Test Rept (Suppl 11) + (Unit 1 Startup Test Rept (Suppl 11))
- RBG-31323, Unit 1 Startup Test Rept (Suppl 12), Covering Period Through 890727 + (Unit 1 Startup Test Rept (Suppl 12), Covering Period Through 890727)
- RBG-32234, Unit 1 Startup Test Rept (Suppl 14) + (Unit 1 Startup Test Rept (Suppl 14))
- ML20115A884 + (Unit 1 Status,La Salle County Station,Station Const. Related Info Encl)
- ML030030487 + (Unit 1 Steam Generator Category C-3 Inspection Result 30 Day Report with Technical Specification 5.6.7.3, Provided for the Information of the NRC Staff)
- ML17303A454 + (Unit 1 Steam Generator Eddy Current Exam,Feb 1987, NDE Summary Rept)
- ENS 44927 + (Unit 1 Steam Generator Found in an Unanalyzed Condition Related to Gaps on Seismic Washer Plates)
- ML17325B566 + (Unit 1 Steam Generator Layup Chemistry Out of Specification During 970924 Through 971231)
- 1CAN010605, Unit 1 Supplement to Amendment Request Response to Additional Questions Related to the Revision of the Allowable Value for Emergency Feedwater Initiation and Control Function (EFIC) + (Unit 1 Supplement to Amendment Request Response to Additional Questions Related to the Revision of the Allowable Value for Emergency Feedwater Initiation and Control Function (EFIC))
- ML091940188 + (Unit 1 Supplement to WBN-TS-09-11, Proposed Change to TS 3.6.3, Containment Isolation Valves, Regarding Position Verification Requirements (TSTF-269-A, TSTF-45-A, and TSTF-440-A))
- ML20247C444 + (Unit 1 Suppression Chamber Support Anchor Bolt Study)
- 05000259/FIN-2011005-02 + (Unit 1 TS 3.0.3 Entry Caused by the Failure of RPS M-G Set 1B)
- 05000348/LER-2008-002, Unit 1 TS 3.0.3 Entry Due to Inoperability of Residual Heat Removal System + (Unit 1 TS 3.0.3 Entry Due to Inoperability of Residual Heat Removal System)
- ML19224B611 + (Unit 1 Tank Levels for 790326-27)
- ENS 50700 + (Unit 1 Technical Specification Shutdown Due to Rcs Pressure Boundary Leakage)
- 05000387/LER-2002-001, Unit 1 Temporary Loss of Control Structure Chillers + (Unit 1 Temporary Loss of Control Structure Chillers)
- 05000327/FIN-2013005-01 + (Unit 1 Train A RHR Containment Suction Valve Failure)
- 05000455/FIN-2008002-04 + (Unit 1 Train B Auxiliary Feedwater Pump Diesel Fire and Shutdown During Surveillance)
- ENS 50492 + (Unit 1 Train B Rvlis and Iccm Inoperable Due to Data Errors)
- 05000338/FIN-2011011-05 + (Unit 1 Turbine Driven Auxiliary Feedwater Pump Trouble Alarm)
- 05000321/FIN-2013002-02 + (Unit 1 Under Vessel Leak Source Not Identified)
- NL-04-2265, Unit 1 Updated Analysis of Core Shroud Vertical Welds and Supplemental Information + (Unit 1 Updated Analysis of Core Shroud Vertical Welds and Supplemental Information)
- 05000400/LER-2010-004, Unit 1 Valid Actuation of B Emergency Diesel Generator Due to Loss of B-SB 6.9kV Safety Bus + (Unit 1 Valid Actuation of B Emergency Diesel Generator Due to Loss of B-SB 6.9kV Safety Bus)
- ENS 44716 + (Unit 1 Was Manually Tripped from 32% Power Due to an Abnormal Rod Pattern)
- NOC-AE-08002297, Unit 1 Weld Overlay Examination Results (RR-ENG-2-43) (TAC MD1414-1423) + (Unit 1 Weld Overlay Examination Results (RR-ENG-2-43) (TAC MD1414-1423))
- ML081270090 + (Unit 1 Weld Overlay Examination Results (RR-ENG-2-43) (TAC MD1414-1423))
- 05000528/LER-2021-001-01, Unit 1 and 3 Emergency Diesel Generator Actuation on Loss of Offsite Power to Class 4.16 Kv Buses + (Unit 1 and 3 Emergency Diesel Generator Actuation on Loss of Offsite Power to Class 4.16 Kv Buses)
- CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan + (Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan)
- RS-08-085, Unit 1 and Oyster Creek - Amergen Energy Company, LLC Annual Financial Statement + (Unit 1 and Oyster Creek - Amergen Energy Company, LLC Annual Financial Statement)
- 05000454/FIN-2008003-06 + (Unit 1 and Unit 2 Auxiliary Feedwater Tunnel Hatch Margin to Safety)
- ENS 50116 + (Unit 1 and Unit 2 Emergency Diesel Generators Start and Load Due to Loss of One 34.5Kv Line)
- ENS 43169 + (Unit 1 and Unit 2 Reactor Trip)
- LR-N25-0022, Unit 1 and Unit 2, Submittal of Annual Report of Fitness for Duty (FFD) Performance Data for 2024 + (Unit 1 and Unit 2, Submittal of Annual Report of Fitness for Duty (FFD) Performance Data for 2024)
- LR-N05-0386, Unit 1 and Unit 2, Supplement to Request for Change to Technical Specification to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process + (Unit 1 and Unit 2, Supplement to Request for Change to Technical Specification to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process)
- NL-19-1559, Unit 1 and Unit 2, Updates to Emergency Response Data System Data Point Library + (Unit 1 and Unit 2, Updates to Emergency Response Data System Data Point Library)
- ML19224B327 + (Unit 1 out-of-svc Log)
- 1CAN031202, Unit 1, 10 CFR 50.46 Report – Significant Change in Peak Cladding Temperature + (Unit 1, 10 CFR 50.46 Report – Significant Change in Peak Cladding Temperature)
- RA-08-107, Unit 1, 2008 Annual Report -Guarantees of Payment of Deferred Premiums + (Unit 1, 2008 Annual Report -Guarantees of Payment of Deferred Premiums)
- RBG-47228, Unit 1, 30-Day Response to the March 12, 2012, Information Request + (Unit 1, 30-Day Response to the March 12, 2012, Information Request)
- RBG-47299, Unit 1, 90-Day Response to Bulletin 2012-01, Design Vulnerability in Electric Power System + (Unit 1, 90-Day Response to Bulletin 2012-01, Design Vulnerability in Electric Power System)
- 1CAN040401, Unit 1, ANO-1 Cycle 19 COLR + (Unit 1, ANO-1 Cycle 19 COLR)