Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- CPSES-200600402, Response to Report of Inspection of Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b + (Response to Report of Inspection of Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b)
- NLS2012062, Response to Request 2 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits. + (Response to Request #2 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits.)
- ML21102A395 + (Response to Request 10 Gps, Particle Identification Overview Map)
- ML21102A392 + (Response to Request 2 SU10214)
- NLS2012062, Response to Request 2 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits + (Response to Request 2 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits)
- ML21102A390 + (Response to Request 3 SU10223)
- NLS2013001, Response to Request 3 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits + (Response to Request 3 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits)
- BSEP 14-0100, Response to Request Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 + (Response to Request Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805)
- ML19008A020 + (Response to Request Dated December 7, 2018 for Docketing of Additional Documents to Support Nrc'S Environmental Review of the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application)
- ML19007A326 + (Response to Request Dated December 7, 2018 for Docketing of Additional Documents to Support NRCs Environmental Review of the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application)
- ML19305A965 + (Response to Request Dated October 31, 2019 for Docketing of Additional Documents to Support NRCs Environmental Review of the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application)
- ML18096B793 + (Response to Request Enclosing Fp&Ls 1968 Annual Report and Related Documents, Addition to a Copy Sent 5/6/1969 (Hutchinson Island 1))
- ML052500306 + (Response to Request No. 2 in NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors)
- NEI 04-07, Response to Request No. 2 in NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (Response to Request No. 2 in NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.)
- ML17296A314 + (Response to Request Re Proposed Allocation of Central Az Project Water to Az Power Industry.Recommends 100,000 acre- Feet/Yr Be Allocated to Power Production by Year 2015.All Allocations Will Be Utilized in 1995)
- ML15281A416 + (Response to Request Regarding the Document Titled, Field Sampling and Dose Assessment Plan for the Western New York Nuclear Service Center in Follow-Up to Aerial Gamma Radiation Survey Conducted in 2014)
- ML18093A115 + (Response to Request Withdrawal the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application)
- ML081130449 + (Response to Request for 3-Month Extension, Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML081130454 + (Response to Request for 3-Month Extension, Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- NRC-05-0062, Response to Request for Action Plan Details Regarding Substantive Cross-Cutting Human Performance Issue + (Response to Request for Action Plan Details Regarding Substantive Cross-Cutting Human Performance Issue)
- ML052850350 + (Response to Request for Action Plan Details Regarding Substantive Cross-Cutting Human Performance Issue)
- ULNRC-06602, Response to Request for Addition Information Pertaining to Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and TS 5.3.1.2 - + (Response to Request for Addition Information Pertaining to Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and TS 5.3.1.2 -)
- NL-19-0850, Response to Request for Addition Information Regarding Application to Adopt Title 10 of Code of Federal Regulations (CFR) 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and . + (Response to Request for Addition Information Regarding Application to Adopt Title 10 of Code of Federal Regulations (CFR) 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and .)
- EPID:L-2019-LLA-0266 + (Response to Request for Addition Information Regarding Application to Adopt Title 10 of Code of Federal Regulations (CFR) 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and ...)
- ML16244A060 + (Response to Request for Addition Information to RR 16-MN-003)
- GNRO-2012/00055, Response to Request for Additional (RAI) Set 12 Dated May 9, 2012 + (Response to Request for Additional (RAI) Set 12 Dated May 9, 2012)
- GNRO-2014/00076, Response to Request for Additional (RAI) Set 51 Dated September 11, 2014 + (Response to Request for Additional (RAI) Set 51 Dated September 11, 2014)
- ML092650692 + (Response to Request for Additional (Rai), Proposed License Amendment Request - Correction to Technical Specification Table 3.7-1 Operator Action 3.b)
- RS-13-159, Response to Request for Additional - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation + (Response to Request for Additional - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation)
- 2CAN011109, Response to Request for Additional Clarifications Regarding License Amendment Request Technical Specification Change to Extend Type a Test Frequency to 15 Years + (Response to Request for Additional Clarifications Regarding License Amendment Request Technical Specification Change to Extend Type a Test Frequency to 15 Years)
- RS-15-010, Response to Request for Additional Environmental Information Regarding Request to Revise Ultimate Heat Sink Temperature Limits + (Response to Request for Additional Environmental Information Regarding Request to Revise Ultimate Heat Sink Temperature Limits)
- CNL-21-005, Response to Request for Additional Info Re License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition & Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07) + (Response to Request for Additional Info Re License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition & Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07))
- NRC-13-0026, Response to Request for Additional Info Re Proposed License Amendment to Relocate Pressure and Temperature Curves to Pressure & Temperature Limits Report + (Response to Request for Additional Info Re Proposed License Amendment to Relocate Pressure and Temperature Curves to Pressure & Temperature Limits Report)
- ML072780171 + (Response to Request for Additional Info. Re License Amendment Request for ECCS Surveillance Requirements)
- AEP-NRC-2010-74, Response to Request for Additional Infomation Regarding Fourth Ten-Year ISI Program Plan + (Response to Request for Additional Infomation Regarding Fourth Ten-Year ISI Program Plan)
- ML11215A198 + (Response to Request for Additional Infomation Regarding License Amendment Request for Approval to Operate a Reverse Osmosis System During Unit Operation License Amendment Request (LAR) No. 2010-03, Supplement 3)
- ML11147A157 + (Response to Request for Additional Information on License Renewal Application Table 3.1.2-3, Row Numbers 182 and 183)
- ML11243A174 + (Response to Request for Additional Information Regarding the Inter-Unit Spent Fuel Transfer License Amendment Request - Submittal of Non Proprietary Holtec Reports)
- L-2009-192, Response to Request for Additional Information on Confirmatory EPU Analyses + (Response to Request for Additional Information on Confirmatory EPU Analyses)
- GNRO-2013/00010, Response to Request for Additional Information Regarding Revision 13 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan + (Response to Request for Additional Information Regarding Revision 13 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan)
- HNP-16-116, Response to Request for Additional Information Regarding License Amendment Request to Modify Diesel Fuel Oil Testing Surveillance Requirements + (Response to Request for Additional Information Regarding License Amendment Request to Modify Diesel Fuel Oil Testing Surveillance Requirements)
- LR-N09-0195, Response to Request for Additional Information 2 - Request for Change to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process (Cliip), TSTF-359 (ME0341) + (Response to Request for Additional Information 2 - Request for Change to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process (Cliip), TSTF-359 (ME0341))
- ML19030A660 + (Response to Request for Additional Information Increased Capacity Spent Fuel Racks)
- ML19030A685 + (Response to Request for Additional Information Increased Capacity Spent Fuel Racks)
- ML19030A655 + (Response to Request for Additional Information Increased Capacity Spent Fuel Racks)
- PNP 2014-063, Response to Request for Additional Information License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors + (Response to Request for Additional Information License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors)
- PNP 2013-079, Response to Request for Additional Information License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors + (Response to Request for Additional Information License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors)
- PNP 2014-097, Response to Request for Additional Information License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors + (Response to Request for Additional Information License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors)
- CNRO-2014-00009, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations + (Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations)
- RS-11-002, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force Traveler TSTF-501, Rev 1, Relocate Stored Fuel Oil & Lube Oil Volume Values to Licensee Control + (Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force Traveler TSTF-501, Rev 1, Relocate Stored Fuel Oil & Lube Oil Volume Values to Licensee Control)
- ML070230128 + (Response to Request for Additional Information Regarding Report of Inservice Inspection of Steam Generator Tubes, Cycle 14)