Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20357A390 + (Summary of December 7, 2020 Meeting with Framatome, Inc., Enclosure 1: Meeting Participants)
- ML20357A388 + (Summary of December 7, 2020, Meeting with Framatome)
- ML22021B294 + (Summary of December 7, 2021, Public Meeting with Exelon Generation Company, LLC Regarding Planned Digital Modernization License Amendment)
- ML21342A090 + (Summary of December 7, 2021, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Reactor Vessel Closure Head Nozzle Repair for Catawba Nuclear Station, Unit 2)
- ML21350A397 + (Summary of December 7, 2021, Public Meeting to Discuss Responses to Comments Received on the Draft Accident Tolerant Fuel Project Plan, Version 1.2)
- ML050180241 + (Summary of December 8, 2004, Category 1 Meeting with Entergy Nuclear Operations, on High-Pressure Coolant Injection (HPCI) Pump In-Service Testing Vibration)
- ML11363A190 + (Summary of December 8, 2011, Public Meeting to Obtain Comments Regarding the Draft Supplement to the Final Environmental Statement for Watts Bar Nuclear Plant, Unit 2)
- ML15364A448 + (Summary of December 8, 2015, Public Meeting Regarding License Amendment Request to Implement Risk-Informed Technical Specification Completion Times)
- ML22335A401 + (Summary of December 8, 2022, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Proposed License Amendment Request to Revise TS 3.7.11 Control Room Area Chilled Water System (Cracws))
- ML22335A408 + (Summary of December 8, 2022, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Proposed License Amendment Request to Revise TS 3.7.11 Control Room Area Chilled Water System (Cracws))
- EPID:L-2022-LRM-0086 + (Summary of December 8, 2022, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Proposed License Amendment Request to Revise TS 3.7.11 Control Room Area Chilled Water System (Cracws))
- ML22349A214 + (Summary of December 8, 2022, Public Meeting with Southern Nuclear Operating Company)
- ML16032A411 + (Summary of December 9, 2015 Meeting with Exelon Generation Company, LLC to Discuss Proposed Submittal Related to Secondary Containment Airlock Extension)
- ML21347A952 + (Summary of December 9, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming LAR to Adopt TSTF-567, Add Containment TS to Address GSI-191 Issues for Palo Verde Nuclear Generating Station, Units 1, 2, and 3)
- ML25015A058 + (Summary of December 9, 2024, Public Observation Pre-Submittal Meeting with Nextera Energy Seabrook, LLC, on a Proposed License Amendment Request to Revise Offsite AC Power Source Requirements)
- ML20030B755 + (Summary of December 9-11, 2019 - International Workshop on Advanced Non-Light Water Reactors - Materials and Component Integrity)
- ML24341A092 + (Summary of December Observation Meeting with Constellation Energy Generation, LLC on LAR to Support Replacement of Existing Safety-Related Analog Control Systems)
- ML20248D853 + (Summary of Decontamination of Labs 307/309 for Release to Unrestricted Use. Schematic of Drain Mod to Sealed Contaminated Plumbing Encl)
- ML20137Z547 + (Summary of Deficiency Rept Status,Including 55(e)-83-09 Re Nonconforming Matl Supplied by Tube Line Corp,55(e)-84-10 Re Back Pressure on Valves Furnished by Clow Corp & 55(e)-84-36 Re Schedule Changes for Certain Type Fire Dampers)
- ML19350C005 + (Summary of Degraded Cooling Steering Group 810303 Meeting Re Strategy to Assure Proper Coordination of NRC Efforts Related to Degraded Cooling & Associated Rulemakings)
- ML19343A836 + (Summary of Demineralization & Filtration Svcs)
- ML20080N494 + (Summary of Design Stds & Criteria for Technical Support Ctr Encompassing Human Factors Engineering)
- W3F1-2008-0037, Summary of Design and Analyses of Weld Overlays for Pressurizer and Hot Leg Nozzle Dissimilar Metal Welds for Alloy 600 Mitigation + (Summary of Design and Analyses of Weld Overlays for Pressurizer and Hot Leg Nozzle Dissimilar Metal Welds for Alloy 600 Mitigation)
- 2CAN040801, Summary of Design and Analyses of Weld Overlays for Hot Leg Nozzle Dissimilar Metal Welds for Alloy 600 Mitigation at ANO-2 + (Summary of Design and Analyses of Weld Overlays for Hot Leg Nozzle Dissimilar Metal Welds for Alloy 600 Mitigation at ANO-2)
- L-08-034, Summary of Design and Analyses of the Weld Overlays for Pressurizer and Hot Leg Nozzle Large Bore Dissimilar Metal Welds for Alloy 600 Mitigation + (Summary of Design and Analyses of the Weld Overlays for Pressurizer and Hot Leg Nozzle Large Bore Dissimilar Metal Welds for Alloy 600 Mitigation)
- L-10-133, Summary of Design and Analysis of Weld Overlays (Mode 4 Report) + (Summary of Design and Analysis of Weld Overlays (Mode 4 Report))
- ML082530112 + (Summary of Design and Stress Analyses of Weld Overlays of Dissimilar Metal Welds of Pressurizer and Hot Leg Nozzles)
- ML17083B214 + (Summary of Diablo Canyon Readiness for Operation 830907 Meeting in Util Public Info Ctr W/Licensee,,State of CA & Intervenor)
- ML21083A162 + (Summary of Digital Instrumentation and Controls Workshop Related to Lessons Learned and Insights Gained from the Use of the Alternate Review Process in Di&C ISG-06, Licensing Process, Revision 2)
- ML22104A086 + (Summary of Digital Instrumentation and Controls Public Workshop to Share NRC and Industry Perspectives on Licensing and Inspection Lessons Learned and Human Factor Engineering Reviews)
- ML20092P787 + (Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence)
- ML20092N491 + (Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence)
- ML20137C258 + (Summary of Directors Decision Under 10CFR2.206 of Mb Hobby & AL Mosbaugh,)
- ML19263D672 + (Summary of Discussion & 781107 Vote on SECY-78-504, Classification of Sensitive Safeguards Info. Separate Views of Commissioner Gilinsky Encl)
- ML23076A094 + (Summary of Discussion Between the NRC and EPRI Regarding RAI Responses Submitted on Report 3002018337, Use of Data Validation and Reconciliation Methods for Measurement Uncertainty Recaptutopical Report)
- ML23061A188 + (Summary of Discussion Between the U.S. Nuclear Regulatory Commission and Electric Power Research Institute Regarding Submittal of BWRVIP-138, Updated Jet Pump Beam Inspection and Evaluation Guidelines, Revision 2)
- ML20151U158 + (Summary of Discussion Faciliated Public Workshop on NRC Medical Rulemaking Initiative, Held at All Agreement States Meeting in Los Angeles,California on 971018)
- ML20151U144 + (Summary of Discussion Meeting of Advisory Committee on Medical Use of Isotopes Held on 970925-26 in Rockville,Md)
- ML17027A359 + (Summary of Discussion with Dominion, Areva and the NRC Realistic Large Break LOCA LAR - Identified Minor Error)
- ML20206P871 + (Summary of Discussion,Facilitated Part 35 Public Meeting with Representatives of Medical Boards, Held in Rockville, MD on 990217-18)
- ML20206P857 + (Summary of Discussion,Public Meeting of ACMUI Therapy Subcommittee, Held in Rockville,Md on 990225-26)
- ML20206P864 + (Summary of Discussion,Public Meeting of ACMUI Diagnostic Subcommittee, Held in Rockville,Md on 990223-24)
- ML071090059 + (Summary of Discussions Regarding the Fall 2006 Steam Generator Tube Inspections and Broken Batwings)
- ML20024B325 + (Summary of Discussions W/Toledo Edison Re Need to Reduce Steam Generator Level Setpoint for Natural Circulation & B&W Need to Maintain High Level)
- ML22204A004 + (Summary of Discussions and Status of Reference Request)
- ML20234D619 + (Summary of Div of Licensing & Regulation 630702 Meeting W/ Util in Chicago,Il Re Bodega Bay Seismic Problems.List of Attendees & Other Related Info Encl)
- ML20126D452 + (Summary of Div of Reactor Licensing 700728-29 Meeting in Los Angeles,Ca Re Exposed Fractures of Christiantos Fault)
- ML20126D519 + (Summary of Div of Reactor Licensing 720517 Meeting in Menlo Park,Ca Re Seismicity)
- ML15133A346 + (Summary of Drop-In Meeting with the Boiling Water Reactor Owners Group (BWROG) Finite Breaking Opening Time (Fbot) Committee)
- ML23080A261 + (Summary of Drop-In by Gle to Discuss Their Status and Plans for Future Licensing Actions, Held February 21, 2023)
- ML21176A010 + (Summary of Drop-in Meeting with NextEra-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications for Turkey Point Nuclear Plant, Units 3 & 4 (EPID L)