Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24018A208 + (TRISO-X DOE NRC MOU Final Signed)
- ML25267A210 + (TRISO-X Draft EIS Letter to Oak Ridge Library)
- ML25267A208 + (TRISO-X Draft EIS Transmittal Letter to Applicant)
- ML22343A114 + (TRISO-X Environmental Impact Statement Notice of Intent Federal Register Notice Final)
- ML25122A176 + (TRISO-X Er Supplement Request for Additional Information May 2025)
- ML24059A443 + (TRISO-X Fff EIS RAIs Part 3 Final)
- ML25251A152 + (TRISO-X Fff EIS Updated Ipac 20250501)
- ML23235A226 + (TRISO-X Fff Environmental RAI Part 2)
- ML23342A214 + (TRISO-X Fff Environmental Review Request for Additional Information Part 2 -2)
- ML23234A124 + (TRISO-X Fff Initial Ipac for Section 7 Consultation)
- ML25267A128 + (TRISO-X Fuel Fabrication Facility Draft Environmental Impact Statement)
- ML23072A456 + (TRISO-X Fuel Fabrication Facility EIS RAI Part 1 Letter and Enclosure)
- PMNS20240021, TRISO-X Fuel Fabrication Facility Environmental Review - Requests for Additional Information + (TRISO-X Fuel Fabrication Facility Environmental Review - Requests for Additional Information)
- ML22266A270 + (TRISO-X Fuel Fabrication Facility Environmental Report Submittal)
- ML22266A269 + (TRISO-X Fuel Fabrication Facility Environmental Report Submittal)
- ML19011A193 + (TRISO-X Fuel Fabrication Facility Nuclear Criticality Safety Pre-Application Meeting with the NRC)
- ML23062A505 + (TRISO-X Fuel Fabrication Facility Scoping Meetings and Audit Summary - January 2023)
- ML23291A136 + (TRISO-X Fuel Fabrication Facility Tn SHPO Concurrence Letter)
- ML23355A245 + (TRISO-X Fuel Facility Resident Inspector Decision)
- ML18254A086 + (TRISO-X Overview)
- PMNS20250316, TRISO-X Overview of the Criticality Hazards by Process Area for the Proposed Fuel Fabrication Facility + (TRISO-X Overview of the Criticality Hazards by Process Area for the Proposed Fuel Fabrication Facility)
- ML22108A283 + (TRISO-X Press Releases)
- ML23019A020 + (TRISO-X Public Scoping Meeting Slides for January 25, 2023)
- ML24152A319 + (TRISO-X Request for Additional Information Supplement Request for Management Measures Rescheduling Draft Call and Response Deadline)
- ML24109A281 + (TRISO-X Request to Extend the Due Date for the Integrated Safety Analysis Summary RAI-10 Response to June 1, 2024)
- ML25239B560 + (TRISO-X, LLC - Response to Request for Additional Information Set 17 (Integrated Safety Analysis) for the TRISO-X License Application)
- ML24365A254 + (TRISO-X, LLC - Supplemental Information for the Triso-X Fuel Fabrication Facility License Application Review (Part 1))
- ML22101A205 + (TRISO-X, LLC Fuel Fabrication Facility License Application Submittal)
- ML22101A200 + (TRISO-X, LLC Fuel Fabrication Facility License Application Submittal)
- EPID:L-2022-NEW-0005 + (TRISO-X, LLC Fuel Fabrication Facility License Application Submittal)
- EPID:L-2022-LNE-0002 + (TRISO-X, LLC Fuel Fabrication Facility License Application Submittal)
- ML24365A255 + (TRISO-X, LLC – Cover Letter and Enclosure 1 Regarding Supplemental Information for the Triso-X Fuel Fabrication Facility License Application Review (Part 1))
- ML24263A112 + (TRISO-X, LLC, Additional Information for the Responses to Hydrology RAI-3 and RAI-4)
- ML24263A111 + (TRISO-X, LLC, Additional Information for the Responses to Hydrology RAI-3 and RAI-4)
- ML22286A146 + (TRISO-X, LLC, Affidavit)
- ML22273A105 + (TRISO-X, LLC, Fuel Fabrication Facility Online Reference Portal Information Access Agreement)
- ML23012A205 + (TRISO-X, LLC, Fuel Fabrication Facility Online Reference Portal Information Access Agreement (Fully Executed))
- ML23104A421 + (TRISO-X, LLC, Reference Material for Responses to Observation ER-GW-1 and RAIs ER-TES-1, ER-TES-2, and ER-TES-3)
- ML23349A208 + (TRISO-X, LLC, Response to Request for Additional Information Set 6 (Structural, Material Control and Accounting, and Fire Safety) for the TRISO-X License Application)
- ML23354A288 + (TRISO-X, LLC, Response to Request for Additional Information Part 2-1 for the TRISO-X Environmental Report and License Application)
- ML23104A420 + (TRISO-X, LLC, Response to Requests for Additional Information on the Environmental Report for the Proposed Fuel Fabrication Facility)
- ML23104A419 + (TRISO-X, LLC, Response to Requests for Additional Information on the Environmental Report for the Proposed Fuel Fabrication Facility)
- ML24060A239 + (TRISO-X, LLC, Submittal of Supplemental Information for the Electrical/I&C Review of IROFS for the TRISO-X License Application)
- ML24249A317 + (TRISO-X, LLC, Supplemental Information for Management Measures and Quality Assurance RAI Responses)
- ML060390541 + (TRM 1 - Technical Manual Unit 1, Rev. 2)
- 05000259/FIN-2014003-02 + (TRM Allowances Conflicting with Technical Specifications)
- 05000259/FIN-2014004-03 + (TRM Allowances for Electric Board Room Air Conditioning Units conflicting with Technical Specifications)
- ML032200317 + (TRM Approved Amendment to Units 1 & 2 Technical Requirements Manual, Effective 07/28/03)
- ML18270A241 + (TRM Change Report)
- ML12187A163 + (TRM Revision Update Instructions, Regional Library TRM, Rev. 22)
- ML031200039 + (TRM-U1, Technical Requirements Manual, Change No. 006-R1)
- ML021280527 + (TRM-U2, Revision No. 011, Change No. AP-11, Technical Requirements Manual (Unit 2))
- ML031690464 + (TRM-U2, Technical Requirements Manual, Change No. 014-R1 for Arkansas Nuclear One)
- ML060870452 + (TRM1 - Technical Requirements Manual Unit 1)