Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ND-18-0062, Supplement to Request for License Amendment: Human Factors Engineering Resolution Verification Process Revisions (LAR-17-030S1) + (Supplement to Request for License Amendment: Human Factors Engineering Resolution Verification Process Revisions (LAR-17-030S1))
- ND-18-0608, Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S2) + (Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S2))
- ML061780044 + (Supplement to Request for License Amendment Related to Application of Alternative Source Team, Dated February 27, 2004)
- HNP-08-019, Supplement to Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.5 + (Supplement to Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.5)
- ND-19-1177, Supplement to Request for License Amendment and Exemption: Addition of In-Containment Refueling Water Storage Tank to Radiation Analyses (LAR-19-003S1) + (Supplement to Request for License Amendment and Exemption: Addition of In-Containment Refueling Water Storage Tank to Radiation Analyses (LAR-19-003S1))
- ND-18-0571, Supplement to Request for License Amendment: Change to Battery Charger Output Amp Value in Technical Specification SR 3.8.1.2 and the Surveillance Frequency for SR 3.8.7.6 (LAR-18-003S1) + (Supplement to Request for License Amendment: Change to Battery Charger Output Amp Value in Technical Specification SR 3.8.1.2 and the Surveillance Frequency for SR 3.8.7.6 (LAR-18-003S1))
- ND-20-1005, Supplement to Request for License Amendment: Vacuum Relief Valve Technical Specification Changes (LAR-20-005S1) + (Supplement to Request for License Amendment: Vacuum Relief Valve Technical Specification Changes (LAR-20-005S1))
- RA-18-0027, Supplement to Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material + (Supplement to Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material)
- HNP-05-143, Supplement to Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools + (Supplement to Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools)
- ND-18-0111, Supplement to Request for License Amendment Regarding: Passive Residual Heat Removal Heat Transfer and In-containment Refueling Water Storage Tank Heat Up Test Acceptance Criteria Change (LAR-17-033S1) + (Supplement to Request for License Amendment Regarding: Passive Residual Heat Removal Heat Transfer and In-containment Refueling Water Storage Tank Heat Up Test Acceptance Criteria Change (LAR-17-033S1))
- ND-18-0097, Supplement to Request for License Amendment and Exemption Regarding Ventilation System Charges (LAR-16-030R1S1) + (Supplement to Request for License Amendment and Exemption Regarding Ventilation System Charges (LAR-16-030R1S1))
- ND-18-1067, Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S5) + (Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S5))
- ND-18-0347, Supplement to Request for License Amendment and Exemption Regarding Unqualified Service Level I Coatings Program + (Supplement to Request for License Amendment and Exemption Regarding Unqualified Service Level I Coatings Program)
- RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies + (Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies)
- RA-19-0243, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies + (Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies)
- RA-19-0411, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies + (Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies)
- RA-19-0479, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies + (Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies)
- ND-18-0199, Supplement to Request for License Amendment and Exemption Regarding Technical Specifications for Reactor Coolant System Vacuum Fill and Inspections, Tests, Analyses, and Acceptance Criteria for Containment Floodup (LAR-17-027S3) + (Supplement to Request for License Amendment and Exemption Regarding Technical Specifications for Reactor Coolant System Vacuum Fill and Inspections, Tests, Analyses, and Acceptance Criteria for Containment Floodup (LAR-17-027S3))
- ND-18-1006, Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S4) + (Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S4))
- ND-18-1180, Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S6) + (Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S6))
- ND-18-1038, Supplement to Request for License Amendment and Exemption: Fire Protection System Non-Safety Cable Spray Removal (LAR-18-015S1) + (Supplement to Request for License Amendment and Exemption: Fire Protection System Non-Safety Cable Spray Removal (LAR-18-015S1))
- RA-19-0157, Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time + (Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time)
- ML071700210 + (Supplement to Request for License Amendment Extended Power Uprate, C.D.I. Technical Note No. 07-01)
- ND-17-1519, Supplement to Request for License Amendment and Exemption Regarding Main Control Room Emergency Habitability System (Ves) Changes to Satisfy Post-Actuation Performance Requirements (LAR-17-001S1) + (Supplement to Request for License Amendment and Exemption Regarding Main Control Room Emergency Habitability System (Ves) Changes to Satisfy Post-Actuation Performance Requirements (LAR-17-001S1))
- ND-20-0093, Supplement to Request for License Amendment: Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (LAR-19-014S1) + (Supplement to Request for License Amendment: Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (LAR-19-014S1))
- L-16-304, Supplement to Request for License Amendment Approval Delay + (Supplement to Request for License Amendment Approval Delay)
- LR-N06-0346, Supplement to Request for License Amendment Ultimate Heat Sink + (Supplement to Request for License Amendment Ultimate Heat Sink)
- LR-N06-0259, Supplement to Request for License Amendment Ultimate Heat Sink + (Supplement to Request for License Amendment Ultimate Heat Sink)
- BSEP 14-0010, Supplement to Request for License Amendments - Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, AC Sources - Operating + (Supplement to Request for License Amendments - Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, AC Sources - Operating)
- BSEP 13-0054, Supplement to Request for License Amendments - Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, AC Sources - Operating + (Supplement to Request for License Amendments - Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, AC Sources - Operating)
- ND-19-1539, Supplement to Request for License Amendment and Exemption: Automatic Depressurization System (ADS) and Core Makeup Tank (Cmt) Design Parameters (LAR-19-009S1) + (Supplement to Request for License Amendment and Exemption: Automatic Depressurization System (ADS) and Core Makeup Tank (Cmt) Design Parameters (LAR-19-009S1))
- ND-20-0900, Supplement to Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR-20-004S1) + (Supplement to Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR-20-004S1))
- ND-18-0610, Supplement to Request for License Amendment: Technical Specification Applicability Changes to Support Pressurizer Safety Valve Operability (LAR-18-004S1) + (Supplement to Request for License Amendment: Technical Specification Applicability Changes to Support Pressurizer Safety Valve Operability (LAR-18-004S1))
- L-17-275, Supplement to Request for Licensing Action to Revise the Emergency Plan + (Supplement to Request for Licensing Action to Revise the Emergency Plan)
- RS-07-145, Supplement to Request for Proposed Alternative to Performance of System Pressure Tests and VT-2 Visual Examination Requirements for All Class 2 Instrument Air (IA) Piping and the Class 3 IA Piping Supplying All SRVs & Both Feedwater + (Supplement to Request for Proposed Alternative to Performance of System Pressure Tests and VT-2 Visual Examination Requirements for All Class 2 Instrument Air (IA) Piping and the Class 3 IA Piping Supplying All SRVs & Both Feedwater)
- ULNRC-06119, Supplement to Request for Relaxation from NRC Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation + (Supplement to Request for Relaxation from NRC Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation)
- NL-04-0537, Supplement to Request for Relaxation of the First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors + (Supplement to Request for Relaxation of the First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML031670940 + (Supplement to Request for Relaxation of Reactor Pressure Vessel Head Penetration Inspection Requirements in NRC Order)
- NL-09-022, Supplement to Request for Relief 3-48 and 3-47 (I) to Support Refuel Outage 15 Inservice Inspection Program + (Supplement to Request for Relief 3-48 and 3-47 (I) to Support Refuel Outage 15 Inservice Inspection Program)
- RBG-47233, Supplement to Request for Relief RBS-ISI-016 and RBS-ISI-017 Requests for Relief from ASME Code Section XI Inservice Inspection Requirements for Pressure Retaining Welds in Control Rod Housings and Pressure Retaining Welds in Pumps and Val + (Supplement to Request for Relief RBS-ISI-016 and RBS-ISI-017 Requests for Relief from ASME Code Section XI Inservice Inspection Requirements for Pressure Retaining Welds in Control Rod Housings and Pressure Retaining Welds in Pumps and Valv)
- NL-16-101, Supplement to Request for Relief Request IP2-ISl-RR-01 Examination of Upper Pressurizer Welds + (Supplement to Request for Relief Request IP2-ISl-RR-01 Examination of Upper Pressurizer Welds)
- RS-17-054, Supplement to Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces (RS-16-049) + (Supplement to Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces (RS-16-049))
- ML070850057 + (Supplement to Request for Relief from ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations)
- RNP-RA/10-0073, Supplement to Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, for the Fourth Ten-Year Inservice Inspection Program Interval (Relief Request No. RR-22) + (Supplement to Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, for the Fourth Ten-Year Inservice Inspection Program Interval (Relief Request No. RR-22))
- RNP-RA/10-0064, Supplement to Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, for the Fourth Ten-Year Inservice Inspection Program Interval (Relief Request No. RR-22) + (Supplement to Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, for the Fourth Ten-Year Inservice Inspection Program Interval (Relief Request No. RR-22))
- RNP-RA/10-0059, Supplement to Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, for the Fourth Ten-Year Inservice Inspection Program Interval (Relief Request No. RR-22) + (Supplement to Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, for the Fourth Ten-Year Inservice Inspection Program Interval (Relief Request No. RR-22))
- NOC-AE-07002224, Supplement to Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System + (Supplement to Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System)
- ML073100377 + (Supplement to Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System)
- ML072250407 + (Supplement to Request for Relief from ASME Section XI Code Requirements for Repair of Service Water Pipe)
- 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period + (Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period)
- ML25175A343 + (Supplement to Request for Relief from Flow Characterization and Flaw Removal Requirements of ASME Code, Section XI - Relief Relief 15R-02)