Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25083A271 + (Submittal of X Energy, LLC (X-energy), Xe-100 U.S. Regulatory Engagement Plan (REP) 2025)
- ML22364A278 + (Submittal of X Energy, LLC (X-energy), Xe-100 Licensing Topical Report: Xe-100 Training Program Methodology)
- ML22004A154 + (Submittal of X Energy, LLC (X-energy), Xe-100 White Paper: Physical Protection System Approach)
- ML23055B259 + (Submittal of X Energy, LLC (X-energy), Xe-100 U.S. Regulatory Engagement Plan (REP) 2023 Update)
- ML25262A202 + (Submittal of X-Energy, LLC (X-Energy) Xe-100 Licensing Topical Report Graphite Core Assembly Material Qualification and Design Methodologies, Revision 2)
- ML25262A201 + (Submittal of X-Energy, LLC (X-Energy) Xe-100 Licensing Topical Report Graphite Core Assembly Material Qualification and Design Methodologies, Revision 2)
- ML23317A095 + (Submittal of X-Energy, LLC, Xenithtm Microreactor Pre-Application Regulatory Engagement Plan (REP))
- ML24194A130 + (Submittal of X-energy, LLC, Xenithtm Topical Report on Analytical Methods)
- ML070470130 + (Submittal of YNPS-FSS-AUX0I-00 and YNS-FSS-NSY12-00, Final Status Survey Reports for Survey Areas AUX-01 and NSY-12, Respectively)
- ML070470110 + (Submittal of Yankee Nuclear Power Station Final Status Survey Report for Survey Area NOL-01)
- ML033450398 + (Submittal of Yankee Nuclear Power Stations License Termination Plan and Proposed Revision to Possession Only License)
- ML070470121 + (Submittal of Yankee Nuclear Power Station, Final Status Survey Report for Area WST-01)
- ZS-2018-0077, Submittal of ZS-QA-10, Quality Assurance Project Plan, Revision 10 + (Submittal of ZS-QA-10, Quality Assurance Project Plan, Revision 10)
- ZS-2012-0218, Submittal of Zion Nuclear Power Station, Units 1 and 2, 2011 Annual Radiological Environmental Operating Report + (Submittal of Zion Nuclear Power Station, Units 1 and 2, 2011 Annual Radiological Environmental Operating Report)
- RA-14-072, Submittal of a 30-Day 10 CFR 50.46 Report + (Submittal of a 30-Day 10 CFR 50.46 Report)
- ML11189A250 + (Submittal of a 30-Day Report to Identify Errors Addressed in General Electric Hitachi 50.46)
- ML031611031 + (Submittal of a Certified Copy of the Endorsement Detailing the Changes in the Subscribing Companies and in Their Proportionate Liability)
- ML18018B316 + (Submittal of a Copy of Each of Endorsement No. 46 and 47 to Maelu Policy No. MF-46 Which Set Forth the Amended Limit of Liability and Additional Premium Due for the Increased Limit)
- ML18018B315 + (Submittal of a Copy of Endorsement No. 58 to Nelia Policy No. NF-161 Amending the Premium for the Period from January 1, 1977 to January 1, 1978 to Reflect the Shutdown Credit for This Period)
- ML110400087 + (Submittal of a Copy of the Final Report for the Millstone Plume and Post Plume Biennial Exercise, Conducted on October 19-20, 2010, After Action Report/Improvement Plan)
- 3F0202-03, Submittal of a Maintenance Rule Frequently Asked Questions (FAQ) + (Submittal of a Maintenance Rule Frequently Asked Questions (FAQ))
- ML20325A026 + (Submittal of a Mark-Up to the Draft NRG-Proposed SHINE-Specific Security Measures)
- ML040920206 + (Submittal of a Request for Relief to the Requirements of 10CFR50.55a Concerning Fourth Ten-Year Interval Inservice Testing Program)
- ML21062A050 + (Submittal of a Revision 28 of the Limerock Generating Station Inservice Testing Program)
- ML21235A493 + (Submittal of a Version of Analysis and Measurement Services Corporation Topical Report AMS-TR-0720R2, Online Monitoring Technology to Extend Calibration Intervals of Nuclear Plant Pressure Transmitters (Docket No. 99902075))
- ZS-2013-0150, Submittal of an ASME NOG-1 Exception Request and Update to the Amendment to Approve Methods of Analysis, Use of the Upgraded Fuel Handling Building Crane System as a Single-Failure Proof Crane and Approval. + (Submittal of an ASME NOG-1 Exception Request and Update to the Amendment to Approve Methods of Analysis, Use of the Upgraded Fuel Handling Building Crane System as a Single-Failure Proof Crane and Approval.)
- GO2-09-153, Submittal of an Amendment Request for Approval of Cyber Security Plan + (Submittal of an Amendment Request for Approval of Cyber Security Plan)
- ML23205A238 + (Submittal of an Amendment Request for the NAC International Magnastor Cask System Amendment No. 14)
- EPID:L-2024-LLA-0158 + (Submittal of an Amendment Request for the NAC International Magnastor Cask System Amendment No. 14)
- ML091590040 + (Submittal of an Amendment to Table A-1 of License Renewal Application Amendment to LRA Commitment 61)
- W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 + (Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011)
- BSEP 08-0046, Submittal of an Update to Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors on Cycle 17 + (Submittal of an Update to Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors on Cycle 17)
- ML22110A025 + (Submittal of non-proprietary Presentation Titled, PWROG NRC Public Meeting RIPE G and GAET - April 21, 2022 - Final Slides for Nrc)
- L-17-298, Submittal of the 10-Year Interval Inservice Testing Programs + (Submittal of the 10-Year Interval Inservice Testing Programs)
- ML021070690 + (Submittal of the 2001 Annual Facility Technical Report for the Buffalo Materials Research Center at the State University of New York)
- ML021020167 + (Submittal of the 2001 Annual Facility Technical Report for the Buffalo Materials Research Center at the State University of New York)
- ML040960111 + (Submittal of the 2003 Annual Operating Report for the Alan J. Blotcky Reactor Facility)
- ML040650370 + (Submittal of the 2003 Annual Operating Report)
- ML040620649 + (Submittal of the 2003 Annual Report of Challenges to Pressurizer Power-Operated Relief Valves and Pressurizer Safety Valves)
- ML040620656 + (Submittal of the 2003 Annual Report of Primary Coolant Specific Activity)
- ML060750585 + (Submittal of the 2005 Engineering Programs Effectiveness Independent Assessment Report for the Davis-Besse Nuclear Power Station)
- GO2-07-078, Submittal of the 2006 Annual Environmental Operating Report + (Submittal of the 2006 Annual Environmental Operating Report)
- U-603815, Submittal of the 2006 Annual Radioactive Effluent Release Report + (Submittal of the 2006 Annual Radioactive Effluent Release Report)
- ML071550285 + (Submittal of the 2006 Engineering Programs Effectiveness Independent Assessment Report for the Davis-Besse Nuclear Power Station,)
- ML070520652 + (Submittal of the 2006 Organizational Safety Culture, Including Safety Conscious Work Environment, Independent Assessment Report and Accompanying Action Plan for the Davis-Besse Nuclear Power Station)
- L-08-005, Submittal of the 2007 Organizational Safety Culture and Safety Conscious Work Environment Independent Assessment Report for Davis-Besse + (Submittal of the 2007 Organizational Safety Culture and Safety Conscious Work Environment Independent Assessment Report for Davis-Besse)