Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-20-0010, Submittal of Plant Specific Emergency Core Cooling System (ECCS) Evaluation Model Reanalysis. Non-Proprietary GE Hitachi Nuclear Energy Report NEDO-33919 Enclosed + (Submittal of Plant Specific Emergency Core Cooling System (ECCS) Evaluation Model Reanalysis. Non-Proprietary GE Hitachi Nuclear Energy Report NEDO-33919 Enclosed)
- ML19284C118 + (Submittal of Plant-specific Emergency Action Levels in Accordance with License Condition 2.D(12)(d))
- ML043220082 + (Submittal of Point Beach Nuclear Plant Fish and Bird Report for Period June 1, 2001 Through December 31, 2001)
- L-25-189, Submittal of Post Accident Monitor Report + (Submittal of Post Accident Monitor Report)
- CNS-14-035, Submittal of Post Accident Monitoring (PAM) Report + (Submittal of Post Accident Monitoring (PAM) Report)
- NL-16-0810, Submittal of Post Accident Monitoring Report + (Submittal of Post Accident Monitoring Report)
- SVPLTR 16-0017, Submittal of Post Accident Monitoring Report Instrumentation + (Submittal of Post Accident Monitoring Report Instrumentation)
- L-16-213, Submittal of Post Examination Materials in Support of Recently Completed Initial License Operator Examinations + (Submittal of Post Examination Materials in Support of Recently Completed Initial License Operator Examinations)
- NMP2L2620, Submittal of Post Extended Power Uprate Steam Dryer Inspection Results and Long-term Steam Dryer Inspection Plan in Accordance with Operating License Conditions 2.C.(20)(f), 2.C.(20)(g) and 2.C.(20)(h) + (Submittal of Post Extended Power Uprate Steam Dryer Inspection Results and Long-term Steam Dryer Inspection Plan in Accordance with Operating License Conditions 2.C.(20)(f), 2.C.(20)(g) and 2.C.(20)(h))
- ML14216A347 + (Submittal of Post Extended Power Uprate Steam Dryer Inspection Results in Accordance with Operating License Condition 2.C.(20)(f) and 2.C.(20)(g))
- CPSES-200400172, Submittal of Post Irradiation Examination (Pie) Results of Fuel Cladding Following Cycle 7 Operation with Elevated Ph + (Submittal of Post Irradiation Examination (Pie) Results of Fuel Cladding Following Cycle 7 Operation with Elevated Ph)
- ML18233A398 + (Submittal of Post Outage 90-Day Inservice Inspection (ISI) Summary Report)
- ML083590349 + (Submittal of Post Shutdown Decommissioning Activities Report; Revision 1)
- ML15289A073 + (Submittal of Power Ascension Testing Results for Replacement Steam Dryer)
- ML023360238 + (Submittal of Power Measurement Uncertainty Calculation in Support of License Amendment Request for Appendix K Measurement Uncertainty Recapture Power Uprate Request)
- ML053540344 + (Submittal of Power Point Presentation Proposed Solutions to Part 21 on Safety Limit 2.1.1.1, NUREG-1433/34)
- RS-02-132, Submittal of Power Uprate Ascension Test Report for Quad Cities Nuclear Power Station, Unit 2 + (Submittal of Power Uprate Ascension Test Report for Quad Cities Nuclear Power Station, Unit 2)
- ML13333A269 + (Submittal of Pre-Op Test Instruction)
- ML12234A404 + (Submittal of Pre-Op Test Instruction)
- ML110880449 + (Submittal of Pre-Op Test Instruction)
- ML11227A254 + (Submittal of Pre-Op Test Instruction 2-PTI-072-02, Rev 0, Containment Spray System Air Flow Test)
- ML11111A122 + (Submittal of Pre-Op Test Instruction, 2-PTI-030H-01, Rev. 0, Lower Compartment Coolers)
- ML11231A667 + (Submittal of Pre-Op Test Instruction, 2-PTI-090-01, Revision 0, Radiation Monitors - Area Dose Rate)
- ML13226A130 + (Submittal of Pre-Op Test Instructions)
- ML110140346 + (Submittal of Pre-Op Test Instructions)
- CNL-15-047, Submittal of Pre-Operational Test Instruction, 2-PTI-062-03, Rev 0, Hft - Charging and Letdown + (Submittal of Pre-Operational Test Instruction, 2-PTI-062-03, Rev 0, Hft - Charging and Letdown)
- ML14055A275 + (Submittal of Pre-Operational Test Instructions, 2-PTI-063-01 and 2-PTI-068-11)
- ML14100A039 + (Submittal of Pre-Operational Test Instruction)
- ML14080A023 + (Submittal of Pre-Operational Test Instruction)
- ML14161A278 + (Submittal of Pre-Operational Test Lnstruction)
- ML13246A022 + (Submittal of Pre-op Test Instruction)
- ML13071A324 + (Submittal of Pre-op Test Instruction)
- ML12174A429 + (Submittal of Pre-op Test Instruction)
- ML12138A106 + (Submittal of Pre-op Test Instruction)
- ML11294A438 + (Submittal of Pre-op Test Instruction)
- ML11279A132 + (Submittal of Pre-op Test Instruction)
- ML11175A356 + (Submittal of Pre-op Test Instruction)
- ML11164A140 + (Submittal of Pre-op Test Instruction)
- ML110210112 + (Submittal of Pre-op Test Instruction)
- ML103610114 + (Submittal of Pre-op Test Instruction)
- ML102730530 + (Submittal of Pre-op Test Instruction 2-PTI-081-01, Rev. 0, Primary Makeup Water System)
- ML11256A049 + (Submittal of Pre-op Test Instruction No. 2-PTI-067-03, Rev. 0, ERCW Valve Logic Test)
- ML11363A010 + (Submittal of Pre-op Test Instruction No. 2-PTI-099-04, Rev 0, Safeguards System)
- ML103060112 + (Submittal of Pre-op Test Instruction, 2-PTI-286-01, Rev 0, Permanent Hydrogen Mitigation System)
- ML110550619 + (Submittal of Pre-op Test Instruction, 2-PTI-065-01, Revision 0)
- ML12163A371 + (Submittal of Pre-op Test Instruction, 2-PTI-067-01, Revision 0)
- ML11196A154 + (Submittal of Pre-op Test Instruction, 2-PTI-261-01, Rev. 0)
- ML12356A317 + (Submittal of Pre-op Test Instruction, 2-PTI-063-06, Revision 0, Safety Injection System Check Valve Test)
- ML11145A123 + (Submittal of Pre-op Test Instruction, 2-PTI-065-02, Rev. 0, Emergency Gas Treatment System Pressure Test)
- ML13196A376 + (Submittal of Pre-op Test Instructions)
- ML13175A131 + (Submittal of Pre-op Test Instructions)
- ML13162A309 + (Submittal of Pre-op Test Instructions)
- ML13148A010 + (Submittal of Pre-op Test Instructions)
- ML13050A395 + (Submittal of Pre-op Test Instructions)
- ML12083A125 + (Submittal of Pre-op Test Instructions)
- ML12041A393 + (Submittal of Pre-op Test Instructions)
- ML110691215 + (Submittal of Pre-op Test Instructions)
- ML110490437 + (Submittal of Pre-op Test Instructions)
- ML110450495 + (Submittal of Pre-op Test Instructions)
- ML12320A295 + (Submittal of Pre-op Test Instructions 2-PTI-003B-04, Auxiliary Feedwater Pumps & Valves Logic Test and 2-PTI-092-01, Power Range Nuclear Instrumentation)