Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ULNRC-06131, Request for Relaxation from NRC Order EA-12-049, Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Request for Relaxation from NRC Order EA-12-049, Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- ULNRC-06113, Request for Relaxation from NRC Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation + (Request for Relaxation from NRC Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation)
- ML040370331 + (Request for Relaxation from NRC Order EA-03-009, Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML030910112 + (Request for Relaxation from NRC Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML050260665 + (Request for Relaxation from NRC Revised Order EA-03-009, Issuance of First Revised NRC Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML050680518 + (Request for Relaxation from NRC Revised Order EA-03-009, Issuance of First Revised NRC Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML050240329 + (Request for Relaxation from Nuclear Regulatory Commission Revised Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML041320622 + (Request for Relaxation from Nuclear Regulatory Commission Revised Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML041280240 + (Request for Relaxation from Nuclear Regulatory Commission Revised Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML14059A075 + (Request for Relaxation from Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- ML032340188 + (Request for Relaxation from Order for Est Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML071490274 + (Request for Relaxation from Requirements of First Revised NRC Order EA-03-009 (Regarding Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors))
- ULNRC-05416, Request for Relaxation from Requirements of First Revised NRC Order EA-03-009 (Regarding Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors) + (Request for Relaxation from Requirements of First Revised NRC Order EA-03-009 (Regarding Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors))
- ML15071A139 + (Request for Relaxation from Schedule Requirements of NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- LR-N15-0223, Request for Relaxation from Schedule Requirements of NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Request for Relaxation from Schedule Requirements of NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- B18853, Request for Relaxation from Section IV.C(a)(1) of the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads + (Request for Relaxation from Section IV.C(a)(1) of the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads)
- 2CAN050301, Request for Relaxation from Section IV.C(1)(a) of the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads + (Request for Relaxation from Section IV.C(1)(a) of the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads)
- ML060040367 + (Request for Relaxation from the First Revised NRC Order EA-03-009, Deferral of Nonvisual Nondestructive Examinations)
- LR-N16-0041, Request for Relaxation from the Hardened Torus Vent Release Point Height Requirement of NRC Order EA-13-109 Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (Request for Relaxation from the Hardened Torus Vent Release Point Height Requirement of NRC Order EA-13-109 Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- ML13240A130 + (Request for Relaxation of Commission Order No. EA-12-049 & EA-12-051 and First 6 Months Status Report on Implementation of EA-12-049 & EA-12-051)
- ML13240A125 + (Request for Relaxation of Commission Orders EA-12-049 and EA-12-051)
- SVPLTR 15-0009, Request for Relaxation of Condition V(A)(A.1 (1)) of Confirmatory Order EA-13-068 + (Request for Relaxation of Condition V(A)(A.1 (1)) of Confirmatory Order EA-13-068)
- L-21-223, Request for Relaxation of Confirmatorv Action Commitment (EA-04-224) + (Request for Relaxation of Confirmatorv Action Commitment (EA-04-224))
- LIC-16-0048, Request for Relaxation of March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Reliable Spent Fuel Pool Instrumentation (EA-12-049 + (Request for Relaxation of March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Reliable Spent Fuel Pool Instrumentation (EA-12-049)
- JAFP-16-0061, Request for Relaxation of March 12, 2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Reliable Spent Fuel Pool Instrumentation + (Request for Relaxation of March 12, 2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Reliable Spent Fuel Pool Instrumentation)
- NL-03-2395, Request for Relaxation of Order EA-03-009 + (Request for Relaxation of Order EA-03-009)
- ML031070233 + (Request for Relaxation of Order EA-03-009 Requirement IV.C(2))
- NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
- ML033450462 + (Request for Relaxation of Reactor Pressure Vessel Head Penetration Inspection Requirements in NRC Order EA-03-009, San Onofre, Units 2 and 3)
- NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) + (Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46))
- ML073230117 + (Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46))
- NL-04-0494, Request for Relaxation of the First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Vessel Heads at Pressurized Water Reactors + (Request for Relaxation of the First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Vessel Heads at Pressurized Water Reactors)
- NL-06-0739, Request for Relaxation of the First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors + (Request for Relaxation of the First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML16256A655 + (Request for Relaxation of the Release Point Height Requirement of NRC Order EA-13-109,Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- ML070790231 + (Request for Relaxation of the Requirements of Order EA-03-009 Regarding Reactor Pressure Vessel Head Inspections)
- ML062620491 + (Request for Relief (ISI-3-16) from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (TAC Nos. MC9433/MC9433))
- ML062640282 + (Request for Relief (ISI-3-17) from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (TAC Nos. MC9487/MC9488))
- ML063110322 + (Request for Relief (RR ISI-3-18) from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code - Third 10-Year ISI Interval)
- ML14040A014 + (Request for Relief (RR) 13-ON-001, Sections 2 Through 8 - Request for Additional Information)
- ML17349A960 + (Request for Relief (RR) 13-R-12 for Units 1 and 2 and RR 13R-15 for Unit 2, from ASME Code Requirements for the Third 10-Year Inservice Inspection Interval (CAC MF9884 to MF9886; EPID L-2017-LLR-0055 and L-2017-LLR-0056))
- ML14162A094 + (Request for Relief (RR-20) from ASME Code, Section XI for the Fourth 10-Year Inservice Inspection Program Interval)
- ML11186A011 + (Request for Relief (RR-23) from ASME Code, Section XI for the Fourth 10-Year Inservice Inspection Program Interval)
- JAFP-08-0102, Request for Relief (RR-7 Revision 1) - Proposed Alternative to ASME Code Requirements for Weld Overlay Repairs + (Request for Relief (RR-7 Revision 1) - Proposed Alternative to ASME Code Requirements for Weld Overlay Repairs)
- JAFP-08-0099, Request for Relief (RR-7) - Proposed Alternative to ASME Code Requirements for Weld Overlay Repairs + (Request for Relief (RR-7) - Proposed Alternative to ASME Code Requirements for Weld Overlay Repairs)
- ML021750674 + (Request for Relief (Rfr) 01-003 for McGuire Nuclear Station, Units 1 and 2)
- NRC-11-0039, Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements + (Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements)
- BSEP 07-0070, Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements + (Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements)
- ML032380655 + (Request for Relief 03-004)
- ML042040394 + (Request for Relief 03-004, Minimum Percentage Requirements for Second Period of the Second Inservice Inspection Interval)
- ML041400009 + (Request for Relief 03-004, Request for Additional Information)
- ML061580568 + (Request for Relief 04-ON-006)