Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-04-032, Submittal of Pennsylvania Department of Environmental Protection (DEP) General Information Form for the Amended Application for Beaver Valley Power Station, NPDES Permit No. PA0025615 + (Submittal of Pennsylvania Department of Environmental Protection (DEP) General Information Form for the Amended Application for Beaver Valley Power Station, NPDES Permit No. PA0025615)
- ML20283A772 + (Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020)
- L-2025-023, Submittal of Periodic Report + (Submittal of Periodic Report)
- ML17356A098 + (Submittal of Periodic Reports)
- L-2020-137, Submittal of Periodic Reports + (Submittal of Periodic Reports)
- L-2021-074, Submittal of Periodic Reports + (Submittal of Periodic Reports)
- L-2022-167, Submittal of Periodic Reports + (Submittal of Periodic Reports)
- L-2023-054, Submittal of Periodic Reports + (Submittal of Periodic Reports)
- ML24088A195 + (Submittal of Periodic Reports)
- ML21168A369 + (Submittal of Periodic Reports First Half 2021)
- ML23170A016 + (Submittal of Periodic Reports First Half 2023)
- ML24178A064 + (Submittal of Periodic Reports, First Half 2024)
- ML21102A342 + (Submittal of Periodic Update of the Final Safety Analysis Report)
- ML17361A079 + (Submittal of Permanently Defueled Emergency Plan Manual of Emergency Events, Revision 2)
- ML17116A317 + (Submittal of Permanently Defueled Emergency PLAN-1, Revision 3)
- ML073240614 + (Submittal of Permit No. 4911-033-0030-V-02-2 for the Construction and Operation of Temporary Boiler Package for Chemical Cleaning of Steam Generators)
- ML073240611 + (Submittal of Permit No. 4911-033-0030-V-02-1 for the Construction and Operation of Temporary Boiler Package for Chemical Cleaning of Steam Generators)
- ML073240689 + (Submittal of Permit to Operate the Southern Nuclear-Vogtle Makeup Water System)
- L-19-257, Submittal of Perry Nuclear Power Plant Inservice Testing Programs + (Submittal of Perry Nuclear Power Plant Inservice Testing Programs)
- RC-16-0020, Submittal of Personnel Changes + (Submittal of Personnel Changes)
- ML080930529 + (Submittal of Petitioners Westcan Et. Al.S Response to the Atomic Safety and Licensing Board Order of March 7, 2008 Re Indian Point License Renewal)
- ML12170A837 + (Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement)
- GO2-12-105, Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-33758 + (Submittal of Phase 2 Information in Support of License Amendment Request to Change Technical Specifications in Support of Prnm /Arts/Mellla Implementation; NEDO-33750, NEDO-33753; NEDO-33754: NEDO-33755; & NEDO-33758)
- CP-201500549, Submittal of Phase 2 Staffing Assessment Regarding Recommendation 9.3 (Staffing) and Updated Commitments Regarding Recommendation 9.3 (Communications and Staffing) + (Submittal of Phase 2 Staffing Assessment Regarding Recommendation 9.3 (Staffing) and Updated Commitments Regarding Recommendation 9.3 (Communications and Staffing))
- ML073240743 + (Submittal of Photocopies of the Highway Capacity Manual 2000)
- NRC-02-0007, Submittal of Physical Security Plan (Psp), Revision 39 + (Submittal of Physical Security Plan (Psp), Revision 39)
- ML060170315 + (Submittal of Physical Security Plan (Revision 2))
- ML020560206 + (Submittal of Physical Security Plan Revision 22, Security Force Training & Qualification Plan Revision 9, Safeguards Contingency Plan Revision 6)
- NL-03-108, Submittal of Physical Security Plan Revision 22 + (Submittal of Physical Security Plan Revision 22)
- ML021280460 + (Submittal of Physical Security Plan Revision 23)
- NL-03-109, Submittal of Physical Security Plan Revision 24 + (Submittal of Physical Security Plan Revision 24)
- 3F0702-05, Submittal of Physical Security Plan, Revision 7-9 from Florida Power for Cyrstal River Unit 3 + (Submittal of Physical Security Plan, Revision 7-9 from Florida Power for Cyrstal River Unit 3)
- NRC-10-0071, Submittal of Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Security and Contingency Plan for Independent Spent Fuel Storage Facilities, Revision 10 + (Submittal of Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Security and Contingency Plan for Independent Spent Fuel Storage Facilities, Revision 10)
- 3F0318-02, Submittal of Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5 + (Submittal of Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5)
- ML061380172 + (Submittal of Plant 2005 Annual Radiological Environmental Operating Report)
- NRC-08-0046, Submittal of Plant Specific Emergency Core Cooling System (ECCS) Evaluation Model Reanalysis + (Submittal of Plant Specific Emergency Core Cooling System (ECCS) Evaluation Model Reanalysis)
- NRC-20-0010, Submittal of Plant Specific Emergency Core Cooling System (ECCS) Evaluation Model Reanalysis. Non-Proprietary GE Hitachi Nuclear Energy Report NEDO-33919 Enclosed + (Submittal of Plant Specific Emergency Core Cooling System (ECCS) Evaluation Model Reanalysis. Non-Proprietary GE Hitachi Nuclear Energy Report NEDO-33919 Enclosed)
- ML19284C118 + (Submittal of Plant-specific Emergency Action Levels in Accordance with License Condition 2.D(12)(d))
- ML043220082 + (Submittal of Point Beach Nuclear Plant Fish and Bird Report for Period June 1, 2001 Through December 31, 2001)
- L-25-189, Submittal of Post Accident Monitor Report + (Submittal of Post Accident Monitor Report)
- CNS-14-035, Submittal of Post Accident Monitoring (PAM) Report + (Submittal of Post Accident Monitoring (PAM) Report)
- NL-16-0810, Submittal of Post Accident Monitoring Report + (Submittal of Post Accident Monitoring Report)
- SVPLTR 16-0017, Submittal of Post Accident Monitoring Report Instrumentation + (Submittal of Post Accident Monitoring Report Instrumentation)
- L-16-213, Submittal of Post Examination Materials in Support of Recently Completed Initial License Operator Examinations + (Submittal of Post Examination Materials in Support of Recently Completed Initial License Operator Examinations)
- NMP2L2620, Submittal of Post Extended Power Uprate Steam Dryer Inspection Results and Long-term Steam Dryer Inspection Plan in Accordance with Operating License Conditions 2.C.(20)(f), 2.C.(20)(g) and 2.C.(20)(h) + (Submittal of Post Extended Power Uprate Steam Dryer Inspection Results and Long-term Steam Dryer Inspection Plan in Accordance with Operating License Conditions 2.C.(20)(f), 2.C.(20)(g) and 2.C.(20)(h))
- ML14216A347 + (Submittal of Post Extended Power Uprate Steam Dryer Inspection Results in Accordance with Operating License Condition 2.C.(20)(f) and 2.C.(20)(g))
- CPSES-200400172, Submittal of Post Irradiation Examination (Pie) Results of Fuel Cladding Following Cycle 7 Operation with Elevated Ph + (Submittal of Post Irradiation Examination (Pie) Results of Fuel Cladding Following Cycle 7 Operation with Elevated Ph)
- ML18233A398 + (Submittal of Post Outage 90-Day Inservice Inspection (ISI) Summary Report)
- ML083590349 + (Submittal of Post Shutdown Decommissioning Activities Report; Revision 1)
- ML15289A073 + (Submittal of Power Ascension Testing Results for Replacement Steam Dryer)
- ML023360238 + (Submittal of Power Measurement Uncertainty Calculation in Support of License Amendment Request for Appendix K Measurement Uncertainty Recapture Power Uprate Request)