Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Startup Physics Testing Rept". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20073D586  + (Startup Physics Testing Rept Unit 1 Cycle 17)
  • ML20077S455  + (Startup Physics Testing Rept,Cycle 17)
  • W3F1-2008-0057, Startup Power Escalation Report for Cycle 16  + (Startup Power Escalation Report for Cycle 16)
  • ML19308C098  + (Startup Problem Rept 2690 Re Lack of Proper Overpressure Protection on WDL-C-1A/B Tube Side)
  • ML20125B453  + (Startup Problem Rept 2690:on 780222,WDL-C-1A/B Tube Side Did Not Have Proper Overpressure Protection.Burns & Roe Proposed Solution on 780405.Action Completed Satisfactorily on 780428)
  • ML19308C102  + (Startup Problem Rept 5314 Re Acceptability of Max Flow Rate in Radwaste Gas Sys.Burns & Roe Judged Rate Acceptable)
  • ML20125B458  + (Startup Problem Rept 5314:on 780314,radwaste Gas Release Rate of 90 Scfm Could Not Be Obtained.On 780317,flow Rate of 65 Scfm Determined Acceptable by Burns & Roe)
  • ML19246A368  + (Startup Problem Rept Re Auxiliary Bldg Heating & Ventilation Sys)
  • ML20125B478  + (Startup Problem Rept Re Condensate)
  • ML20037B702  + (Startup Problem Rept for Facility)
  • ML18082A931  + (Startup Procedure 90.0,Revision 2, Special Tests Sequence Document)
  • ML18082A933  + (Startup Procedure 90.1,Revision 2, Natural Circulation Test)
  • ML18082A934  + (Startup Procedure 90.2,Revision 2, Natural Circulation W/ Simulated Loss of Offsite AC Power)
  • ML18082A936  + (Startup Procedure 90.3,Revision 2, Natural Circulation W/ Loss of Pressurizer Heaters)
  • ML18082A937  + (Startup Procedure 90.4,Revision 2, Effect of S/G Secondary Side Isolation on Natural Circulation)
  • ML19331C787  + (Startup Procedure 90.5,Revision 2, Natural Circulation at Reduced Pressure)
  • ML18082A938  + (Startup Procedure 90.6,Revision 2, Cooldown Capability of Charging & Letdown)
  • ML18082A939  + (Startup Procedure 90.7,Revision 2, Simulated Loss of All Onsite & Offsite Ac Power)
  • 05000352/FIN-2015001-02  + (Startup Procedure Considered High Pressure Coolant Injection Operable with High Reactor Water Level Trip Actuated Preventing High Drywell Pressure Automatic Actuation)
  • ML20212N392  + (Startup Procedures for Critical Facility)
  • ML20127D007  + (Startup Program Rept,Jul 1982. Incomplete 791031 Press Release I-79-144 Encl)
  • ML050050466  + (Startup Readiness)
  • ML20115J189  + (Startup Readiness Evaluation (Sure) for James a Fitzpatrick Nuclear Power Plant)
  • LR-N05-0015, Startup Readiness Supplemental Information  + (Startup Readiness Supplemental Information)
  • ML050120156  + (Startup Readiness Supplemental Information)