Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24191A372 + (Submittal of Deep Fission, Inc., White Paper Slides, Conceptual Design Review of the Deep Borehole Pressurized Water Reactor (DB-PWR))
- ML110950658 + (Submittal of Defect Discovered on Asea Brown Boveri ABB K600S 480 Vac Class 1E Breaker - Bell Alarm Switch Bracket Misalignment)
- RS-08-121, Submittal of Defueled Safety Analysis Report Update, Revision 5 Report of Changes, Tests and Experiments + (Submittal of Defueled Safety Analysis Report Update, Revision 5 Report of Changes, Tests and Experiments)
- ZS-2012-0376, Submittal of Defueled Safety Analysis Report Update, Revision 7 Report of Changes, Tests and Experiments + (Submittal of Defueled Safety Analysis Report Update, Revision 7 Report of Changes, Tests and Experiments)
- ML23213A234 + (Submittal of Defueled Safety Analysis Report and Decommissioning Quality Assurance Plan)
- RS-04-155, Submittal of Defueled Safety Analysis Report Update, Revision 3 Report of Changes, Tests and Experiments + (Submittal of Defueled Safety Analysis Report Update, Revision 3 Report of Changes, Tests and Experiments)
- ZS-2010-0329, Submittal of Defueled Safety Analysis Report Update, Revision 6, Report of Changes, Tests and Experiments + (Submittal of Defueled Safety Analysis Report Update, Revision 6, Report of Changes, Tests and Experiments)
- ZS-2016-0106, Submittal of Defueled Safety Analysis Report Update, Dated October 2016 - 10 CFR 50.59, and 10 CFR 72.48 Report of Changes, Tests and Experiments + (Submittal of Defueled Safety Analysis Report Update, Dated October 2016 - 10 CFR 50.59, and 10 CFR 72.48 Report of Changes, Tests and Experiments)
- ML18291B043 + (Submittal of Defueled Safety Analysis Report Update)
- ZS-2018-0065, Submittal of Defueled Safety Analysis Report Update + (Submittal of Defueled Safety Analysis Report Update)
- RS-16-117, Submittal of Defueled Safety Analysis Report Update, Revision 8 + (Submittal of Defueled Safety Analysis Report Update, Revision 8)
- ML20343A227 + (Submittal of Defueled Safety Analysis Report, Revised November 2020)
- ML20343A228 + (Submittal of Defueled Safety Analysis Report, Revised November 2020)
- ML20040C802 + (Submittal of Deposition & Exhibits of C Axtell,R Sinderman & D Blanchard,In Opposition to Motion for Summary Disposition of Oneill Contention Iib.Certificate of Svc Encl.Related Correspondence)
- ML18018B290 + (Submittal of Dept. of the Army Permit Allowing Application to Construct a Submerged Intake Structure and Discharge Structure Connected to Shore by Tunnel No. 1 and 2 in Lake Ontario)
- NOC-AE-09002424, Submittal of Description and Summary of the 10CFR50.59 Evaluations of Changes, Tests and Experiments Report + (Submittal of Description and Summary of the 10CFR50.59 Evaluations of Changes, Tests and Experiments Report)
- ML091280130 + (Submittal of Description and Summary of the 10CFR50.59 Evaluations of Changes, Tests and Experiments Report)
- ML22230A799 + (Submittal of Description of Change and Changed Pages for American Centrifuge Operating, LLC Security Plans/Program)
- ML20050C981 + (Submittal of Description of Change and Changed Pages to the Security Program for the American Centrifuge Plant - Security-Related Information, Official Use Only, and Export Controlled Information)
- ML24225A150 + (Submittal of Description of Change and Changed Pages for American Centrifuge Operating, LLC Security Plan/Program)
- ML24253A174 + (Submittal of Description of Change and Changed Pages for American Centrifuge Operating, LLC Security Plan/Program)
- CNS-16-061, Submittal of Design Basis Specification for the Plant Fire Protection Revision 25 + (Submittal of Design Basis Specification for the Plant Fire Protection Revision 25)
- ML12065A036 + (Submittal of Developmental Revision G of the Unit 2 Technical Specification (TS) and Technical Specification Bases)
- ML13357A048 + (Submittal of Developmental Revision H of the Technical Specification and Technical Specification Bases)
- ML14169A525 + (Submittal of Developmental Revision I of the Unit 2 Technical Specification (TS) and TS Bases and Developmental Revision D of the Unit 2 Technical Requirements Manual and Technical Requirements Manual Bases)
- ML030430463 + (Submittal of Diablo Canyon Independent Spent Fuel Storage Installation Reference Documents)
- SCH10-055, Submittal of Discharge Confirmation Report + (Submittal of Discharge Confirmation Report)
- ML13064A280 + (Submittal of Discharge Discharge Monitoring Report for January 2013)
- ML16347A660 + (Submittal of Discharge Monitor Report for November 2016)
- ML17125A257 + (Submittal of Discharge Monitoring Report)
- L-18-066, Submittal of Discharge Monitoring Report + (Submittal of Discharge Monitoring Report)
- L-16-292, Submittal of Discharge Monitoring Report + (Submittal of Discharge Monitoring Report)
- L-16-273, Submittal of Discharge Monitoring Report + (Submittal of Discharge Monitoring Report)
- L-16-245, Submittal of Discharge Monitoring Report + (Submittal of Discharge Monitoring Report)
- L-14-413, Submittal of Discharge Monitoring Report + (Submittal of Discharge Monitoring Report)
- SCH12-034, Submittal of Discharge Monitoring Report + (Submittal of Discharge Monitoring Report)
- L-11-217, Submittal of Discharge Monitoring Report + (Submittal of Discharge Monitoring Report)
- L-11-074, Submittal of Discharge Monitoring Report + (Submittal of Discharge Monitoring Report)
- ML20260H058 + (Submittal of Discharge Monitoring Report (Dmr), August 2020)
- ML22255A025 + (Submittal of Discharge Monitoring Report (Dmr), August 2022)
- ML24011A316 + (Submittal of Discharge Monitoring Report (Dmr), August 2023)
- ML24011A320 + (Submittal of Discharge Monitoring Report (Dmr), December 2023)
- ML22132A184 + (Submittal of Discharge Monitoring Report (Dmr), February 2022)
- ML19184A122 + (Submittal of Discharge Monitoring Report (Dmr), June 2019)
- ML22132A191 + (Submittal of Discharge Monitoring Report (Dmr), March 2022)
- ML24011A319 + (Submittal of Discharge Monitoring Report (Dmr), November 2023)
- ML24011A318 + (Submittal of Discharge Monitoring Report (Dmr), October 2023)
- ML24011A317 + (Submittal of Discharge Monitoring Report (Dmr), September 2023)
- L-13-167, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615)
- L-12-258, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615)
- L-09-198, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615)
- L-20-261, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615)
- L-21-043, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615)
- L-21-258, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615)
- L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615)
- L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615)
- L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615)
- L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615)
- L-10-254, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 + (Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615)