Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20263J994 + (Starting Air Piping Schematic)
- ML20261F579 + (Starting Air Piping Schematic)
- ML20261E181 + (Starting Air Piping Schematic Zion Station Units 1 & 2.Sheet 11)
- 05000362/LER-2001-002, Starting the Movement of Irradiated Fuel with One Train of Pacu Inoperable Causes TS Violation + (Starting the Movement of Irradiated Fuel with One Train of Pacu Inoperable Causes TS Violation)
- ML20198J899 + (Startup & Power Ascension Plan)
- ML18106A672 + (Startup & Power Ascension Units 1 & 2)
- MNS-17-038, Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate + (Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate)
- ML20084C263 + (Startup Assessment Team (SAT) Review Final Rept)
- ML16340D283 + (Startup Assistance Visit to Diablo Canyon Power Plant, 820125-30)
- ML19093B092 + (Startup Certification Audit Examination at Surry Training Center Will Be Given on 09/12/1978)
- ML19207B263 + (Startup Data Rept for Nrc/Pacific Northwest Lab Halden Assembly IFA-513. (Rept Number Changed 790925))
- ML17299B051 + (Startup Experience Rept:Mgt Overview)
- ML20008E415 + (Startup Experiment Program for Yankee Reactor)
- IR 05000353/1989027 + (Startup Insp Rept 50-353/89-27 on 890911-12 & 14-15.No Violations Noted.Major Areas Inspected:Radiological Controls Programs,Including Shield Verification Surveys,Locked High Radiation Areas & Shipment of Intermediate Range Monitor)
- IR 05000443/1989018 + (Startup Insp Rept 50-443/89-18 on 891127-1201.No Violations Noted.Major Areas Inspected:Gaseous & Liquid Effluent Control & Radiological Environ Monitoring Programs Including Mgt Controls & Calibr of Effluent)
- ML20151P075 + (Startup Physics Test Program Apr 1988)
- ML20002E386 + (Startup Physics Test Rept Unit 1 Cycle 6)
- ML20063L726 + (Startup Physics Test Rept Unit 2 Cycle 16)
- ML20067E440 + (Startup Physics Test Rept, Re Verifying Adequacy of Cycle 3 Reload Core Design.Each Test Performed Indicated Measured Parameters Which Were within Specified Acceptance Criteria)
- ML18152A057 + (Startup Physics Test Rept,Surry Unit 1,Cycle 14)
- ML20244B682 + (Startup Physics Test Rept,Unit 2,Cycle 11)
- ML19309H642 + (Startup Physics Test Rept,Unit 2,Cycle 5 Startup)
- ML20008F816 + (Startup Physics Test Rept,Unit 2,Cycle 6)
- ML17254A890 + (Startup Physics Testing Program)
- ML19249D887 + (Startup Physics Testing Program for Cycle 7,summary Rept)
- L-96-265, Startup Physics Testing Rept + (Startup Physics Testing Rept)
- ML20073D586 + (Startup Physics Testing Rept Unit 1 Cycle 17)
- ML20077S455 + (Startup Physics Testing Rept,Cycle 17)
- W3F1-2008-0057, Startup Power Escalation Report for Cycle 16 + (Startup Power Escalation Report for Cycle 16)
- ML19308C098 + (Startup Problem Rept 2690 Re Lack of Proper Overpressure Protection on WDL-C-1A/B Tube Side)
- ML20125B453 + (Startup Problem Rept 2690:on 780222,WDL-C-1A/B Tube Side Did Not Have Proper Overpressure Protection.Burns & Roe Proposed Solution on 780405.Action Completed Satisfactorily on 780428)
- ML19308C102 + (Startup Problem Rept 5314 Re Acceptability of Max Flow Rate in Radwaste Gas Sys.Burns & Roe Judged Rate Acceptable)
- ML20125B458 + (Startup Problem Rept 5314:on 780314,radwaste Gas Release Rate of 90 Scfm Could Not Be Obtained.On 780317,flow Rate of 65 Scfm Determined Acceptable by Burns & Roe)
- ML19246A368 + (Startup Problem Rept Re Auxiliary Bldg Heating & Ventilation Sys)
- ML20125B478 + (Startup Problem Rept Re Condensate)
- ML20037B702 + (Startup Problem Rept for Facility)
- ML18082A931 + (Startup Procedure 90.0,Revision 2, Special Tests Sequence Document)
- ML18082A933 + (Startup Procedure 90.1,Revision 2, Natural Circulation Test)
- ML18082A934 + (Startup Procedure 90.2,Revision 2, Natural Circulation W/ Simulated Loss of Offsite AC Power)
- ML18082A936 + (Startup Procedure 90.3,Revision 2, Natural Circulation W/ Loss of Pressurizer Heaters)
- ML18082A937 + (Startup Procedure 90.4,Revision 2, Effect of S/G Secondary Side Isolation on Natural Circulation)
- ML19331C787 + (Startup Procedure 90.5,Revision 2, Natural Circulation at Reduced Pressure)
- ML18082A938 + (Startup Procedure 90.6,Revision 2, Cooldown Capability of Charging & Letdown)
- ML18082A939 + (Startup Procedure 90.7,Revision 2, Simulated Loss of All Onsite & Offsite Ac Power)
- 05000352/FIN-2015001-02 + (Startup Procedure Considered High Pressure Coolant Injection Operable with High Reactor Water Level Trip Actuated Preventing High Drywell Pressure Automatic Actuation)
- ML20212N392 + (Startup Procedures for Critical Facility)
- ML20127D007 + (Startup Program Rept,Jul 1982. Incomplete 791031 Press Release I-79-144 Encl)
- ML050050466 + (Startup Readiness)
- ML20115J189 + (Startup Readiness Evaluation (Sure) for James a Fitzpatrick Nuclear Power Plant)
- LR-N05-0015, Startup Readiness Supplemental Information + (Startup Readiness Supplemental Information)
- ML050120156 + (Startup Readiness Supplemental Information)