Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML11256A049 + (Submittal of Pre-op Test Instruction No. 2-PTI-067-03, Rev. 0, ERCW Valve Logic Test)
- ML11363A010 + (Submittal of Pre-op Test Instruction No. 2-PTI-099-04, Rev 0, Safeguards System)
- ML103060112 + (Submittal of Pre-op Test Instruction, 2-PTI-286-01, Rev 0, Permanent Hydrogen Mitigation System)
- ML110550619 + (Submittal of Pre-op Test Instruction, 2-PTI-065-01, Revision 0)
- ML12163A371 + (Submittal of Pre-op Test Instruction, 2-PTI-067-01, Revision 0)
- ML11196A154 + (Submittal of Pre-op Test Instruction, 2-PTI-261-01, Rev. 0)
- ML12356A317 + (Submittal of Pre-op Test Instruction, 2-PTI-063-06, Revision 0, Safety Injection System Check Valve Test)
- ML11145A123 + (Submittal of Pre-op Test Instruction, 2-PTI-065-02, Rev. 0, Emergency Gas Treatment System Pressure Test)
- ML13196A376 + (Submittal of Pre-op Test Instructions)
- ML13175A131 + (Submittal of Pre-op Test Instructions)
- ML13162A309 + (Submittal of Pre-op Test Instructions)
- ML13148A010 + (Submittal of Pre-op Test Instructions)
- ML13050A395 + (Submittal of Pre-op Test Instructions)
- ML12083A125 + (Submittal of Pre-op Test Instructions)
- ML12041A393 + (Submittal of Pre-op Test Instructions)
- ML110691215 + (Submittal of Pre-op Test Instructions)
- ML110490437 + (Submittal of Pre-op Test Instructions)
- ML110450495 + (Submittal of Pre-op Test Instructions)
- ML12320A295 + (Submittal of Pre-op Test Instructions 2-PTI-003B-04, Auxiliary Feedwater Pumps & Valves Logic Test and 2-PTI-092-01, Power Range Nuclear Instrumentation)
- ML13091A037 + (Submittal of Pre-op Test Instructions for Condenser Vacuum and Flood Mode Boration)
- ML13127A214 + (Submittal of Pre-op Test Instructions, Rev. 0, 2-PTI-070-02A, Component Cooling System, Unit 2 Train a Flow Balance, Rev. 0, 2-PTI-070-02B, Component Cooling System, Train B Flow Balance)
- CNL-14-219, Submittal of Pre-operational Test Instruction, 2-PTI-999-02, Rv. 0, Thermal Expansion + (Submittal of Pre-operational Test Instruction, 2-PTI-999-02, Rv. 0, Thermal Expansion)
- CNL-15-024, Submittal of Pre-operational Test Instruction 2-PTI-043-02, Rev. 0, Primary Sampling System + (Submittal of Pre-operational Test Instruction 2-PTI-043-02, Rev. 0, Primary Sampling System)
- CNL-14-230, Submittal of Pre-operational Test Instruction, 2-PTI-074-02B, Rev. 0, RHR Hft Heatup/Cooldown + (Submittal of Pre-operational Test Instruction, 2-PTI-074-02B, Rev. 0, RHR Hft Heatup/Cooldown)
- CNL-15-025, Submittal of Pre-operational Test Instruction 2-PTI-999-01, Rev. 0, Operational Vibration Testing + (Submittal of Pre-operational Test Instruction 2-PTI-999-01, Rev. 0, Operational Vibration Testing)
- CNL-15-026, Submittal of Pre-operational Test Instruction + (Submittal of Pre-operational Test Instruction)
- ML041840125 + (Submittal of Preliminary Decommissioning Cost Estimate)
- ML041130434 + (Submittal of Preliminary Decommissioning Cost Estimate)
- TMI-09-051, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan + (Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan)
- RA-14-104, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan + (Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan)
- RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan + (Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan)
- NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan + (Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan)
- RS-24-135, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan + (Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan)
- EPID:L-2024-LLL-0025 + (Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan)
- ML102030131 + (Submittal of Preoperational Test Instructions)
- NRC-16-0054, Submittal of Preparation and Scheduling of Operator Licensing Examinations Response - NRC Form 536 + (Submittal of Preparation and Scheduling of Operator Licensing Examinations Response - NRC Form 536)
- NLS2011069, Submittal of Preparation and Scheduling of Operator Licensing Examinations Form 536 + (Submittal of Preparation and Scheduling of Operator Licensing Examinations Form 536)
- ML19332B230 + (Submittal of Prepared Testimony for First Hearing Session. No Attempts Made to Provide Complete Answers to ASLB 800908 Memorandum & Order Re Physical Separation of TMI Units. Certificate of Svc Encl.Related Correspondence)
- ULNRC-05691, Submittal of Present Level of Nuclear Property Insurance + (Submittal of Present Level of Nuclear Property Insurance)
- ML080300046 + (Submittal of Presentation Containing GEH Proprietary Information Requested by Advisory Committee on Reactor Safeguards)
- ML21123A259 + (Submittal of Presentation Information for the Pre-Application Meeting Regarding Use of Framatome Fuel at Callaway Plant)
- ML23229A600 + (Submittal of Presentation Material for Advisory Committee on Reactor Safeguards Subcommittee Meeting)
- ML18194A559 + (Submittal of Presentation Materials Titled, Line Breaks in NuScale Plant Status and Plans, Dated July 12, 2018)
- ML18360A177 + (Submittal of Presentation Materials Titled, Addressing Component Fatigue for NuScale DCA, PM-1218-63889, Rev. 0)
- ML24136A145 + (Submittal of Presentation Materials for Pre-submittal Meeting Regarding Kairos Powers Reactor Protection System Platform Topical Report)
- ML22172A169 + (Submittal of Presentation Slides for the Westinghouse-NRC Pre-Submittal Meeting on Topical Report CENPD-289-P/NP, Supplement 1, Use of Inert Replacement Rods in CE 16x16 Next Generation Fuel (Ngf) (EPID L-2022-TOP-0030) (Proprietary/Non-Pro)
- ML18261A203 + (Submittal of Presentation Westinghouse Encore Accident Tolerant Fuel (ATF) Development and Licensing Approach (Proprietary/Non-Proprietary))
- ND-20-0645, Submittal of Preservice Test Plan - Version 3.0 + (Submittal of Preservice Test Plan - Version 3.0)
- ND-22-0253, Submittal of Preservice Test Plan - Version 4.0 + (Submittal of Preservice Test Plan - Version 4.0)
- ML110830677 + (Submittal of Preservice Test Program Plan, Revision 1)
- BW150112, Submittal of Pressure and Temperature Limits Reports (Ptlrs), Revision 8 and Braidwood, Unit 2 - Pressure and Temperature Limits Reports (Ptlrs), Revision 7 + (Submittal of Pressure and Temperature Limits Reports (Ptlrs), Revision 8 and Braidwood, Unit 2 - Pressure and Temperature Limits Reports (Ptlrs), Revision 7)