Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Submits Response to Addl Info Re Operations QA Plan Change QA-026". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20005G455  + (Submits Response to 890828 Supplemental Response Denying Violation 50-260/89-10-01.Requests Analysis That Existed Which Provided Adequate Assurance That EECW Discharge Lines Would Perform Intended Purpose After Design Basis Event)
  • ELV-01376, Submits Response to 891121 Request for Addl Info Re Settlement Monitoring Program.Current Surveying Procedures Used by Plant to Monitor Settlement of Major Structures Outlined in Procedure 84301-C.W/41 Oversize Drawings  + (Submits Response to 891121 Request for Addl Info Re Settlement Monitoring Program.Current Surveying Procedures Used by Plant to Monitor Settlement of Major Structures Outlined in Procedure 84301-C.W/41 Oversize Drawings)
  • W3P90-1125, Submits Response to 900426 Comments Re Investigation Case 4-88-020.Util Issued P.O. Rev Downgrading Order of Circuit Breakers & Eliminating Nuclear Requirements  + (Submits Response to 900426 Comments Re Investigation Case 4-88-020.Util Issued P.O. Rev Downgrading Order of Circuit Breakers & Eliminating Nuclear Requirements)
  • ML20117G123  + (Submits Response to 950522 Se,Review of Responses to NRC SE Actions Items & Revised Relief Request for Plant Inservice Testing Program)
  • ML20115H177  + (Submits Response to 960620 RAI Re Use of RELAP5YA-BWR Code for VT Yankee)
  • ML20134F760  + (Submits Response to 960703 Ltr Re Radiological Status of Bedrock at Tuxedo,Ny Facility)
  • ML20151M094  + (Submits Response to 970124 Application,Requesting Registration of Model TG-2 Gauging Device.Addl Info Requested in Order to Continue Evaluation)
  • ML20135A782  + (Submits Response to 970206 RAI Re Hanford Incidental Waste Classification)
  • ML18040A261  + (Submits Response to 970516 Telcon RAI Re Restart Following Repair of Weld Overlay.Calculation Re Size of Overlay,Encl)
  • ML17059B563  + (Submits Response to 970516 Telcon RAI Re Restart Following Repair of Weld Overlay.Calculation Re Size of Overlay,Encl)
  • ML20211F672  + (Submits Response to 970623 RAI Re TS Change Requests 95-19 for SQN & Change Request TS-372 for Bfn.Addl Info Includes References to Requirements Relocated to TVA Nuclear QA Plan)
  • ML20217R052  + (Submits Response to 970813 RAI Re LAR ,discussing Changes to Section 4.12 of Plant TS That Would Allow Use of voltage-based SG Tube Repair Criteria)
  • ML20216D096  + (Submits Response to 970822 RAI on License Amend Request Requesting to Allow Use of New SG Tube Sleeve Designs & Installation & Exam Techniques)
  • TXX-9727, Submits Response to 970828 RAI Re Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Commitments Made by Util,Encl  + (Submits Response to 970828 RAI Re Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Commitments Made by Util,Encl)
  • ML20217G536  + (Submits Response to 970911 RAI Re Status of Health,Safety & Environ Programs at Paducah & Portsmouth Gaseous Diffusion Plants (Gdps).Info Provided for NRC Use in Preparing Annual Rept to Congress on GDPs)
  • ML20247D739  + (Submits Response to 980330 & 0429 RAI Re North Anna PSA to Continue Review of Proposed TS Change.Proposed Change Would Establish 14-day Allowed Outage Time for Each EDG)
  • ML20236X760  + (Submits Response to 980504 RAI Re GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. Rev 0 to SIR-98-079, Encl)
  • GO2-98-145, Submits Response to 980514 RAI Re Reactor Pressure Vessel Integrity  + (Submits Response to 980514 RAI Re Reactor Pressure Vessel Integrity)
  • ML20249A420  + (Submits Response to 980515 RAI Re Licensee Submittal of Relief Request RV-05 for IST Program)
  • ML17265A306  + (Submits Response to 980519 Telcon Discussion Between Util, Licensee & NRC on Util Spent Fuel Pool Rerack Safety Evaluation)
  • ML20249C740  + (Submits Response to 980529 RAI Re GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps. Clarification of Licensee Response to Question 2,provided)
  • ML20236R860  + (Submits Response to AL 98-03,re Estimate of New Licensing Actions to Be Submitted in Remainder of FY98 & FY99)
  • ML20203P051  + (Submits Response to ASLB 860414 Proposed Memorandum & Order Posing 14 Questions Re Action Plan Ii.B.Certificate of Svc Encl)
  • ML20217A431  + (Submits Response to Ack Ltrs on EA-97-222 & EA-97-223 for Units 1 & 2)
  • ML20249A464  + (Submits Response to Action Items from 980513 Telcon Re TRs WCAP-14748/9, Justification of Increasing Postulated Break Opening Times in W Pwrs. Clarification of Scope of Request for Approval of Subject Trs,Provided)
  • ML20056H446  + (Submits Response to Addl Info Request for Cnsi Topical Rept II - Waste Form Certification Program, Pozzolanic Binder Chemistry, for LOMI-on-BEAD-2 Data Submitted Jan 1993)
  • ML20210D280  + (Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001)
  • BSEP-99-0121, Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant  + (Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant)
  • ML20059B408  + (Submits Response to Administrative Ltr 93-03, Operator Licensing Natl Exam Schedule. Attachments Contain Proposed Schedule for Operator Licensing Exams,Requalification Exams & Generic Fundamental Exam)
  • ML20211Q573  + (Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl)
  • ML20210F588  + (Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates,)
  • ML20247K110  + (Submits Response to All Agreement State Correspondence Ltr SP-98-025)
  • ML17312B117  + (Submits Response to Branch Suggestions Pertaining to Graded QA Program)
  • CY-97-078, Submits Response to CAL 1-97-07 Re Radiation Protection Improvement Plan Implementation  + (Submits Response to CAL 1-97-07 Re Radiation Protection Improvement Plan Implementation)
  • ML20149M087  + (Submits Response to CE Statement on Sleeping)
  • ML20137G179  + (Submits Response to Case Request for Admission Items 14-17. Admission Recommended for Items 14-16.Admission for Item 17 Contingent on Inclusion of lead-in Sentence Marked on Encl. Related Info Encl)
  • ML20149M084  + (Submits Response to Charge by NRC Inspector That Two Dresden Nuclear Plant Operators Were Sleeping on Job)
  • ML20149D537  + (Submits Response to Co Dept of Health Comments on Supplemental Stds Application for 300 Block of Main Street)
  • ML20199C568  + (Submits Response to Comments Re NRC SALP Repts 50-361/97-99 & 50-362/97-99,dtd 970729.SALP Board Concluded That No Change to Maint Category Rating or Engineering Category Rating Was Appropriate)
  • ML18066A389  + (Submits Response to Concern Expressed in Insp Rept 50-255/98-06 Re Whether Palisades ISI Program Was Being Conducted IAW Applicable Requirements)
  • ML19305E388  + (Submits Response to Concerning Procedure Used to Satisfy License Condition 7.8 Re Waste Compaction Sys. Procedures for Waste Compaction Currently Being Revised to Require Specific Mode of Operation)
  • ML20216E748  + (Submits Response to Concerns Re Regulatory Guide 3.66 with Resident Authority on Decommissioning Funding Plan & Decommissioning Financial Assurance Guidance)
  • NSD-NRC-97-5253, Submits Response to Concerns from Confirmatory Analysis of AP600 Soil Structure Interaction.Procedures for Development of Model Properties Described in Ssar,Subsection 3.7.2.3  + (Submits Response to Concerns from Confirmatory Analysis of AP600 Soil Structure Interaction.Procedures for Development of Model Properties Described in Ssar,Subsection 3.7.2.3)
  • ML20196J187  + (Submits Response to Confirm Commitment That Annual Sampling of Fish Will Be re-instated as Part of REMP)
  • ML19350C447  + (Submits Response to Contract NRC-02-80-076,Task II Re Purge of Radioactive Contaminants in Groundwater.High Concentration Levels in Wells T-2 & T-3 Are Attributed to Steady Source of Groundwater Contamination)
  • ML20072C938  + (Submits Response to Demand for Info Dtd 940509.Licensee Appreciates Opportunity to Address Questions Posed)
  • U-603027, Submits Response to Demand for Info Under 10CFR50.54(f) on Corrective Actions at Plant.Util Commitments in Response Listed in Attached Table 1  + (Submits Response to Demand for Info Under 10CFR50.54(f) on Corrective Actions at Plant.Util Commitments in Response Listed in Attached Table 1)
  • ML19324B490  + (Submits Response to Describing Recent Meeting W/ G Mulley of Ofc of Inspector General.Inspector General Has No Objection to Making Investigation Rept Publicly Available However Certain Privacy Info May Be Deleted)
  • ML19317D728  + (Submits Response to Deyoung .Review by B&W of Ability of out-of-core Detector Sys to Indicate Radial Tilts Shows Tech Spec 3.5.2 Limits Adequate)
  • ML20024B027  + (Submits Response to Discussions Held During 661027 & 1107 Meetings Re Terms,Conditions & Previous Correspondence Concerning Proposal Re NSSS A4-7B Contract Terms)