Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18094A315 + (Responds to Request for Addl Info Re Util Schedule for Responding to Item II.D.1 of NUREG-0737 Concerning Stress Analyses.Responses Will Be Provided by 890515)
- ML20206L691 + (Responds to Request for Addl Info Re Util Request for Extended Outage Time for Vc/Yc Sys Mod)
- ML20153C587 + (Responds to Request for Addl Info Re Util Responses to NRC Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings)
- ML20091M805 + (Responds to Request for Addl Info Re Util Response to Questions on Increased Interim Plugging Criteria)
- ML19325D665 + (Responds to Request for Addl Info Re Util Denial of Violations Noted in Insp Repts 50-327/88-09 & 50-328/88-09. Appropriate Organizations Surveyed & Documents Identified That Should Be Afforded Special Handling & Storage)
- ML20100E263 + (Responds to Request for Addl Info Re Util 850321 Proposed Tech Spec Changes Concerning Analog Transmitter Trip Sys Mod. Summary of Implementation of Analog Transmitter Trip Sys Encl)
- ML20128B732 + (Responds to Request for Addl Info Re Verbal Request for back-up Calculations for Gpu Nuclear TDR 713, OCNGS Upper Drywell Shield Wall Thermal Analysis.)
- ML20128B728 + (Responds to Request for Addl Info Re Verbal Request for back-up Calculations for Gpu Nuclear TDR 713, OCNGS Upper Drywell Shield Wall Thermal Analysis)
- ML20212C377 + (Responds to Request for Addl Info Re Verification of Baseplate & Fapps Computer Programs Listed in Subsection 3.9.B.1 of Fsar.Validation Info Discussed & Will Be Included in Next FSAR Amend)
- 0CAN068317, Responds to Request for Addl Info Re Violation Noted in IE Insp Rept 50-313/83-03 Concerning Failure to Follow Requirements for Changes to Refueling Shuttle Procedure. Procedure Modified to Detail Sequence Changes + (Responds to Request for Addl Info Re Violation Noted in IE Insp Rept 50-313/83-03 Concerning Failure to Follow Requirements for Changes to Refueling Shuttle Procedure. Procedure Modified to Detail Sequence Changes)
- ML20112A327 + (Responds to Request for Addl Info Re Violation Noted in Insp Rept 50-410/84-11 in Cover Ltr for Insp Rept 50-410/85-15. Corrective Actions:Project Procedure PP16 Changed to Limit Revs to Engineering & Design Coordination Repts)
- ML20055D211 + (Responds to Request for Addl Info Re Violations Noted in Insp Rept 50-482/90-05.Corrective Actions:Change Made to Adm 02-005, Reactor Operators Qualifications & Responsibilities)
- ELV-02942, Responds to Request for Addl Info for Changes for Tech Spec Re Removal of Resistance Temp Detector Bypass Loops + (Responds to Request for Addl Info for Changes for Tech Spec Re Removal of Resistance Temp Detector Bypass Loops)
- ML20083G017 + (Responds to Request for Addl Info for Justification of 72 H Feedwater Isolation Valve Inoperable Time Limit as Presented in 831116 Application for Amend to Tech Specs.Feedwater Pump Trip & Feedwater Control Valve Provide Added Protection)
- ML20049A891 + (Responds to Request for Addl Info for Review of 810915 Emergency Request for Temporary Change to License R-103. Change Would Allow Continued n-Y Production of Tc-99m to Medical Community During Facility Maint Shutdown)
- BECO-85-171, Responds to Request for Addl Info for Significant Hazards Consideration on Proposed Deletion of Tech Spec Table 3.7.1 Re Primary Containment Isolation Valves.Integrity Assured by Lifting Valves + (Responds to Request for Addl Info for Significant Hazards Consideration on Proposed Deletion of Tech Spec Table 3.7.1 Re Primary Containment Isolation Valves.Integrity Assured by Lifting Valves)
- ML19210D939 + (Responds to Request for Addl Info in 780526 IE Insp Repts 50-458/78-04 & 50-459/79-04.Forwards La State Univ 790731 Status Rept Re Environ Study of Culvert Crossing Alligator Bayou)
- ML19281A275 + (Responds to Request for Addl Info in IE Bulletin 78-03 Re Potential Explosive Gas Mixture Accumulations Associated W/Bwr Offgas Sys Operations)
- ML20066L448 + (Responds to Request for Addl Info in Insp Rept 50-146/90-02. Results of Paint Chip Samples,Plan of Action to Disposition Filled Drum Storage Bunker & Administrative Forms Encl)
- ML18032A486 + (Responds to Request for Addl Info in Insp Repts 50-259/87-17,50-260/87-17 & 50-296/87-17 on 870527 Re Planned Security Sys Upgrade to Meet Alarm Assessment Capabilities,Allegation Riii 86-A-0314 & Employee Concern)
- ML19275A841 + (Responds to Request for Addl Info in Response to IE Bulletin 79-02, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Describes Current Testing Program)
- AECM-81-426, Responds to Request for Addl Info in Support of SER (NUREG-0831).Info Re Channel Box Deflection,Ser Item 1.11(2),encl + (Responds to Request for Addl Info in Support of SER (NUREG-0831).Info Re Channel Box Deflection,Ser Item 1.11(2),encl)
- ML20138Q815 + (Responds to Request for Addl Info in Support of 851104 Submittal, Demonstration of Conformance W/K(Z) Curve Existing in Prairie Island Tech Specs W/Requirements of 10CFR50.46 & App K)
- RBG-22623, Responds to Request for Addl Info on 851021 Proposed Revs to Tech Spec 4.8.1.1.2 Re Voltage & Frequency Transients Prior to Reaching steady-state Operation.Equipment Associated W/ Loads Will Not Effect Performance of Electrical Components + (Responds to Request for Addl Info on 851021 Proposed Revs to Tech Spec 4.8.1.1.2 Re Voltage & Frequency Transients Prior to Reaching steady-state Operation.Equipment Associated W/ Loads Will Not Effect Performance of Electrical Components)
- ML20059A769 + (Responds to Request for Addl Info on 930820 Submittal of Soil Sampling Plan for Phase II of Sva Decommissioning Project)
- NRC-96-4633, Responds to Request for Addl Info on AP600 Design Certification Program + (Responds to Request for Addl Info on AP600 Design Certification Program)
- ML18038A406 + (Responds to Request for Addl Info on ATWS Review Re Alternate Rod Injection & Recirculation Pump Trip Sys.W/ Seven Oversize Drawings)
- ML17055D987 + (Responds to Request for Addl Info on ATWS Review Re Alternate Rod Injection & Recirculation Pump Trip Sys.W/ Seven Oversize Drawings)
- ML20212G077 + (Responds to Request for Addl Info on Agreements W/Doe Re Disposal of Nuclear Fuel.Contract DE-CR01-83NE44386 Entered Into on 830610 for Disposal of Spent Nuclear Fuel &/ or High Level Radwaste)
- 1CAN089102, Responds to Request for Addl Info on Decay Heat Removal Sys Automatic Closure Interlock Tech Spec Change Request + (Responds to Request for Addl Info on Decay Heat Removal Sys Automatic Closure Interlock Tech Spec Change Request)
- ML20129B294 + (Responds to Request for Addl Info on Draft SER Open Item 101 Re Failure Mode Analysis for Boron Dilution Event. Analysis Will Be Submitted for Staff Review by 850715)
- ML20084P388 + (Responds to Request for Addl Info on Extension of Schedule Completion Dates,Confirming Commitments for Suppl 1 to NUREG-0737,identified in 840221 Order.Extension Date for Submittal of Summary Rept to Reg Guide 1.97 Requested)
- ST-HL-AE-1339, Responds to Request for Addl Info on FSAR Questions 492.6N-8N,re Paluel Vibration Problem.Failure of bottom- Mounted Instrumentation Thimbles Attributed to Use of Flexible Thimble & Changes to Thimble Configuration + (Responds to Request for Addl Info on FSAR Questions 492.6N-8N,re Paluel Vibration Problem.Failure of bottom- Mounted Instrumentation Thimbles Attributed to Use of Flexible Thimble & Changes to Thimble Configuration)
- ML20203C577 + (Responds to Request for Addl Info on Generic Ltr 84-04 Re Improvements to SEP Seismic Spectra Program for Reactor Cavity Pool Seal Design.Plan of Action for Seismic Analysis Will Be Provided by 860709)
- ML20085H571 + (Responds to Request for Addl Info on IE Bulletin 83-05, ASME Nuclear Code Pumps & Spare Parts Mfg by Hayward Tyler Pump Co. Two Pumps Installed in Each Unit.Pumps to Be Tested in Pump & Valve Inservice Testing Program)
- ML20046B584 + (Responds to Request for Addl Info on Implementation of Recently Issued Training Rule at LACBWR)
- 0CAN048309, Responds to Request for Addl Info on NUREG-0737,Items II.F.1.4,II.F.1.5 & II.F.1.6.Block Diagrams of Pressure Monitoring Sys,Water Level Monitoring & Hydrogen Monitoring Sys Encl + (Responds to Request for Addl Info on NUREG-0737,Items II.F.1.4,II.F.1.5 & II.F.1.6.Block Diagrams of Pressure Monitoring Sys,Water Level Monitoring & Hydrogen Monitoring Sys Encl)
- ML18054B580 + (Responds to Request for Addl Info on Proposed Administrative Changes to Tech Spec Section 3.0.4,per Generic Ltr 87-09. Licensee Will Implement Program to Assure Appropriate Level of Mgt Approval Required When Operating Conditions Changed)
- ML20236E202 + (Responds to Request for Addl Info on Rust in Lower Containment Spray Header (Lcsh) of Unit 2.Nozzles in Lcsh Removed & Outboard Isolation Valve Repaired.List of Commitments Encl)
- ML18151A935 + (Responds to Request for Addl Info on SBO Sers.Util Reviewing Project Schedule for Implementation of Station Blackout Mods & Will Advise NRC of Results by 920316.Justification for Five Year Schedule Encl)
- ML20086A640 + (Responds to Request for Addl Info on SGTR Analysis,Including Description of Activity Release Rate Data & Tabular Data on I-131 & I-133 Activity Release)
- ML20132G512 + (Responds to Request for Addl Info on Status of Cleanup. HR Denton 850205 Status Rept on Cleanup Progress Encl.Plenum Assembly Successfully Removed from Reactor Vessel in May. Reactor Vessel Defueling Scheduled to Begin in Oct)
- ML20132G516 + (Responds to Request for Addl Info on Status of Cleanup. HR Denton 850205 Status Rept on Cleanup Progress Encl.Plenum Assembly Successfully Removed from Reactor Vessel in May. Reactor Vessel Defueling Scheduled to Begin in Oct)
- ML17333A530 + (Responds to Request for Addl Info on TS Amend Request Re Refueling Operations Decay Time)
- ML20202B313 + (Responds to Request for Addl Info on Three Criminal Investigator Positions in Ofc of Inspector General,Ref in OP to I Shapiro)
- ML18038A483 + (Responds to Request for Addl Info on Uninterruptible Power Supply Issues in)
- ML19242D086 + (Responds to Request for Addl Info to 790524 & 25 Ltrs Re Intended Transfer of Liquid Hydrogen Fluoride Solution to Conservation Chemical Co.Forwards Brush Wellman,Inc Re Use of Hydrofluoric Acid W/Enriched U)
- ML20129E861 + (Responds to Request for Addl Info to Assist in Review of Request to Utilize ASME Code Case N-411 for Analysis of Replacement Recirculation Sys.Discussion & Figures Provide Description of Coupled Bldg Model & Spectra Comparison)
- ML19350D519 + (Responds to Request for Addl Info to Complete Environ Assessment Study.Updated Matls Balance Data for Releases Encl)
- ML19350D505 + (Responds to Request for Addl Info to Complete Environ Assessment Study.Updated Matls Balance Data for Releases Encl)
- ML20107K179 + (Responds to Request for Addl Info to Continue Review of Proposed TS Change for EDG Allowed Outage Times)