Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Revise Bases for 3.4.7 to Address DHR Via Natural Circulation". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML17202U956  + (Reviews Util Responses to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. Proposed Schedule for Completion of First Stage Somewhat Lengthy)
  • ML17227A549  + (Reviews Util Submittals Per 901220,911206 & s Responding to Generic Ltr 90-06 & Requests Resubmittal of Util Response Keeping W/Intent of GL Due to Listed Areas of Concern)
  • ML20155J817  + (Reviews Waste Mgt Sections of Application for Agreement State Status by State of Il.Proposed State of Il Program Compatible W/Nrc Program for Mgt of Low Level Waste.Related Documentation Encl)
  • ML20126M918  + (Reviews Westinghouse 1,000 Mwe NSSS Design.If Properly Developed,Proposed Design Could Satisfy Current Regulatory Guidance & Be Licensable.Addl Analyses Required to Satisfy Requirements of Severe Accident Policy Statement)
  • ML19241B368  + (Reviews Westinghouse Rept, Qualification Testing of Barton Pressure & Differential Pressure Transmitters)
  • ML20115G633  + (Reviews Written Exam Administered at Faclity on 920824 & Found No Questions Causing Applicants Problems)
  • ML19317E036  + (Reviews a Gehrs Proposal That Cooling Lake at Dresden Not Be Included in Indemnity Location.No Definite Conclusions Reached)
  • 05000255/LER-1981-050-03, Reviews of Documentation Associated W/Repair Work to Pressurizer power-operated Relief Valves Were Found to Be Incomplete.Caused by Personnel Error.Procedures to Be Reviewed  + (Reviews of Documentation Associated W/Repair Work to Pressurizer power-operated Relief Valves Were Found to Be Incomplete.Caused by Personnel Error.Procedures to Be Reviewed)
  • 05000336/FIN-2018011-01  + (Reviews of Incoming Industry Operation Experience Not Completed)
  • ML19276G284  + (Reviews to Gao Re record-keeping Requirements Found in 10CFR40.61.Records Retained for Five Years Unless Part of Investigation)
  • TSTF-329  + (Revise 3.4.17 Bases to Match Specification)
  • TSTF-195  + (Revise 3.4.6 Action A.1 to Be Consistent with the Specification)
  • TSTF-318  + (Revise 3.5.1 for One Lcpi Pump Inoperable in Each of Two ECCS Divisions)
  • TSTF-346  + (Revise 3.8.1 Actions to Allow Time to Cooldown Under Natural Circulation)
  • TSTF-546  + (Revise APRM Channel Adjustment Surveillance Requirement)
  • TSTF-277  + (Revise Accumulator Boron Concentration Verification SR)
  • TSTF-117  + (Revise Accumulator Pressure Reference from Pressurizer to RCS)
  • TSTF-305  + (Revise Actions for Exiting Physics Tests)
  • TSTF-566  + (Revise Actions for Inoperable RHR Shutdown Cooling Subsystems)
  • TSTF-571  + (Revise Actions for Inoperable Source Range Neutron Flux Monitor)
  • TSTF-220  + (Revise Actions for Inoperable, Misaligned Apsr)
  • NL-17-0190, Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidate Line Item Improvement Process  + (Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidate Line Item Improvement Process)
  • TSTF-100  + (Revise Adv Action B to State Restore All But One Adv to Operable Status)
  • TSTF-592  + (Revise Automatic Depressurization System (ADS) Instrumentation Requirements)
  • TSTF-514  + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
  • TSTF-114  + (Revise Bases for 3.4.7 to Address DHR Via Natural Circulation)