Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Transmittal of Revision 10 Changes to Physical Security Plan". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML042330760  + (Transmittal of Revision 1 Significance Determination Process Risk-informed Inspection Notebook and Information Request for Next Revision - Fermi)
  • ML042330741  + (Transmittal of Revision 1 Significance Determination Process Risk-informed Inspection Notebook and Information Request for Next Revision - Arkansas 1)
  • ML042360359  + (Transmittal of Revision 1 Significance Determination Process Risk-Informed Inspection Notebook and Information Request for Next Revision - Ginna)
  • ML042510084  + (Transmittal of Revision 1 Significance Determination Process Risk-Informed Inspection Notebook and Information Request for Next Revision - Brunswick, Harris, Robinson, Crystal River)
  • ML042540409  + (Transmittal of Revision 1 Significance Determination Process Rick-Informed Inspection Notebook and Information for Next Revision - Watts Bar)
  • ML042510238  + (Transmittal of Revision 1 Significance Determination Process Risk-informed Inspection Notebook and Information Request for Next Revision - Farley, Vogtle, Hatch)
  • ML042330759  + (Transmittal of Revision 1 Significance Determination Process Risk-Informed Inspection Notebook and Information Request for Next Revision - Browns Ferry)
  • ML042470192  + (Transmittal of Revision 1 Significance Determination Process Risk-informed Inspection Notebook and Information Request for Next Revision - Nine Mile Point 1 & 2)
  • ML042510093  + (Transmittal of Revision 1 Significance Determination Process Risk-Informed Inspection Notebook and Information Request for Next Revision - Fort Calhoun)
  • ML042540250  + (Transmittal of Revision 1 Significance Determination Process Risk-informed Inspection Notebook and Information Request for Next Revision - Hope Creek, Salem)
  • ML042510050  + (Transmittal of Revision 1 Significance Determination Process Risk-Informed Inspection Notebook and Information Request for Next Revision - Comanche Peak)
  • ML042540296  + (Transmittal of Revision 1 Significance Determination Process Rick-Informed Inspection Notebook and Information for Next Revision - Catawba, McGuire, and Oconee)
  • ML042510216  + (Transmittal of Revision 1 Significance Determination Process Risk-informed Inspection Notebook and Information Request for Next Revision - Prairie Island)
  • ML042510106  + (Transmittal of Revision 1 Significance Determination Process Rick-Informed Inspection Notebook and Information Request for Next Revision - Columbia)
  • ML17221A199  + (Transmittal of Revision 1 of Chapters 10.0, 11.0, 12.0 (Including Appendices 12A, 12b and 12C) and 14.0 and Revision 2 of Chapters 2.0, 3.0, 6.0, 7.0, 8.0 and 13.0 of NWMI-2013-021, Construction Permit Application for Radioisotope Productio)
  • NRC-15-0098, Transmittal of Revision 1 of Core Operating Limits Report for Cycle 18  + (Transmittal of Revision 1 of Core Operating Limits Report for Cycle 18)
  • LIC-05-0081, Transmittal of Revision 1 of Fort Calhoun Station, Unit, Pressure Temperature Limits Report (PTLR)  + (Transmittal of Revision 1 of Fort Calhoun Station, Unit, Pressure Temperature Limits Report (PTLR))
  • NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22  + (Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22)
  • ML040900453  + (Transmittal of Revision 1 to CNS-04-01-01, Evaluation of Upper Shelf Fracture Toughness of the Nine Mile Point, Unit 1, Reactor Vessel to the End of the Period of Extended Operation)
  • NL-16-003, Transmittal of Revision 1 to Cyber Security Plan  + (Transmittal of Revision 1 to Cyber Security Plan)
  • ML073410249  + (Transmittal of Revision 1 to Regulatory Guide 1.97, a Clearer Basis for Development Initial Response)
  • ML081160094  + (Transmittal of Revision 1 to Request for Relief No. 04-ON-012 Third Ten Year Inservice Inspection Interval)
  • ML18283B372  + (Transmittal of Revision 1 to Response Concerning Electrical Connector Assemblies)
  • ML022030464  + (Transmittal of Revision 1 to Return to Service Plan)
  • ML070450166  + (Transmittal of Revision 1 to the Final Status Survey Plan for the Plum Brook Reactor Facility)