Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20023A016 + (Ti 2690/011 Revision 1, Review of Aging Management Programs at Independent Spent Fuel Storage Installations)
- ML22091A049 + (Ti 2800-044 Assessment of Physical Protection Requirements Under 10 CFR 150.14 for Agreement State Licensees Possessing, Using, or Transporting Special Nuclear Material of Low Strategic Significance)
- ML003749043 + (Ti 2800/029 Rev. 1 - ML003749043)
- IR 05000263/2016405 + (Ti 2800/041, 10 CFR Pt. 37, Physical Protection of Cat. 1 and Cat. 2 Quantities of Radioactive Material at Facilities with a 10 CFR Pt. 37 Physical Protection Program; IR 05000263/2016405 - Cover Letter Only (Gph))
- IR 05000315/2016404 + (Ti 2800/041, 10CFR37, Physical Protection of Cat. 1&2 Quantities of Radioactive Material at Facilities with a 10CFR73, Physical Protection Program; IR 05000315/2016404; 05000316/2016404 and Exercise of Enforcement Discretion)
- IR 05000341/2016405 + (Ti 2800/041, 10CFR37, Physical Protection of Cat. 1 and 2 Quantities of Radioactive Material at Facilities with 10CFR37, Physical Protection Program IR 05000341/2016405 - Cover Letter Only)
- ML17297B921 + (Ti 2800/043 Rev 2 Inspection of Facilities Potentially Contaminated with Discrete Radium-226 Sources)
- ML19283B217 + (Ti 2800/043 Rev 3 Inspection of Facilities Potentially Contaminated with Discrete Radium-226 Sources)
- ML20351A280 + (Ti 2800/043 Revision 4 Inspection of Facilities Potentially Contaminated with Discrete Radium-226 Sources)
- ML21274A029 + (Ticap Public Meeting Oct.5.2021 - Supporting Documents)
- ML24183A191 + (Ticket 200700062 Memorandum to Director, NRR Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2024)
- ML18292A822 + (Ticket LTR-18-0301-1-OCIO Ruffman)
- ML18113A596 + (Ticket OEDO-18-00114 - Response to Oig Audit of Regulatory Analysis Process (OIG-15-A-15))
- ML22143A877 + (Ticket OEDO-20-00244-OCIO: NRC-FERC MOU Extension Second Addendum Signed)
- ML071920536 + (Tides & Currents - 2006 Tidal Current Predictions)
- ML071920535 + (Tides & Currents - 2006 Water Level Tidal Predictions)
- ML20083D167 + (Tier 1 Design Certification Matl Pilot ITAAC Examples for GE Advanced BWR Design)
- ML20094E464 + (Tier 1 Design Certification Matl Pilot ITAAC Examples for GE Advanced BWR Design)
- ML20094P373 + (Tier 1 Design Certification Matl for GE Advanced BWR Design - Stage 2 Submittal)
- ML20097A373 + (Tier 1 Design Certification Matl for GE ABWR Design)
- ML23103A460 + (Tier 1 Vet Clinic; License No. 50-35660-01; Docket No. 030-39296; Control No. 634598; Cover Letter)
- ML23103A459 + (Tier 1 Vet Clinic; License No. 50-35660-01; Docket No. 030-39296; Control No. 634598; Amendment No. 2)
- ML23138A390 + (Tier 1 Veterinary Clinic; License No. 50-35660-01; Docket No. 030-39296; Control No. 635624; Cover Letter)
- ML23138A387 + (Tier 1 Veterinary Medical Center; License No. 50-35660-01; Docket No. 030-39296; Control No. 635624; Amendment No. 3)
- ML22045A981 + (Tier 1 Veterinary Medical Center; License No. 50-35660-01; Docket No. 030-39296; Control No. 629458; Cover Letter)
- ML22045A980 + (Tier 1 Veterinary Medical Center; License No. 50-35660-01; Docket No. 030-39296; Control No. 629458; New License)
- ML22179A146 + (Tier 1, Revision 10, Updated Through 04/22/2022)
- EPID:L-2022-LLA-0130 + (Tier 1, Revision 10, Updated Through 04/22/2022)
- ML24173A331 + (Tier 1; License No. 50-35660-01; Docket No. 030-39296; Control No. 640655; Amendment No. 4)
- ML18248A040 + (Tier 2 LAR for Vogtle)
- ML051960455 + (Tif and Gif Files for Use by Ms. Gloria Bennington)
- ML19280B313 + (Tiger Team Power Point)
- ML21220A047 + (Tilden Mining Company L.C. 21-26748-01 - Notice of License Expiration)
- ML24355A038 + (Tilow - Fragility Assessment of Anticipatory Automatic Seismic Trip Systems for Critical Facilities)
- 05000272/LER-2078-017-03, Tilt Ratio During Power Escalation + (Tilt Ratio During Power Escalation)
- ML20209A571 + (Tim Echols, Georgia Public Service Commission, Letter to FERC, Concerns Request to Deny Petition for Docket No. EL20-42-000)
- ML20080K168 + (Time Averaging of Local Vocal VOLUME-AVERAGED Conservation Equations of Multiphase Flow)
- ML20040C209 + (Time Dependent Unavailability of a Continuously Monitored Component)
- ML20304A117 + (Time Extension Request for LAR on Technical Specifications Surveillance Frequency Update for Improved Compliance Under 10 CFR 50.36(c)(3) for the Mit Research Reactor)
- EPID:L-2020-LLA-0149 + (Time Extension Request for LAR on Technical Specifications Surveillance Frequency Update for Improved Compliance Under 10 CFR 50.36(c)(3) for the Mit Research Reactor)
- ML040510008 + (Time Extension Request for Violation Response)
- NG-09-0663, Time Limited Aging Analysis Evaluations for the Duane Arnold License Renewal Project + (Time Limited Aging Analysis Evaluations for the Duane Arnold License Renewal Project)
- ML20259D247 + (Time Post DBA Dose Rate Study Accident Dose Map with Dose Table - Site Plan)
- ML17207A637 + (Time Response Testing of Resistance Temp Detectors)
- ML20207B262 + (Time Scales for Dissolution of Calcite Fracture Fillings & Implications for Saturated Zone Radionuclide Transport at Yucca Mountain,Nv)
- ML032060520 + (Time Scheduling Order, Dated 08/26/02)
- ML20097B429 + (Time Step and Mesh Size Dependencies in the Heat Conduction Solution of a SEMI-IMPLICIT,FINITE Difference Scheme for Transient TWO-PHASE Flow)
- ML20024C675 + (Time Vs Pressure Graph of Reactor Trip & Cooldown on 720423)
- ML20062E041 + (Time for Comm Consideration of Petition for Review of ALAB-502 Filed by Ecology Action of Oswego, & Any Answers Thereto,Is Extended to 781222)
- ML19256A902 + (Time for Commission Consideration of Petition Filed by Ecology Action of Oswego for Review of Decision ALAB-502 Is Extended to 790202)
- ML19256A365 + (Time for Commission Consideration of Petition Filed by Ecology Action of Oswego Seeking Review of Decision ALAB-507 Is Extended to 790112)
- ML19261A333 + (Time for Filing Direct Briefs on Review of Decision ALAB-500 Is Extended Until 790112.Reply Briefs Are Due within 10 Days After That Date)