Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Responds to Questions Posed in 970106 FRN". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • L-84-278, Responds to Questions 5a,b & C in NRC 840813 Request for Addl Info Re Application for Amend to Licenses DPR-31 & DPR-41,changing Structural Design of Spent Fuel Pit & New Storage Racks  + (Responds to Questions 5a,b & C in NRC 840813 Request for Addl Info Re Application for Amend to Licenses DPR-31 & DPR-41,changing Structural Design of Spent Fuel Pit & New Storage Racks)
  • ML20137H451  + (Responds to Questions Asked on 961217 Re Offsite Spike in Data from Citizens Radiological Monitoring Network Surrounding Plant.Excerpts from Insp Rept 50-293/96-10 on 970207 Encl)
  • ML20137H454  + (Responds to Questions Asked on 961217 Re Offsite Spike in Data from Citizens Radiological Monitoring Network Surrounding Plant.Excerpts from Insp Rept 50-293/96-10 on 970207 Encl)
  • ML20091N057  + (Responds to Questions Concerning Intent to File Action to Determine Whether Util Has Ceased to Exist by Operation of Law.W/Certificate of Svc.Related Correspondence)
  • ML20062J964  + (Responds to Questions Concerning TMI-2 Accident & Public Safety.Release of Contaminated Water Not Permitted.Facility Mods & Emergency Plan Upgrading Underway.Licensee Is Conducting Feasibility Studies Re Plant Recovery)
  • ML20044F949  + (Responds to Questions Contained in 930423 Memo Re 930121 Meeting W/Facility Siting Council)
  • ML19269B975  + (Responds to Questions Contained in NRC Covering Structural Considerations Re Basin 2 South Wall & Gate.No Basins Will Be Drained Individually at Any Time)
  • ML20133G217  + (Responds to Questions Contained in Re Amend to Certificate of Compliance 5942.Separation Provided by Placing 0.188 Inch 304 Stainless Steel Plate Between Two Baskets.Drawings & Computer Run Encl)
  • ML19263D804  + (Responds to Questions Contained in Re HR 2608,on Consolidation of NRC Into One Location)
  • ML20132F939  + (Responds to Questions Contained in Re NRC Topical Rept Review Process for High Integrity Containers.Review Process Considered Important for Ensuring Public & Industry Acceptance)
  • ML20137U184  + (Responds to Questions Contained in Re NRCs Position on U Kings Gravity Separation Process)
  • ML17157A088  + (Responds to Questions Delineated in 900131 Ltr Re Diesel Generator Events That Occurred During Sept & Oct 1989.Draft Procedures for Proposed Intake Air Temp Test Program Transmitted to NRC on 900205.Revised Procedures Encl)
  • PLA-3359, Responds to Questions Delineated in Re Diesel Generator Events That Occurred During Sept & Oct 1989.Draft Procedures for Proposed Intake Air Temp Test Program Transmitted to NRC on 900205.Revised Procedures Encl  + (Responds to Questions Delineated in Re Diesel Generator Events That Occurred During Sept & Oct 1989.Draft Procedures for Proposed Intake Air Temp Test Program Transmitted to NRC on 900205.Revised Procedures Encl)
  • ML20212H039  + (Responds to Questions Discussed During 861216 Telcon Re SPDS & Main Feedwater (MFW) Indication in Control Room.Util Will Revise Action Plan,Section 4B.19 Re MFW Pump Trips)
  • ML19338D218  + (Responds to Questions Forwarded W/Nrc Re Presence of Voids Underneath Turbine Bldg Mat.Two borings,DM-12 & DM-13,indicated Existence of Minor Voids in Vicinity of Borings.Voids Exist Only within Turbine Bldg Area)
  • ML20081F059  + (Responds to Questions Identified in NRC 950314 Summary of 950223 Meeting W/Nrc Re Pending License Amends to Increase SG Tube voltage-based Repair Limits for Facilities)
  • ML20053E345  + (Responds to Questions NRC Raised During 811123 Independent Verification Program.Corrective Actions:Weld LP-K-114 Ground & Liquid Penetration Inspected)
  • ML20029D990  + (Responds to Questions Noted in Insp Rept 99901119/93-01 Re Unsuccessful Natl Technical Sys Qualification Testing of Continental Silicon Rubber Electrical Cable.Continental Cable Never Dedicated or Qualified)
  • ML17223B223  + (Responds to Questions Noted in Re Planned Sewage Treatment Plant to Be Built by Plant.No Submittal Received from Util Re Any Such Sewage Plant)
  • B12610, Responds to Questions Posed During 870701 & 21 Telcon Re Fluence Calculations & Util Intentions Re Evaluation of PTS Upon Conversion from Stainless Steel to Zircaloy Clad Fuel. NRC Should Approve RT PTS Evaluation Per 10CFR50.61  + (Responds to Questions Posed During 870701 & 21 Telcon Re Fluence Calculations & Util Intentions Re Evaluation of PTS Upon Conversion from Stainless Steel to Zircaloy Clad Fuel. NRC Should Approve RT PTS Evaluation Per 10CFR50.61)
  • ML20153B068  + (Responds to Questions Posed During Jul 1987 Meeting in Las Vegas,Nv.Results of PRA Would Be More Meaningless than Usual)
  • ML20149E975  + (Responds to Questions Posed Re Likelihood of Catastrophic Release Resulting from Truck Bomb Explosion within NPP & Informs That List of Vulnerabilities Refutes Claim That Truck Bomb Would Be Insufficient to Prevent Safe Shutdown)
  • ML20235J298  + (Responds to Questions Posed by D Kubicki in Telecon Re Fire Protection Supervisory Circuits & Schedule for Completion)
  • ML19317H365  + (Responds to Questions Posed by Jf Ahearne Re Proposed Purging of Facility Containment Bldg Atmosphere.Recommends That Slow Purging Method Be Used to Assure That Doses to Public Are Low)
  • 3F0595-08, Responds to Questions Posed by NRC Re FPC Rept of Fire Endurance Tests Conducted on Barriers Constructed of Thermo-Lag & Combination of Thermo-Lag & Mecatiss Matl, Provided by FPC Per GL 86-10  + (Responds to Questions Posed by NRC Re FPC Rept of Fire Endurance Tests Conducted on Barriers Constructed of Thermo-Lag & Combination of Thermo-Lag & Mecatiss Matl, Provided by FPC Per GL 86-10)
  • ML20199F360  + (Responds to Questions Posed in 970106 FRN)
  • ML20215B207  + (Responds to Questions Posed in ASLBP 861203 Memorandum & Order Re Conversion to gas-fired Facility.Imposition of Conditions on Withdrawal of OL Application Unnecessary. Certificate of Svc & Svc List Encl)
  • ML20126B962  + (Responds to Questions Posed in NRC Re Modified Method for Control Element Assembly Ejection Analysis. Primary Method for Calculating Hot Channel Fuel Enthalpy Will Be Via CHIC-KIN Code)
  • ML20035A885  + (Responds to Questions Posed to Region I Re Conclusions on Issue of RPS Matrix Testing Conducted at Unit 2 on 890922. Reinsp of RPS Will Be Documented as Part of Insp Rept 50-336/91-18.Memo Re RPS Testing Encl)
  • ML20063A254  + (Responds to Questions Presented During 820615 Meeting Re QA Program.Training of Applied Physics Personnel to QC-4 Requirements Accomplished)
  • ML20148G986  + (Responds to Questions Presented in from Perkins)
  • ML20134P292  + (Responds to Questions Presented in to G Gordon Re New York Regulatory Jurisdiction at Plant,Unit 1)
  • ML19259B497  + (Responds to Questions Raised During 790126 Testimony. Provides Answers Re Number of Spent Fuel Shipments Now Passing Through Urban Areas & NRC Position on Maximizing Onsite Spent Fuel Storage as Opposed to Offsite Storage)
  • ML19260A248  + (Responds to Questions Raised During 791101 Meeting Re Impact of Potential Revision of Cladding Rupture Models Used in LOCA Evaluation.New Data Does Not Change Conclusions of Previously Completed Safety Analysis for Plants Using NSSS)
  • ML20050B696  + (Responds to Questions Raised During 820310 Telcon Re Preservice Insp Rept)
  • ML18019A434  + (Responds to Questions Raised During 851016 Meeting Re Integrated Design Insp 50-400/84-48 Open Items. Interdisciplinary Clearance Criteria Will Be Revised to Require Safety & Nonsafety Piping Review)
  • ML20154H103  + (Responds to Questions Raised During 880502 Meeting Re Util 880406 Request for Relief from ASME Section XI Relief Valve Testing Requirements.Engineer Will Determine Correct Setpoints for Relief Valves by Nov 1988.Addl Info Encl)
  • ML20245A288  + (Responds to Questions Raised During 890411 Telcon Re Mod on Existing Circuits in Order to Incorporate Approved ATWS Mitigating Sys Actuation Circuitry (Amsac).Circuits Will Not Be Modified as Result of Approved AMSAC Installation)
  • ML17310B017  + (Responds to Questions Raised During 931215 Telcon Re NRC Bulletin 88-008 Actions,Results of APS Thermal Stratification Monitoring & Plans for Long Term Monitoring of Thermal Stratification of Apss Piping)
  • ML20080C916  + (Responds to Questions Raised During ASLB 830214-18 Hearings Re Why Excavation Permit Sys Did Not Include Underpinning Work.Sys Intended for General Excavations Onsite & Activities Not Covered by Design Documents)
  • ML20126A348  + (Responds to Questions Raised During Feb 1985 Telcon Re SEP Topic III-4.A Concerning Tornado Missiles.Even Given Postulated Tornado Damage of Extraordinary Magnitude,Safe Shutdown Can Be Achieved & Maintained)
  • ML20036C065  + (Responds to Questions Raised During Insp of Auxiliary Boilers on 930527)
  • L-83-209, Responds to Questions Raised During NRC 830223-24 Site Visit Re Availability of Readout of Core Exit Thermocouples When Plant Computer Down & Procedure for Loss of All Ac Power. Computer Readout Always Available Through Redundant Sys  + (Responds to Questions Raised During NRC 830223-24 Site Visit Re Availability of Readout of Core Exit Thermocouples When Plant Computer Down & Procedure for Loss of All Ac Power. Computer Readout Always Available Through Redundant Sys)
  • ML20147G339  + (Responds to Questions Raised During Region II 1996 NRC Training Managers Conference)
  • ML20147G163  + (Responds to Questions Raised During Region II 1996 NRC Training Managers Conference)
  • ML20086F667  + (Responds to Questions Raised During Review of Updated SAR, Sections 3.6.2 & 3.8.2 Re Containment Pressure Vessel Capacity to Withstand External Pressures.Blowout Panel Setpoints Will Be Revised During Next Operating Cycle)
  • AECM-83-0732, Responds to Questions Raised During Special Safety Insp on 830322-25 Re IE Bulletin 80-11 That Three Mortar Cube Compression Tests Did Not Meet Min Compressive Strength Requirements.Structural Integrity Unimpaired  + (Responds to Questions Raised During Special Safety Insp on 830322-25 Re IE Bulletin 80-11 That Three Mortar Cube Compression Tests Did Not Meet Min Compressive Strength Requirements.Structural Integrity Unimpaired)
  • ML20135D825  + (Responds to Questions Raised Re Applications,Level of Detail & Description of Disposal Site)
  • ML20215D800  + (Responds to Questions Raised Re Application for Possession Only Amend to License R-78,per Enforcement Conference Rept 50-148/86-01.Summary of Disassembly Activities on 860321 & 24 & Radiation Safety Svc Permit Application Encl)
  • ML19269F451  + (Responds to Questions Raised Re Development of Hybrid Power Reactor Design,Incorporating Plant Features That Maximize Safety.Net Value of Proposed Design Approach Cannot Be Adequately Measured)
  • ML20133E661  + (Responds to Questions Raised Re NRC Views on Proposed Us/Peoples Republic of China Agreement for Cooperation,Per 850830 Request.Since Unclassified Info Requested,Nrc Reply Limited)