Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20150D542 + (Sys Energy Resources,Inc 1987 Annual Rept)
- ML20137Z837 + (Sys Engineering Mgt Plan for Ofc of Geologic Repositories)
- IR 05000298/1990031 + (Sys Entry & Retest Insp Rept 50-298/90-31 on 900910-14 & 17. No Violations Noted.Major Areas Inspected:Sys Entry Retest in Areas of Design Changes,Temporary Design Changes & Maint Activities)
- IR 05000285/1990004 + (Sys Entry Retest Insp Rept 50-285/90-04 on 900326-30. Weaknesses Identified.Major Areas Inspected:Design Changes, Temporary Alterations & Maint Activities)
- IR 05000482/1990009 + (Sys Entry Retest Insp Rept 50-482/90-09 on 900409-13.No Violations or Deviations Noted.Major Areas Inspected:Mods, Temporary Mods & Maint Activities)
- ML18052B462 + (Sys Evaluation Determining Max Differential Pressure for HPSI Sys Motor-Operated Valves & Auxiliary Feedwater Sys Motor-Operated Valves)
- ML20154C452 + (Sys Evaluation Document for Georgia Power Co for Ei Hatch Unit 1 for Reactor Recirculation Sys (B31))
- ML17339B217 + (Sys Flow Diagram:Condensate Polishing Demineralizer Sys)
- ML20155C273 + (Sys Functional Evaluation Long Term Commitments)
- ML19260C373 + (Sys Instrumentation & Controls Required to Go to Cold Shutdown from Outside Control Room)
- ML19290C384 + (Sys Interaction Analysis-SRP Task)
- ML19212A434 + (Sys Interaction Methodology Applications Program, Third Interim Rept.Prepared for Ofc of Stds Development)
- ML20070R942 + (Sys Interaction Program for Midland Units 1 & 2)
- ML20085C223 + (Sys Leak Tests for Dresden Units 2 & 3 Addition)
- ML19322C758 + (Sys Log Listing Primary & Secondary Event Status for Facility)
- ML20138K045 + (Sys Matls Analysis Dept Rept on Evaluation of Level Coatings in Zion Station Unit 2 Containment)
- ML17174A782 + (Sys Matls Analysis Dept Rept on Exam of Cracked Reactor Head Closure Stud from Dresden Unit 2)
- ML20059L138 + (Sys Operability Rept,Comm Ed Zion Nuclear Station Component Cooling Water Sys)
- ML20054L612 + (Sys Operators Procedures Manual 11.01,Power Sys Emergency Operation:Voltage Control Extra High Voltage Sys)
- ML18033A485 + (Sys Preoperability Checklist & Sys Plant Acceptance Evaluation Programs)
- ML20129D646 + (Sys Procedure Sp 1105.11, SPDS Operating Procedure)
- ML20129D681 + (Sys Procedure Sp 1105.20, Power Operated & Safety Relief Valve Monitoring Sys Operating Procedure)
- ML20052D371 + (Sys Protection & Lab Svcs VT-03 Exam Repts. Table Depicting Testing Frequency Schedule from 40-yr Master Plan Encl)
- ML20137J376 + (Sys Readiness Review Plan, Rev 1)
- ML20134N953 + (Sys Readiness Review Plan,Rev 0)
- ML20199K473 + (Sys Readiness Review Summary Rept)
- ML19332B243 + (Sys Response to Total Loss of Steam Generator Heat Sink. Related Correspondence)
- ML20027A767 + (Sys Response to Total Loss of Steam Generator Heat Sink)
- ML20237L637 + (Sys Review & Test Program Mgt Overview Manual)
- ML19308B767 + (Sys Safety Analysis Manual for Strategic Petroleum Reserve Ofc Drilling & Completion Operations, Prepared for DOE)
- ML19322C369 + (Sys Safety Engineering & Mgt)
- ML20148B552 + (Sys Stability Study,1980-1982)
- ML20057B084 + (Sys Unavailability Indicators,Vol 1,Summary Rept)
- ML20057B090 + (Sys Unavailability Indicators,Vol 2,Detailed Analysis & Appendices)
- ML20137N906 + (Sys Vertical Slice Review)
- ML19318B395 + (Sys for Continuous Measurement of Airborne Rn-222 Concentration & Working Level)
- ML20214N730 + (Sys for Damage Control After Rupture of Main Pipelines in Nuclear Power Plants W/VVER-440 (Water Moderated Water Cooled Power Reactors))
- ML20058J482 + (Sys of Containment Shell Depressurization & Filtration of Released Radioactive Products in Event of Serious Accidents at Nuclear Power Plants W/VVER-1000 Type Reactors)
- ML20058J804 + (Sys of Selection,Training,Control of Prof Activity, Maintainance of Prof Skill & Advanced Training of Operative Personnel at Nuclear Power Plants in Ussr)
- ML20002E393 + (Sys-80 Reactor Coolant Pump Loss of Component Cooling Water Test Rept)
- ML18018A990 + (System (Psys) Vs. Component (Comp) for Steps Preceeding Loss of Rod Position Indication (387 Lers))
- SCH15-036, System - New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report, NJPDES Permit NJ0005622 + (System - New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report, NJPDES Permit NJ0005622)
- ML20069N409 + (System 80+ Certified Design Material)
- ML20044G020 + (System 80+(TM) Containment -- Structural Design Review)
- ML13330B410 + (System Actuation Logic Auxil Feedwater System, as-built)
- ENS 53132 + (System Actuations Due to Opening of Feeder Breaker to Shutdown Board)
- ML20137R130 + (System Analysis Handbook)
- ML20107C607 + (System Analysis Handbook)
- ML20090J541 + (System Analysis and Risk Assessment System (Sara) Version 4.0.Reference Manual)
- ML20117N066 + (System Analysis and Risk Assessment System (Sara) Users Manual (Draft))
- ML20092C145 + (System Analysis and Risk Assessment System (Sara) Version 4.0.Tutorial)