Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Responds to Request for Addl Info on AP600 Design Certification Program". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML18038A406  + (Responds to Request for Addl Info on ATWS Review Re Alternate Rod Injection & Recirculation Pump Trip Sys.W/ Seven Oversize Drawings)
  • ML17055D987  + (Responds to Request for Addl Info on ATWS Review Re Alternate Rod Injection & Recirculation Pump Trip Sys.W/ Seven Oversize Drawings)
  • ML20212G077  + (Responds to Request for Addl Info on Agreements W/Doe Re Disposal of Nuclear Fuel.Contract DE-CR01-83NE44386 Entered Into on 830610 for Disposal of Spent Nuclear Fuel &/ or High Level Radwaste)
  • 1CAN089102, Responds to Request for Addl Info on Decay Heat Removal Sys Automatic Closure Interlock Tech Spec Change Request  + (Responds to Request for Addl Info on Decay Heat Removal Sys Automatic Closure Interlock Tech Spec Change Request)
  • ML20129B294  + (Responds to Request for Addl Info on Draft SER Open Item 101 Re Failure Mode Analysis for Boron Dilution Event. Analysis Will Be Submitted for Staff Review by 850715)
  • ML20084P388  + (Responds to Request for Addl Info on Extension of Schedule Completion Dates,Confirming Commitments for Suppl 1 to NUREG-0737,identified in 840221 Order.Extension Date for Submittal of Summary Rept to Reg Guide 1.97 Requested)
  • ST-HL-AE-1339, Responds to Request for Addl Info on FSAR Questions 492.6N-8N,re Paluel Vibration Problem.Failure of bottom- Mounted Instrumentation Thimbles Attributed to Use of Flexible Thimble & Changes to Thimble Configuration  + (Responds to Request for Addl Info on FSAR Questions 492.6N-8N,re Paluel Vibration Problem.Failure of bottom- Mounted Instrumentation Thimbles Attributed to Use of Flexible Thimble & Changes to Thimble Configuration)
  • ML20203C577  + (Responds to Request for Addl Info on Generic Ltr 84-04 Re Improvements to SEP Seismic Spectra Program for Reactor Cavity Pool Seal Design.Plan of Action for Seismic Analysis Will Be Provided by 860709)
  • ML20085H571  + (Responds to Request for Addl Info on IE Bulletin 83-05, ASME Nuclear Code Pumps & Spare Parts Mfg by Hayward Tyler Pump Co. Two Pumps Installed in Each Unit.Pumps to Be Tested in Pump & Valve Inservice Testing Program)
  • ML20046B584  + (Responds to Request for Addl Info on Implementation of Recently Issued Training Rule at LACBWR)
  • 0CAN048309, Responds to Request for Addl Info on NUREG-0737,Items II.F.1.4,II.F.1.5 & II.F.1.6.Block Diagrams of Pressure Monitoring Sys,Water Level Monitoring & Hydrogen Monitoring Sys Encl  + (Responds to Request for Addl Info on NUREG-0737,Items II.F.1.4,II.F.1.5 & II.F.1.6.Block Diagrams of Pressure Monitoring Sys,Water Level Monitoring & Hydrogen Monitoring Sys Encl)
  • ML18054B580  + (Responds to Request for Addl Info on Proposed Administrative Changes to Tech Spec Section 3.0.4,per Generic Ltr 87-09. Licensee Will Implement Program to Assure Appropriate Level of Mgt Approval Required When Operating Conditions Changed)
  • ML20236E202  + (Responds to Request for Addl Info on Rust in Lower Containment Spray Header (Lcsh) of Unit 2.Nozzles in Lcsh Removed & Outboard Isolation Valve Repaired.List of Commitments Encl)
  • ML18151A935  + (Responds to Request for Addl Info on SBO Sers.Util Reviewing Project Schedule for Implementation of Station Blackout Mods & Will Advise NRC of Results by 920316.Justification for Five Year Schedule Encl)
  • ML20086A640  + (Responds to Request for Addl Info on SGTR Analysis,Including Description of Activity Release Rate Data & Tabular Data on I-131 & I-133 Activity Release)
  • ML20132G512  + (Responds to Request for Addl Info on Status of Cleanup. HR Denton 850205 Status Rept on Cleanup Progress Encl.Plenum Assembly Successfully Removed from Reactor Vessel in May. Reactor Vessel Defueling Scheduled to Begin in Oct)
  • ML20132G516  + (Responds to Request for Addl Info on Status of Cleanup. HR Denton 850205 Status Rept on Cleanup Progress Encl.Plenum Assembly Successfully Removed from Reactor Vessel in May. Reactor Vessel Defueling Scheduled to Begin in Oct)
  • ML17333A530  + (Responds to Request for Addl Info on TS Amend Request Re Refueling Operations Decay Time)
  • ML20202B313  + (Responds to Request for Addl Info on Three Criminal Investigator Positions in Ofc of Inspector General,Ref in OP to I Shapiro)
  • ML18038A483  + (Responds to Request for Addl Info on Uninterruptible Power Supply Issues in)
  • ML19242D086  + (Responds to Request for Addl Info to 790524 & 25 Ltrs Re Intended Transfer of Liquid Hydrogen Fluoride Solution to Conservation Chemical Co.Forwards Brush Wellman,Inc Re Use of Hydrofluoric Acid W/Enriched U)
  • ML20129E861  + (Responds to Request for Addl Info to Assist in Review of Request to Utilize ASME Code Case N-411 for Analysis of Replacement Recirculation Sys.Discussion & Figures Provide Description of Coupled Bldg Model & Spectra Comparison)
  • ML19350D519  + (Responds to Request for Addl Info to Complete Environ Assessment Study.Updated Matls Balance Data for Releases Encl)
  • ML19350D505  + (Responds to Request for Addl Info to Complete Environ Assessment Study.Updated Matls Balance Data for Releases Encl)
  • ML20107K179  + (Responds to Request for Addl Info to Continue Review of Proposed TS Change for EDG Allowed Outage Times)