Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115E902 + (Submits Facility Ol/Ts Change Implementation Sheet,Based on Amends 145 & 139 to Licenses)
- ML20147B336 + (Submits Facility Related Info Re Personnel Conduct & Emergency Support Organization Phone List)
- IA-87-498, Submits Facility Related Info Re Personnel Conduct & Emergency Support Organization Phone List + (Submits Facility Related Info Re Personnel Conduct & Emergency Support Organization Phone List)
- ML19329B360 + (Submits Facility SER Input Correction to 750814 Memo)
- ML19321B136 + (Submits Facility Status Rept as of 800704.Full Power Licensing Schedule Advanced 1-month to Meet Scheduled 801101 Start of Full Power Operation.Applicant Asked to Formally Request Fuel Loading & Low Power Testing License)
- ML19322D928 + (Submits Facsimile Request for Encl Info)
- ML20202E833 + (Submits Facsimile of from D Porterfield of Mas to L Santanam of Leis Re Results as of This Morning)
- ML19274G016 + (Submits Facts Re 790724 Communication W/Commissioners Concerning Memo of Understanding W/Equal Employment Opportunity Commission Proposing That Latter Investigate Individual Complaints of Discrimination Against NRC)
- ML15245A107 + (Submits Facts Re NRC Policy Concerning Implementation of General Design Criterion 3 for Fire Protection.Urges Completion of Mods Prior to Oct 1980.Submittal of Info Re Open Items & Design Details Should Be Expedited)
- ML19253A261 + (Submits Facts Re NRC Policy Concerning Implementation of General Design Criterion 3 for Fire Protection.Urges Maint of Mods Schedules for Oct 1980.Submittal of Info Re Open Items & Design Details Should Be Expedited)
- ML20073T088 + (Submits Facts Re Personnel Changes Since Close of Record on Mgt Issues,Per Licensee 811001 Procedures,For Info.Resumes & Svc List Encl)
- ML20091A942 + (Submits Failed Fuel Detection Rept,Per Tech Spec 6.7.C.2.3)
- ML20003D544 + (Submits Failed Fuel Evaluation Scope.Analyses Will Be Performed to Determine Unusual Trends & Fuel Will Be Visually Inspected.Feasibility Study of post-irradiation Examination Methods Will Be Conducted)
- ML20235U099 + (Submits Feasibility Study Re Suitability of State Dept of Public Works Garage Located in Wellesley,Ma as Potential Reception/Processing Ctr for Evacuees in Event of Accident at Facility)
- ML19263D045 + (Submits Feb 1979 Progress Rept for Houston Lighting & Power Co.Certificate of Svc Encl)
- ML19344B178 + (Submits Fee Determination Re 800821 Application for Amend to Licenses DPR-42 & DPR-60,authorizing Biannual Special Chlorination Programs.Proposed Actions Have No Environ Significance.Class I & II Fees Encl)
- ML18046B410 + (Submits Fee Determination Re Amends 62 & 59 to Licenses DPR-39 & DPR-48,respectively.Requests Addl Remittance Due)
- ML18139B624 + (Submits Fee Determinations for 800630 Application Re Net Positive Suction Head & 801114 Application Re Water Level Over Spent Fuel & Decay Heat Removal)
- ML20212J515 + (Submits Fee Proposal to Provide Architectural & Engineering Services as Described in Statement of Work for Listed Project)
- ML20005C179 + (Submits Fee for 811006 Request for Relief from ASME Section XI Requirements Involving Ultrasonic Insp of Reactor Vessel Ring Foregoing to Support Skirt Weld)
- ML20126K225 + (Submits Fee for 850412 Exemption Request Re Vessel Head Vents (10CFR50.44(c)(3)iii),per 850510 Request)
- ML20137Q631 + (Submits Fee for 851011 Application for Renewal of QA Program Approval for Radioactive Matl package:0192)
- ML20137Q625 + (Submits Fee for 851011 Application for Renewal of QA Program Approval for Radioactive Matl package:0192)
- ML20195G093 + (Submits Fee for 870211 Application for Amend to Certificate of Compliance 9181,per 870310 Request)
- 2CAN088706, Submits Fee for 870512 Application to Use Temper Bead Weld Repair Technique Described in Winter 1985 Edition of Section III of ASME Boiler & Pressure Code for Temporary Repair of Unit 2 Pressurizer + (Submits Fee for 870512 Application to Use Temper Bead Weld Repair Technique Described in Winter 1985 Edition of Section III of ASME Boiler & Pressure Code for Temporary Repair of Unit 2 Pressurizer)
- ST-HL-AE-2415, Submits Fee for 871009 Submittal of QA Program for Radwaste Mgt + (Submits Fee for 871009 Submittal of QA Program for Radwaste Mgt)
- A07027, Submits Fee for 871113 Application for NRC Review & Approval of Addendum to NUSCO-152,per RM Diggs 880122 Request. NUSCO-152 Demonstrated Util Ability to Perform PWR Reload Physics Design Using Westinghouse Physics Methodology + (Submits Fee for 871113 Application for NRC Review & Approval of Addendum to NUSCO-152,per RM Diggs 880122 Request. NUSCO-152 Demonstrated Util Ability to Perform PWR Reload Physics Design Using Westinghouse Physics Methodology)
- L-88-460, Submits Fee for 880527 Application for Review of Electrical Power Sys Enhancements + (Submits Fee for 880527 Application for Review of Electrical Power Sys Enhancements)
- ML20003A813 + (Submits Fee for Class III Request Re Delay on One Fire Protection Mod)
- ML19225C426 + (Submits Fee for Contingency Plan Submitted W/Amends 2 & 3 to Modified Amended Security Plan in Response to NRC 790703 Request.License Fee Paid Under Protest)
- ML20117H746 + (Submits Fee for OL Review.Concerns Raised Re Unit 2 Cancellation Date Vs Applicability of Charges After 831221)
- NL-89-372, Submits Fee for Proposed Amend 179 to License DPR-54.Fee Inadvertently Omitted from 890331 Submittal + (Submits Fee for Proposed Amend 179 to License DPR-54.Fee Inadvertently Omitted from 890331 Submittal)
- ML20246J045 + (Submits Fee for Renewal of QA Program Approval for Radioactive Matl packages:0215)
- ML20133J655 + (Submits Fee for Review of 850809 Submittal Re Use of New ASME Code Case N-411 on Damping Valves,Per 850911 Request)
- AECM-86-0020, Submits Fee for Review of Interplant Communication Sys Test Results Evaluation + (Submits Fee for Review of Interplant Communication Sys Test Results Evaluation)
- ML17209A578 + (Submits Fee,Per 800620 Amend Request Re Definition of Operability,In Response to)
- BVY-90-097, Submits Feedwater Check Valve Evaluation,In Response to Flaws Observed in Stellite Wear Pads During 1989 Outage + (Submits Feedwater Check Valve Evaluation,In Response to Flaws Observed in Stellite Wear Pads During 1989 Outage)
- ML19295E533 + (Submits Fees Incurred for CP Review from Application Filing to Date of Withdrawal.Draft Memo Encl)
- ML20086T521 + (Submits Fees Requested for 820630 Exemption Request,In Response to NRC)
- ML19343B643 + (Submits Fees Required for Tech Spec Change & Amend to License NPF-8)
- NRC-95-0108, Submits Fermi 2 Personnel Training & Qualification Plan, Rev 13 Per 10CFR50.54(p)(2).Plan Withheld + (Submits Fermi 2 Personnel Training & Qualification Plan, Rev 13 Per 10CFR50.54(p)(2).Plan Withheld)
- NRC-97-0098, Submits Fermi 2 Physical Security Plan,Rev 29,including Changes to Chapters 1,2,3,4,6,figures 1-3,2-2,2-6,2-8,table of Contents & List of Tables/Figures.Summary of Changes Made Provided & Changes to Text Are Highlighted.Plan Withheld + (Submits Fermi 2 Physical Security Plan,Rev 29,including Changes to Chapters 1,2,3,4,6,figures 1-3,2-2,2-6,2-8,table of Contents & List of Tables/Figures.Summary of Changes Made Provided & Changes to Text Are Highlighted.Plan Withheld)
- ML20137V994 + (Submits Fifteenth Rev of Updated SAR for CNS Per 10CFR50.71 (E))
- TXX-4228, Submits Fifth Biweekly Update on Status of Important schedule-related Issues for Sept 1984 Fuel Load.Diesel Generator Train B Operability Checks Completed on 840713. Control Room HVAC Now Appears to Be Critical Path + (Submits Fifth Biweekly Update on Status of Important schedule-related Issues for Sept 1984 Fuel Load.Diesel Generator Train B Operability Checks Completed on 840713. Control Room HVAC Now Appears to Be Critical Path)
- ML20032D753 + (Submits Fifth Interim Response to IE Bulletin 81-20.No Westinghouse Type W-2 Switches Identified at Facilities.Ge Still Awaiting Info from Other Vendors & Will Transmit Info to Util Upon Receipt)
- ML19296D981 + (Submits Fifth Monthly Rept for Project Steam Generator Tube Rupture Iodine Transport Mechanisms,Constituting Task 12 of Agreement NRC-04-76-293.Forwards Publication Release & Interim Rept)
- ML18092B419 + (Submits Fifth Monthly Rept on Status of Corrective Actions Taken in Response to 860826 Reactor Trip & False Blackout Signal at Salem Unit 2.Interim Evaluation Indicates That Configuration Stable Under Most Severe Transient Conditions)
- 0CAN068302, Submits Fifth Monthly Status Rept on Progress of Regulatory Response & Commitment Control Program,For 830514-0614. Rept on Passive Commitment Tracking Expected by 830801 + (Submits Fifth Monthly Status Rept on Progress of Regulatory Response & Commitment Control Program,For 830514-0614. Rept on Passive Commitment Tracking Expected by 830801)
- ML20031F851 + (Submits Fifth Periodic Rept Presenting Results of Ongoing Efforts to Detect Potential Radioactive Water Leakage from Containment Bldg)
- ML20195G396 + (Submits Fifth Periodic Rept of Status of Followup & Closeout of Comanche Peak Rept Review Group Recommendations. Related Info Encl)
- ML20055B832 + (Submits Fifth Quarterly Rept Re Const Completion Date.Unit 1 Fuel Load Date Delayed to 830831 Due to Piping Analysis Work)