Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML030090449 + (STP, Units 1 & 2, Amendment No. 146 & 134 to TS 3/4 7-4 Regarding Allowed Outage Time (AOT) for Auxiliary Feedwater Pumps (AFW) from 72 Hours to 28 Days (TAC Nos. MB3586 & MB3590))
- ML020160520 + (STP, Units 1 and 2 - TS for Amendments No. 135 and 124)
- NOC-AE-02001421, STP, Units 1 and 2 Request for Relief for ASME Section XI Requirements for Repair of Control Rod Drive Mechanism (CRDM) Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval + (STP, Units 1 and 2 Request for Relief for ASME Section XI Requirements for Repair of Control Rod Drive Mechanism (CRDM) Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval)
- ML023020252 + (STP, Units 1 and 2 Request for Relief for ASME Section XI Requirements for Repair of Control Rod Drive Mechanism (CRDM) Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval)
- ML11269A063 + (STP, Units 1 and 2, Lr Environmental Review)
- ML071630236 + (STP-11-2005-Public Forms)
- ML073030316 + (STP-11/07-Examination Approval Letter)
- ML101370641 + (STP-2010-05 - Exam Approval Letter)
- ML112620191 + (STP-2011/11- Examination Approval)
- ML19247D686 + (STP-2019-07 Draft Operating Test)
- ML19247D685 + (STP-2019-07 Draft Operating Test Comments)
- ML19247D688 + (STP-2019-07 Draft Outline Comments)
- ML19247D690 + (STP-2019-07 Draft Outlines)
- ML19247D692 + (STP-2019-07 Draft Written Examination)
- ML19247D691 + (STP-2019-07 Draft Written Examination Comments)
- ML19247D693 + (STP-2019-07 Final Operating Test)
- ML19247D694 + (STP-2019-07 Final Outlines)
- ML19247D696 + (STP-2019-07 Final Written Examination)
- ML19247D698 + (STP-2019-07 Post Examination Analysis)
- ML19247D699 + (STP-2019-07 Public Forms)
- ML24271A302 + (STP-2024-09 Post-Exam Comments - Redacted)
- ML022770294 + (STP-Control of Heavy Loads-Email Dated Sept. 24, 2002 at 2:08 PM from Robyn Piggott - Response to Additional Information)
- ML12157A227 + (STP-RAIs-Set 21-RAI for the Review of the South Texas Project, Units 1 & 2, License Renewal Application - Aging Management)
- NOC-AE-14003081, STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4 + (STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4)
- ML14052A054 + (STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4)
- IR 05000498/2020003 + (STP2020003-RP-GK (Revised 2), Reissued Integrated Inspection Report 5000498/2020003 and 05000499/2020003)
- NOC-AE-18003591, STPNOC Agreement for Disposal of Very Low-Level Radioactive Material + (STPNOC Agreement for Disposal of Very Low-Level Radioactive Material)
- ML18226A352 + (STPNOC Agreement for Disposal of Very Low-Level Radioactive Material)
- ML23219A216 + (STPNOC Answer Opposing Motions to Dismiss and Stay by CPS Energy and Austin)
- NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency + (STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency)
- ML20345A354 + (STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency)
- ML15244B081 + (STPNOC Motion for Leave to Intervene)
- NOC-AE-13002958, STPNOC Response to January 23, 2013, Request for Additional Information Related to the Near-Term Task Force Recommendation 9.3 on Communications + (STPNOC Response to January 23, 2013, Request for Additional Information Related to the Near-Term Task Force Recommendation 9.3 on Communications)
- ML13092A258 + (STPNOC Response to January 23, 2013, Request for Additional Information Related to the Near-Term Task Force Recommendation 9.3 on Communications)
- NOC-AE-13002952, STPNOC Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach + (STPNOC Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach)
- ML13037A107 + (STPNOC Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach)
- ML13346A264 + (STPNOC Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns)
- ML22231A469 + (STPNOC Response to Request for Additional Information Regarding Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material)
- NOC-AE-13003027, STPNOC South Texas Project Units 1 & 2 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Ord + (STPNOC South Texas Project Units 1 & 2 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Numb)
- ML13249A060 + (STPNOC South Texas Project Units 1 & 2 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Numb)
- ML20212N048 + (STRESS-CORROSION Cracking of LOW-STRENGTH Carbon Steels in Candidate HIGH-LEVEL Waste Repository Environments)
- ML20101G229 + (STRESS-CORROSION-CRACKING Studies on Candidate Container Alloys for the Tuff Repository)
- ML20100C815 + (STRESS-INTENSITY-FACTOR Influence Coefficients for Surface Flaws in Pressure Vessels)
- ML20037A458 + (STS 3.4 & 4.4 for Facility)
- ML20033A279 + (STS 3/4 Re Action Statements & Radiation Monitoring Instrumentation)
- ML20009D042 + (STS 5-4 Re Control Element Assembly Guide Tube Sleeving)
- ML20031E461 + (STS Page 3/4.3.3 Re Radiation Monitoring Instrumentation)
- ML19305D218 + (STS Pages 3/4 4-17,3/4 4-18,3/4 4-3 & 3/44 4-4 Re Steam Generator Insp)
- ML20058G219 + (STS Pages 3/4 9-8 & 3/4 9-9 Re Refueling Operations)
- ML20141F620 + (STS Re Containment & Drywell Hydrogen Ignition Sys)
- ML19331D904 + (STS Re Fire Protection)
- ML19338E483 + (STS Re Fire Protection)