Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Switchgear Room Door Discovered Unlatched". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20266F220  + (Switchgear Building General Arrangement Sections a & B. Sheet 5)
  • ML20266F204  + (Switchgear Building General Arrangement Plan - El 27 Ft-6 Inches. Sheet 2)
  • ML20266F200  + (Switchgear Building General Arrangement Plan - El 13 Ft-6 Inches. Sheet 1)
  • ML20266F380  + (Switchgear Building Grounding Plan)
  • ML20266F372  + (Switchgear Building Lighting Legend,Materials,Lighting Distribution Panels & Misc Details. Sheet 2)
  • ML20266F367  + (Switchgear Building Lighting Plan. Sheet 1)
  • ML20266F225  + (Switchgear Building Penetration Location Plan El 13 Ft-6 Inches. Sheet 1)
  • ML20266F235  + (Switchgear Building Penetration Location Roof - El 58 Ft-6 Inches & 58 Ft-6 Inches. Sheet 4)
  • ML20266F229  + (Switchgear Building Penetration Location Plan - El 27 Ft-6 Inches. Sheet 2)
  • ML20266F233  + (Switchgear Building Penetration Location Plan - El 41 Ft-6 Inches. Sheet 003)
  • ML20266F245  + (Switchgear Building Plan-Finish Grading & Drainage Drywells. Sheet 1)
  • ML20266F257  + (Switchgear Building Sheet Piling Plan - Sections & Details. Sheet 1)
  • ML20266F330  + (Switchgear Building Stairs Plans,Sections & Details. Sheet 1)
  • ML20266F313  + (Switchgear Building Steel Framing Floor El 27 Ft-6 Inches & 41 Ft-6 Inches. Sheet 1)
  • ML20266F317  + (Switchgear Building Steel Framing Roof Plan El 58 Ft-6 Inches. Sheet 2)
  • ML20266F277  + (Switchgear Building Wall Elevation - Col Ga Reinforcing - Embeds & Details. Sheet 5)
  • ML20266F272  + (Switchgear Building Wall Elevation - Col Gd Reinforcing - Embeds & Details. Sheet 4)
  • ML20266F292  + (Switchgear Building Wall Elevation Reinforcing - Embeds & Details. Sheet 8)
  • ML20266F282  + (Switchgear Building Wall Elevations - Col 13 1/2 & 14 3/4 Reinforcing - Embeds & Details. Sheet 6)
  • ML20266F287  + (Switchgear Building Wall Elevations - Col 14 1/4 & 14 1/2 Reinforcing - Embeds & Details. Sheet 7)
  • ENS 52354  + (Switchgear Cabinet Design Modification Required)
  • ML20266E195  + (Switchgear Diesel Generator & Electrical Penetration Area Tray & Conduit Layout Plan Elevation 1101 0 & 1013 0. Sheet 2)
  • Information Notice 1995-33, Switchgear Fire and Partial Loss of Offsite Power at Waterford Generating Station, Unit 3  + (Switchgear Fire and Partial Loss of Offsite Power at Waterford Generating Station, Unit 3)
  • ML20262G310  + (Switchgear Room & Turbine Bldg Fire Areas. Sheet 2 of 10)
  • ENS 48847  + (Switchgear Room Degraded Flood Seals)
  • ENS 49678  + (Switchgear Room Door Discovered Unlatched)
  • ENS 40596  + (Switchgear Rooms Flooding Analysis Concerns)
  • Information Notice 1993-66, Switchover to Hot-Leg Injection Following a Loss-Of-Coolant Accident in Pressurized Water Reactors  + (Switchover to Hot-Leg Injection Following a Loss-Of-Coolant Accident in Pressurized Water Reactors)
  • ML15071A018  + (Switchyard Area Synchronous Condenser)
  • ENS 53061  + (Switchyard Autotransformer Fire Due to Equipment Failure)
  • 05000482/FIN-2011004-01  + (Switchyard Component Failures Cause Loss of Ring Bus and Loss of Offsite Power)
  • ML041910356  + (Switchyard Disturbance on 07/07/2004)
  • 05000315/LER-2002-006, Switchyard Fire Results in Violation of Technical Specification 3.0.5  + (Switchyard Fire Results in Violation of Technical Specification 3.0.5)
  • ML20265D772  + (Switchyard General Arrangement)
  • ML20261F092  + (Switchyard General Arrangement)
  • Information Notice 1991-81, Switchyard Problems That Contribute to Loss of Offsite Power  + (Switchyard Problems That Contribute to Loss of Offsite Power)
  • 05000346/FIN-2009002-01  + (Switchyard Transformers Returned to Maintenance Rule A.2 Status Without Appropriate Corrective Actions Completed)
  • 05000440/FIN-2008006-01  + (Switchyard Voltage Found Outside Analyzed Maximum Limit)
  • ML20264A618  + (Switchyard,Grading & Drainage)
  • ML041100739  + (Swn Fire Hazards Analysis Calculation,Pages 15 and 16)
  • ML20073J851  + (Sworn Statements of Vh Tennyson & Re Roam Taken on Behalf of State of CA Re HP Foley Const Co Responsibilities at Plant, Including Electrical Work on Instrumentation.Certificate of Svc Encl.Related Correspondence)
  • ML19330A122  + (Sworn Testimony Re Technical Feasibility of Plant Location at Greater Distance from Residential & Populous Areas.Urges Analysis of Proposed Alternate Schemes to Determine Relative Merits)
  • ML19331B169  + (Sworn Testimony Stating That Plant Site Choice Is Contrary to Past Prohibitions & Site Plans Must Be Abandoned in Favor of Alternative Power Sources)
  • ML20235V478  + (Sworn Testimony of DA Reid,Jt Herron,Jk Thayer,Ch Hansen & PA Bergeron Submitted by Vermont Yankee Nuclear Power Corp Per 10CFR2.1113(a).* Certificate of Svc Encl)
  • ML20024E417  + (Sworn Testimony of R Messerly Re Const Qa/Qc)
  • ML20236D794  + (Sworn Testimony of Wk Sherman,Nuclear Engineer,State of VT, in Opposition to Testimony of DA Reid,Et Al,Vermont Yankee Nuclear Power Corp,Submitted Per 10CFR2.1113(a).* Certificate of Svc Encl.Related Correspondence)
  • ML20247A608  + (Sworn Written Rebuttal Testimony of DA Reid,Jt Herron, Jk Thayer,Ch Hansen & PA Bergeron Submitted by Vermont Yankee Nuclear Power Corp Per 10CFR2.1113(a).* Board Should Approve License Amend.Certificate of Svc Encl)
  • ML20244D551  + (Sworn Written Rebuttal Testimony of DA Reid,Ps Littlefield, DE Yasi & Kj Burns,Submitted by Vermont Yankee Nuclear Power Corp,Per 10CFR2.1113(a).* Discusses Spent Fuel Pool Expansion.W/Certificate of Svc)
  • ML20247L532  + (Sworn Written Testimony of DA Reid,Mj Marian,Rm Grube, Jm Buchheit,Rp Pizzuti & Ps Littlefield,Submitted by Vermont Yankee Nuclear Power Corp Per 10CFR2.11113(a).* Discusses Support of Environ Contention 3.Certificate of Svc Encl)
  • ML120100057  + (Swp Presentation for Meeting January 11, 2012 at 9am)
  • ML20090D141  + (Swp Strategies and Action Plan - Enclosure 2)