Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML050250290 + (Risk-Informed Technical Specification Task Force)
- NL-19-0221, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI) + (Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI))
- LR-N04-0113, Risk-Informed Technical Specifications Pilot Plant Request for Fee Waiver + (Risk-Informed Technical Specifications Pilot Plant Request for Fee Waiver)
- ML062060042 + (Risk-Informed Technical Specifications Task Force, Summary of Meeting on June 29, 2006)
- ML17265A846 + (Risk-Informed Thinking Workshop (Public Slides))
- ML17268A178 + (Risk-Informed Thinking Workshop Training Materials, August 2017 (Public Slides))
- PMNS20181074, Risk-Informed Updates to Selected SRP Chapter 2 Sections + (Risk-Informed Updates to Selected SRP Chapter 2 Sections)
- ML092190690 + (Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective)
- ML060250034 + (Risk-Informed, Performance-Based Fire Protection Transition Pilot-Plant Observation Visit - Oconee Nuclear Station and Harris Nuclear Plant)
- ML16204A246 + (Risk-Informed, Performance-Based Regulation and Related Matters)
- NL-11-2335, Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping FNP-ISI-ALT-12, Version 2.0 Supplemental Information + (Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping FNP-ISI-ALT-12, Version 2.0 Supplemental Information)
- ML14218A514 + (Risk-Informed/Safety-Based Inservice Inspection Program for the Fifth 10-Year Inservice Inspection Program Interval)
- ML24172A306 + (Risk-Informing Materials Issues Risk Insights for Materials Issues NRC Perspective)
- ML19199A168 + (Risk-Informing Security Integrated Action Plan 071819)
- ML20214Q947 + (Risk-Significance of Chemical Issues Affecting Source Term)
- ML21050A203 + (Risk-informed Process for Evaluations (RIPE) - 2-25-21 Public Meeting NRC Presentation Slides)
- ML21180A011 + (Risk-informed Process for Evaluations (Ripe), Revision 1 NRR (D) Notification Memo)
- ML21085A490 + (Risk-informed Resolution of Generic Letter 2004-02)
- ML18017A893 + (Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant)
- ML19250B406 + (Risks of Plutonium Fuel Facility Damage from High Winds)
- ML20097F786 + (Rislr Lessons Learned Meeting 4-7-20 V4)
- ML20149K639 + (Rislr Public Meeting - Formal Risk Insights May 27)
- ML22244A083 + (Rislr Selective Leaching Audit Plan)
- ML19316C802 + (Riv 2020 Reciprocity Procedure Letter, Filing for Reciprocity in NRC Jurisdiction for Calendar Year 2020)
- ML032940104 + (Riv Backfit Status)
- ML032940098 + (Riv Backfit Status)
- ML21140A389 + (Riv Column 1 EOC 2020 Public Meeting Summary)
- EPID:L-2020-LLA-0248 + (Riv Column 1 EOC 2020 Public Meeting Summary)
- ML22119A242 + (Riv FOLLOW-UP Response: Question About April 11 San Onofre Event)
- ML21056A034 + (Riv Form Letter Only Signed Re Generic Fundamentals Exam (GFE) on March 10, 2021)
- ML19214A136 + (Riv Pao Response to Mr. Langley Response to Inquiry)
- ML24059A044 + (Riv Radiation Protection Manager (RPM) Meeting - Diorb Presentation (2/22/2024))
- ML091070224 + (Riv Regional Administrator Presentation at Texas A&M University March 30, 2009, Three Mile Island - Impact on Safety Perspectives and Safety Belief)
- ML20231A799 + (Riv Response to Mr. Langley Quick Question About Canister Downloading Simulations at SONGS ISFSI)
- ML22329A111 + (Riv Response to NUGEQ Clarification of Performance Deficiency from Diablo Canyon POV Report 2022-011)
- ML040360411 + (Riv Status of Fire Protection Inspections)
- ML18039A722 + (Riv Top Workshop NRC Updates)
- ML21096A082 + (River Basin Commission - Surface Water Withdrawal of Up to 122.800 Mgd from the Susquehanna River; Groundwater Withdrawal (30-Day Average) of 0.225 Mgd from Wells a, B, and C; and Consumptive Water Use (Peak Day) of Up to 19.200 Mgd, For.)
- ML081280308 + (River Basin Commission Letter to M. Gallagher, Amergen, Regarding the Three Mile Island License Renewal Application)
- ML073090043 + (River Basin Commission PPL Susquehanna Water Withdrawal Docket)
- ML080230336 + (River Basin Commission Water Resources Management)
- ML080230334 + (River Basin Commission, Susquehanna River Basin Commission Gis Program., Excerpt, Middle Susquehanna Subbasin)
- ML18026A121 + (River Basin Routing Coefficients - Table 2.4-9)
- ML22073A189 + (River Bend Nuclear Station; and Waterford Steam Electric Station, Unit 3 - Proof of Financial Protection (10 CFR 140.15))
- ML14198A646 + (River Bend Station - NRC Emergency Preparedness Annual Inspection Report 05000458/2013502)
- IR 05000458/2013502 + (River Bend Station - NRC Emergency Preparedness Annual Inspection Report 05000458/2013502)
- ML13075A022 + (River Bend Station - NRC Emergency Preparedness Annual Inspection Report 05000458/2012501)
- IR 05000458/2012503 + (River Bend Station - NRC Emergency Preparedness Annual Inspection Report 05000458/2012501)
- ML15280A459 + (River Bend Station - NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000458/2015405)
- IR 05000458/2018406 + (River Bend Station - Notification of Cyber Security Inspection (NRC Inspection Report 05000458/2018406) and Request for Information)
- ML13198A078 + (River Bend Station Seismic Wafkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic)
- ML19323G118 + (River Bend Station, & Waterford 3 Steam Electric Station: Entergy - 2019 Certification of Foreign Ownership Control or Influence (FOCI))