Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005G455 + (Submits Response to 890828 Supplemental Response Denying Violation 50-260/89-10-01.Requests Analysis That Existed Which Provided Adequate Assurance That EECW Discharge Lines Would Perform Intended Purpose After Design Basis Event)
- ELV-01376, Submits Response to 891121 Request for Addl Info Re Settlement Monitoring Program.Current Surveying Procedures Used by Plant to Monitor Settlement of Major Structures Outlined in Procedure 84301-C.W/41 Oversize Drawings + (Submits Response to 891121 Request for Addl Info Re Settlement Monitoring Program.Current Surveying Procedures Used by Plant to Monitor Settlement of Major Structures Outlined in Procedure 84301-C.W/41 Oversize Drawings)
- W3P90-1125, Submits Response to 900426 Comments Re Investigation Case 4-88-020.Util Issued P.O. Rev Downgrading Order of Circuit Breakers & Eliminating Nuclear Requirements + (Submits Response to 900426 Comments Re Investigation Case 4-88-020.Util Issued P.O. Rev Downgrading Order of Circuit Breakers & Eliminating Nuclear Requirements)
- ML20117G123 + (Submits Response to 950522 Se,Review of Responses to NRC SE Actions Items & Revised Relief Request for Plant Inservice Testing Program)
- ML20115H177 + (Submits Response to 960620 RAI Re Use of RELAP5YA-BWR Code for VT Yankee)
- ML20134F760 + (Submits Response to 960703 Ltr Re Radiological Status of Bedrock at Tuxedo,Ny Facility)
- ML20151M094 + (Submits Response to 970124 Application,Requesting Registration of Model TG-2 Gauging Device.Addl Info Requested in Order to Continue Evaluation)
- ML20135A782 + (Submits Response to 970206 RAI Re Hanford Incidental Waste Classification)
- ML18040A261 + (Submits Response to 970516 Telcon RAI Re Restart Following Repair of Weld Overlay.Calculation Re Size of Overlay,Encl)
- ML17059B563 + (Submits Response to 970516 Telcon RAI Re Restart Following Repair of Weld Overlay.Calculation Re Size of Overlay,Encl)
- ML20211F672 + (Submits Response to 970623 RAI Re TS Change Requests 95-19 for SQN & Change Request TS-372 for Bfn.Addl Info Includes References to Requirements Relocated to TVA Nuclear QA Plan)
- ML20217R052 + (Submits Response to 970813 RAI Re LAR ,discussing Changes to Section 4.12 of Plant TS That Would Allow Use of voltage-based SG Tube Repair Criteria)
- ML20216D096 + (Submits Response to 970822 RAI on License Amend Request Requesting to Allow Use of New SG Tube Sleeve Designs & Installation & Exam Techniques)
- TXX-9727, Submits Response to 970828 RAI Re Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Commitments Made by Util,Encl + (Submits Response to 970828 RAI Re Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Commitments Made by Util,Encl)
- ML20217G536 + (Submits Response to 970911 RAI Re Status of Health,Safety & Environ Programs at Paducah & Portsmouth Gaseous Diffusion Plants (Gdps).Info Provided for NRC Use in Preparing Annual Rept to Congress on GDPs)
- ML20247D739 + (Submits Response to 980330 & 0429 RAI Re North Anna PSA to Continue Review of Proposed TS Change.Proposed Change Would Establish 14-day Allowed Outage Time for Each EDG)
- ML20236X760 + (Submits Response to 980504 RAI Re GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. Rev 0 to SIR-98-079, Encl)
- GO2-98-145, Submits Response to 980514 RAI Re Reactor Pressure Vessel Integrity + (Submits Response to 980514 RAI Re Reactor Pressure Vessel Integrity)
- ML20249A420 + (Submits Response to 980515 RAI Re Licensee Submittal of Relief Request RV-05 for IST Program)
- ML17265A306 + (Submits Response to 980519 Telcon Discussion Between Util, Licensee & NRC on Util Spent Fuel Pool Rerack Safety Evaluation)
- ML20249C740 + (Submits Response to 980529 RAI Re GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps. Clarification of Licensee Response to Question 2,provided)
- ML20236R860 + (Submits Response to AL 98-03,re Estimate of New Licensing Actions to Be Submitted in Remainder of FY98 & FY99)
- ML20203P051 + (Submits Response to ASLB 860414 Proposed Memorandum & Order Posing 14 Questions Re Action Plan Ii.B.Certificate of Svc Encl)
- ML20217A431 + (Submits Response to Ack Ltrs on EA-97-222 & EA-97-223 for Units 1 & 2)
- ML20249A464 + (Submits Response to Action Items from 980513 Telcon Re TRs WCAP-14748/9, Justification of Increasing Postulated Break Opening Times in W Pwrs. Clarification of Scope of Request for Approval of Subject Trs,Provided)
- ST-HL-AE-5297, Submits Response to Addl Info Re Operations QA Plan Change QA-026 + (Submits Response to Addl Info Re Operations QA Plan Change QA-026)
- ML20056H446 + (Submits Response to Addl Info Request for Cnsi Topical Rept II - Waste Form Certification Program, Pozzolanic Binder Chemistry, for LOMI-on-BEAD-2 Data Submitted Jan 1993)
- ML20210D280 + (Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001)
- BSEP-99-0121, Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant + (Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant)
- ML20059B408 + (Submits Response to Administrative Ltr 93-03, Operator Licensing Natl Exam Schedule. Attachments Contain Proposed Schedule for Operator Licensing Exams,Requalification Exams & Generic Fundamental Exam)
- ML20211Q573 + (Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl)
- ML20210F588 + (Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates,)
- ML20247K110 + (Submits Response to All Agreement State Correspondence Ltr SP-98-025)
- ML17312B117 + (Submits Response to Branch Suggestions Pertaining to Graded QA Program)
- CY-97-078, Submits Response to CAL 1-97-07 Re Radiation Protection Improvement Plan Implementation + (Submits Response to CAL 1-97-07 Re Radiation Protection Improvement Plan Implementation)
- ML20149M087 + (Submits Response to CE Statement on Sleeping)
- ML20137G179 + (Submits Response to Case Request for Admission Items 14-17. Admission Recommended for Items 14-16.Admission for Item 17 Contingent on Inclusion of lead-in Sentence Marked on Encl. Related Info Encl)
- ML20149M084 + (Submits Response to Charge by NRC Inspector That Two Dresden Nuclear Plant Operators Were Sleeping on Job)
- ML20149D537 + (Submits Response to Co Dept of Health Comments on Supplemental Stds Application for 300 Block of Main Street)
- ML20199C568 + (Submits Response to Comments Re NRC SALP Repts 50-361/97-99 & 50-362/97-99,dtd 970729.SALP Board Concluded That No Change to Maint Category Rating or Engineering Category Rating Was Appropriate)
- ML18066A389 + (Submits Response to Concern Expressed in Insp Rept 50-255/98-06 Re Whether Palisades ISI Program Was Being Conducted IAW Applicable Requirements)
- ML19305E388 + (Submits Response to Concerning Procedure Used to Satisfy License Condition 7.8 Re Waste Compaction Sys. Procedures for Waste Compaction Currently Being Revised to Require Specific Mode of Operation)
- ML20216E748 + (Submits Response to Concerns Re Regulatory Guide 3.66 with Resident Authority on Decommissioning Funding Plan & Decommissioning Financial Assurance Guidance)
- NSD-NRC-97-5253, Submits Response to Concerns from Confirmatory Analysis of AP600 Soil Structure Interaction.Procedures for Development of Model Properties Described in Ssar,Subsection 3.7.2.3 + (Submits Response to Concerns from Confirmatory Analysis of AP600 Soil Structure Interaction.Procedures for Development of Model Properties Described in Ssar,Subsection 3.7.2.3)
- ML20196J187 + (Submits Response to Confirm Commitment That Annual Sampling of Fish Will Be re-instated as Part of REMP)
- ML19350C447 + (Submits Response to Contract NRC-02-80-076,Task II Re Purge of Radioactive Contaminants in Groundwater.High Concentration Levels in Wells T-2 & T-3 Are Attributed to Steady Source of Groundwater Contamination)
- ML20072C938 + (Submits Response to Demand for Info Dtd 940509.Licensee Appreciates Opportunity to Address Questions Posed)
- U-603027, Submits Response to Demand for Info Under 10CFR50.54(f) on Corrective Actions at Plant.Util Commitments in Response Listed in Attached Table 1 + (Submits Response to Demand for Info Under 10CFR50.54(f) on Corrective Actions at Plant.Util Commitments in Response Listed in Attached Table 1)
- ML19324B490 + (Submits Response to Describing Recent Meeting W/ G Mulley of Ofc of Inspector General.Inspector General Has No Objection to Making Investigation Rept Publicly Available However Certain Privacy Info May Be Deleted)
- ML19317D728 + (Submits Response to Deyoung .Review by B&W of Ability of out-of-core Detector Sys to Indicate Radial Tilts Shows Tech Spec 3.5.2 Limits Adequate)
- ML20024B027 + (Submits Response to Discussions Held During 661027 & 1107 Meetings Re Terms,Conditions & Previous Correspondence Concerning Proposal Re NSSS A4-7B Contract Terms)