Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000440/FIN-2009004-03 + (Unexpected Half SCRAM Due to Faulty Troubleshooting Plan)
- ENS 44672 + (Unexpected High Pressure Coolant Injection Isolation During Test)
- 05000341/LER-2022-002, Unexpected High Pressure Coolant Injection Turbine Trip + (Unexpected High Pressure Coolant Injection Turbine Trip)
- ML19241B357 + (Unexpected I-131 in English Sheep)
- ENS 48106 + (Unexpected Integrated Plant Computer System Failure)
- ENS 44925 + (Unexpected Logic Lockout of Division I Rhr During Surveillance Testing)
- ENS 46694 + (Unexpected Loss of Annuciators During Planned Maintenance)
- 05000261/FIN-2010009-14 + (Unexpected Loss of Instrument Bus 3 for Two Minutes)
- 05000382/LER-2014-003 + (Unexpected Loss of Wet Cooling Tower fan results in both trains of Ultimate Heat Sink Inoperable.)
- 05000443/FIN-2014003-02 + (Unexpected Main Generator Breaker Pole Closure Results in Reactor Trip)
- Information Notice 1993-59, Unexpected Opening of Both Doors in an Airlock + (Unexpected Opening of Both Doors in an Airlock)
- Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves + (Unexpected Opening of Multiple Safety Relief Valves)
- Information Notice 1995-47, Unexpected Opening of a Safety/Relief Valve & Complications Involving Suppression Pool Cooling Strainer Blockage + (Unexpected Opening of a Safety/Relief Valve & Complications Involving Suppression Pool Cooling Strainer Blockage)
- Information Notice 1996-15, Unexpected Plant Performance During Performance of New Surveillance + (Unexpected Plant Performance During Performance of New Surveillance)
- 05000219/FIN-2009004-01 + (Unexpected Power Drop When Transferring Mode of Control of Recirculation Pump)
- 05000346/FIN-2008002-03 + (Unexpected Reactivity Excursion Due to Unidentified Valve Position During Post Repair Air Pressure Testing)
- ENS 44545 + (Unexpected Reactor Core Isolation Cooling Isolation During Test)
- ENS 42555 + (Unexpected Reactor Protection System (Rps) Actuation During Testing)
- ENS 40921 + (Unexpected Reactor Trip During Maintenance Activities)
- 05000440/FIN-2010007-01 + (Unexpected Recirculation Flow Control Valve Runback Due to Inadequate Work Plan)
- Information Notice 1992-86, Unexpected Restriction to Thermal Growth of Reactor Coolant Piping + (Unexpected Restriction to Thermal Growth of Reactor Coolant Piping)
- 05000461/FIN-2017002-03 + (Unexpected Start of the Division 3 Emergency Diesel Generato)
- ENS 45001 + (Unexpected Start of the Steam Driven Auxiliary Feedwater Pump During Plant Cooldown)
- 05000321/FIN-2015001-06 + (Unfused DC Ammeter Circuits Result in an Unanalyzed Condition)
- 05000348/FIN-2014005-04 + (Unfused DC Ammeter Circuits Result in an Unanalyzed Condition)
- Information Notice 2014-10, Unfused DC Ammeter Circuits and Potential for Fire Events + (Unfused DC Ammeter Circuits and Potential for Fire Events)
- ML060550423 + (Uni 2, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-18 Use of Structural Weld Overlay and Associated Alternative Repair Techniques,)
- ML21085A014 + (Uni-Directional Communications (Not Implemented in Software) from High Safety to Lower Safety Systems and Internal Plant to External Systems Connected to the Internet)
- ML20134Q055 + (Unicom 1996 Summary Annual Rept)
- ML20216D361 + (Unicom Corp 1997 Summary Annual Rept)
- ML20205M706 + (Unicom Corp 1998 Summary Annual Rept. with)
- 05000237/LER-1983-076-03, Unidentified Drywell Leakage Calculated to Be 3.08 Gpm.Caused by Cut in Seal Ring Seating on Feedwater Check Valve Body.Cut silver-soldered & New Seal Ring Installed + (Unidentified Drywell Leakage Calculated to Be 3.08 Gpm.Caused by Cut in Seal Ring Seating on Feedwater Check Valve Body.Cut silver-soldered & New Seal Ring Installed)
- 05000259/LER-1982-020-03, Unidentified Drywell Leakage Increased in Excess of Tech Spec Limits.Caused by Vibration Induced Fatigue Crack in 3/4-inch Reactor Water Cleanup Sys Test Connection.Line Rerouted + (Unidentified Drywell Leakage Increased in Excess of Tech Spec Limits.Caused by Vibration Induced Fatigue Crack in 3/4-inch Reactor Water Cleanup Sys Test Connection.Line Rerouted)
- ENS 52222 + (Unidentified Leakage Greater than Technical Specifications)
- 05000317/LER-1981-073-03, Unidentified RCS Leakage Increased to 1.23 Gpm.Caused by Loose Valve Packing.Valve Repacked + (Unidentified RCS Leakage Increased to 1.23 Gpm.Caused by Loose Valve Packing.Valve Repacked)
- ENS 47514 + (Unidentified Rcs Leakage Greater than 2 Gpm Increase within 24 Hours)
- ENS 40904 + (Unidentified Reactor Coolant System (Rcs) Leak)
- ML20099J122 + (Unified Theory for Predicting Maximum Fluid Particle Size for Drops and Bubbles)
- ML19257C925 + (Unified Transport for Power Plant Assessment (Radioisotopes), Monthly Progress Rept for Aug 1979)
- ML19249B954 + (Unified Transport for Power Plant Assessment (Radioisotopes). Monthly Progress Rept Mar 1979)
- ML20126C251 + (Unified Transport for Power Plant Assessment (Radioisotopes), Monthly Progress Rept for Jan 1980)
- ML19249B948 + (Unified Transport for Power Plant Assessment (Radioisotopes). Monthly Progress Rept Apr 1979)
- ML19257D213 + (Unified Transport for Power Plant Assessment (Radioisotopes), Monthly Progress Rept for Dec 1979)
- ML19257D205 + (Unified Transport for Power Plant Assessment (Radioisotopes), Monthly Progress Rept for Oct 1979)
- ML19249B958 + (Unified Transport for Power Plant Assessment (Radioisotopes). Monthly Progress Rept May 1979)
- ML19249B973 + (Unified Transport for Power Plant Assessment (Radioisotopes), Monthly Progress Rept for Jul 1979)
- ML19249B965 + (Unified Transport for Power Plant Assessment (Radioisotopes), Monthly Progress Rept for June 1979)
- ML19257C930 + (Unified Transport for Power Plant Assessment (Radioisotopes), Monthly Progress Rept for Sept 1979)
- ML19257D208 + (Unified Transport for Power Plant Assessment (Radioisotopes), Monthly Progress Rept for Nov 1979)
- ML20054E816 + (Uniform & Pitting Corrosion Data Requirements for TiCode-12 High Level Waste Containers, Interim Rept)
- ML21138A909 + (Uniformed Services Univ. of the Health Sciences, Interim Reactor Facility Director Change Update)