Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML020600093 + (Transmittal of Revised Emergency Plan Implementing Procedures EP-IP-100 (Revision 17) & EP-IP-225 (Revision 0) for Pilgrim Nuclear Power Station)
- ML020560142 + (Transmittal of Revised Emergency Plan Implementing Procedures Volume 2 EAP-10 Revision 15), Volume 2 EAP-11 (Revision 17), Volume 2 EAP-16.2 (Revision 0) & Volume 3 EAP-32 (Revision 8) for James A. Fitzpatrick Nuclear Power Plant)
- ML020720150 + (Transmittal of Revised Emergency Plan Implementing Procedures Volume 2 EAP-8 (Rev 55), EAP-17 (Rev 99) & Volume 3 EAP-43 (Rev 55) for James A. Fitzpatrick Nuclear Power Plant)
- NOC-AE-03001514, Transmittal of Revised Emergency Plan Implementing Procedures for South Texas Project, Including OERP01-ZV-IN03 Rev 10, OERP01-ZV-IN05 Rev 7, OERP01-ZV-SH01 Rev 17, OPP05-ZV-0003 Rev 6, OPGP05-ZV-009 Rev 9 & OPGP05-ZV-0012 Rev 6 + (Transmittal of Revised Emergency Plan Implementing Procedures for South Texas Project, Including OERP01-ZV-IN03 Rev 10, OERP01-ZV-IN05 Rev 7, OERP01-ZV-SH01 Rev 17, OPP05-ZV-0003 Rev 6, OPGP05-ZV-009 Rev 9 & OPGP05-ZV-0012 Rev 6)
- ML031040563 + (Transmittal of Revised Emergency Plan Implementing Procedures for South Texas Project, Including OERP01-ZV-IN03 Rev 10, OERP01-ZV-IN05 Rev 7, OERP01-ZV-SH01 Rev 17, OPP05-ZV-0003 Rev 6, OPGP05-ZV-009 Rev 9 & OPGP05-ZV-0012 Rev 6)
- ML020440321 + (Transmittal of Revised Emergency Plan Implementing Procedure RA-EP-02010 (Revision 2) Pages 1 - 4, 12 -16, 17 - 22 for Davis-Besse Nuclear Power Station)
- ML040980509 + (Transmittal of Revised Emergency Plan Implementing Procedures El-4.3, Revision 15)
- ML020450464 + (Transmittal of Revised Emergency Plan Implementing Procedures FNP-0-EIP-8.0 (Revision 98), FNP-0-EIP-13.0 (Revision 16) for Farley Nuclear Plant)
- ML031740344 + (Transmittal of Revised Emergency Plan Procedures for Peach Bottom Units 2 & 3, Limerick Units 1 & 2 and Three Mile Island Unit 1)
- ML032020444 + (Transmittal of Revised Emergency Plan Procedures EP-MA-110-100, Revision 2 & EP-MA-114-100, Revision 4 for Peach Bottom, Units 2 & 3, Limerick Generating, Units 1 & 2 and Three Mile Island, Unit 1)
- B18932, Transmittal of Revised Emergency Plan Procedures MP-26-EPI-FAP01-001, Rev. 1 & Minor Rev. 7 + (Transmittal of Revised Emergency Plan Procedures MP-26-EPI-FAP01-001, Rev. 1 & Minor Rev. 7)
- RC-01-0138, Transmittal of Revised Emergency Plan Procedures EPP-023, Rev. 12 & EPP-051, Rev. 6 for Virgil C. Summer Nuclear Station + (Transmittal of Revised Emergency Plan Procedures EPP-023, Rev. 12 & EPP-051, Rev. 6 for Virgil C. Summer Nuclear Station)
- CPSES-200301655, Transmittal of Revised Emergency Plan Procedures + (Transmittal of Revised Emergency Plan Procedures)
- CPSES-200301423, Transmittal of Revised Emergency Plan Procedures + (Transmittal of Revised Emergency Plan Procedures)
- CPSES-200200963, Transmittal of Revised Emergency Plan Procedures + (Transmittal of Revised Emergency Plan Procedures)
- ML031120476 + (Transmittal of Revised Emergency Plan Procedures for Indian Point 3)
- ML020530336 + (Transmittal of Revised Emergency Response Procedures (Erps) ERP-660 (Revision 7), ERP-650 (Revision 11), ERP-630 (Revision 4), ERP-600 (Revision 13), ERP-340 (Revision 9), ERP-300 (Revision 23) for Limerick Generating Station)
- ML20084D069 + (Transmittal of Revised Environ Qualification Rept for Electrical Equipment.Approx 95% of Qualification for Electrical Equipment Completed.Certificate of Svc Encl. Related Correspondence)
- ML12030A236 + (Transmittal of Revised Exhibits in Support of Consolidated Contention NYS-17B: NYSR11001 (Exhibits List), NYSR00224 (Pre-filed Testimony), and NYSR00231 (Report))
- ML19178A106 + (Transmittal of Revised Final Status Survey Report - Phase 1)
- ZS-2019-0043, Transmittal of Revised Final Status Survey Report - Phase 1 + (Transmittal of Revised Final Status Survey Report - Phase 1)
- ML19225B578 + (Transmittal of Revised Inservice Inspection Program Pertaining to Pumps and Valve Testing, and Portion of the Program Pertaining to Non-Destructive Examination of Welds)
- ML012120295 + (Transmittal of Revised Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures)
- ML021550359 + (Transmittal of Revised Kewaunee Nuclear Power Plant Emergency Response Plan Implementing Procedures EPIP-AD-05 (Rev D), EPIP-OSF-03 (Rev P), EPIP-TSC-04 (Rev N), EPIP-TSC-10 (Rev K), Form EPIPF-TSC-04-01 (Rev G). Form EPIPF-TSC-04-02 Will B)
- ML021220573 + (Transmittal of Revised Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedure EPIP-RET-09 (Revision L) & EPIP Form Ret 9 (Revision D))
- GNRO-2005/00057, Transmittal of Revised Ldc 05060, Core Operating Limits Report Cycle 15 + (Transmittal of Revised Ldc 05060, Core Operating Limits Report Cycle 15)
- ML021560072 + (Transmittal of Revised Manual Table of Contents for Susquehanna EP-PS-244, Dose Assessment Staffer)
- ML021550514 + (Transmittal of Revised Manual Table of Contents for Susquehanna EP-PS-245 Dose Assessment Supervisor)
- ML031770135 + (Transmittal of Revised McGuire Nuclear Station Selected Commitments Manual (SLC) Table of Contents (Revision 030), List of Effective Pages (Revision 035), SLC 16.9.7 (Revision 042) & SLC 16.6.2 (Deleted))
- ML032681010 + (Transmittal of Revised Neutron Transport Calculations Benchmarking Report)
- ML022000135 + (Transmittal of Revised North Anna Power Station Emergency Plan Implementing Procedures EPIP-4.08 (Revision 14), EPIP-4.09 (Revision 13 EPIP-4.17 (Revision 15 & EPIP-4.18 (Revision 12))
- LIC-16-0095, Transmittal of Revised Overall Integrated Plan for Fuel Permanently Removed from the Reactor Vessel to the Spent Fuel Pool in Response to Requirements for Mitigation Strategies for Beyond Design Basis External Events + (Transmittal of Revised Overall Integrated Plan for Fuel Permanently Removed from the Reactor Vessel to the Spent Fuel Pool in Response to Requirements for Mitigation Strategies for Beyond Design Basis External Events)
- ML020580179 + (Transmittal of Revised Oyster Creek Technical Specification Page 3 (Revision 224), Lep 1 (Revision 224), Lep 4 (Revision 224), Xxiv (Revision 224), TS Appendix a Pages 6-4 & 6-6 (Revision 224))
- ML020450305 + (Transmittal of Revised RERP Plan Implementing Procedure EP-301-01 (Revision 15) for Fermi 2)
- ML081070324 + (Transmittal of Revised Response to Request for Additional Information License Amendment Request, Uprate of Shutdown Cooling (SDC) System Entry Conditions (TAC No. MD6993) and Calculation FC05694)
- ML24138A219 + (Transmittal of Revised Responses to Request for Additional Information on the GA-EMS Fast Modular Reactor Quality Assurance Program Description Topical Report)
- ML24135A385 + (Transmittal of Revised Responses to Request for Additional Information on the GA-EMS Fast Modular Reactor Quality Assurance Program Topical Report)
- TSTF-09-25, Transmittal of Revised Risk-Informed End State Travelers: TSTF-422, TSTF-423, TSTF-431, and TSTF-432 + (Transmittal of Revised Risk-Informed End State Travelers: TSTF-422, TSTF-423, TSTF-431, and TSTF-432)
- ML081960492 + (Transmittal of Revised Stress Analysis for Pressurizer Spray Nozzles of Full Structural Preemptive Weld Overlays)
- ML021650306 + (Transmittal of Revised Table of Contents (Revision 13) for Susquehanna Emergency Plan Implementing Procedure EP-PS-116, Administrative (Admin) Coordinator: Emergency Plan - Position Specific Procedure)
- ML021550501 + (Transmittal of Revised Table of Contents for Susquehanna EP-PS-101 Emergency Director (ED) - TSC Emergency Plan - Position Specific Procedure)
- ML021560007 + (Transmittal of Revised Table of Contents for Susquehanna, LLC - EP-PS-106 Health Physics Specialist (Duty Foreman): Emergency Plan - Position Specific Procedure)
- ML040840376 + (Transmittal of Revised Technical Requirements Manual (TRM) Update 3/1/04)
- NL-16-2013, Transmittal of Revised Technical Specification Pages + (Transmittal of Revised Technical Specification Pages)
- NRC-07-0047, Transmittal of Revised Technical Specifications (TS) Pages for Use with the Application to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems in TS 3.7.4 + (Transmittal of Revised Technical Specifications (TS) Pages for Use with the Application to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems in TS 3.7.4)
- ML11230A385 + (Transmittal of Revised Unit 1 / Unit 2 As-Designed Fire Protection Report)
- ML13081A004 + (Transmittal of Revised Unit 1/Unit 2 As-Designed Fire Protection Report)
- ML16357A286 + (Transmittal of Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report)
- ML15245A509 + (Transmittal of Revised Vallecitos Nuclear Center (Vnc) Site Physical Security Plan)
- ML20030A002 + (Transmittal of Revised, Draft Safety Evaluation for BWRVIP-25, Revision 1 (E-mail))
- ML033110462 + (Transmittal of Revision 0 to EP-PS-135, NRC Communicator)