Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RA-19-076, Request for Continuation of NRC Actions and Approvals Following Transfer of the Licenses from Exelon Generation to Holtec Decommissioning International, LLC + (Request for Continuation of NRC Actions and Approvals Following Transfer of the Licenses from Exelon Generation to Holtec Decommissioning International, LLC)
- L-HU-08-019, Request for Continuation of NRC Reviews for Nuclear Management Co. Submittals on the Docket as of September 22, 2008 + (Request for Continuation of NRC Reviews for Nuclear Management Co. Submittals on the Docket as of September 22, 2008)
- ML18164A341 + (Request for Continuation of the NRC Review of WCAP-15942-P-A / WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies, and Submittal of Slides to Support a Closed Meeting on June 14, 2018 to Discuss)
- ML19289F004 + (Request for Convenient Location for Prehearing Conference. Certificate of Svc Encl)
- ML19289F005 + (Request for Convenient Location for Prehearing Conference. Certificate of Svc Encl)
- ML20052H278 + (Request for Copies of Replies to Interrogatories Addressed to Util,Nrc,Ny State Energy Ofc,Westchester County,Port Authority of Ny & Nj & Village of Buchanan.Related Correspondence)
- ML080880148 + (Request for Copy of Archeological Reports Prepared at the Time of Construction)
- ML13045A294 + (Request for Copy of MHI Document, Root Cause Analysis Report for Tube Wear Identified in the Unit 2 and Unit 3 Steam Generators of SONGS)
- ML19095A207 + (Request for Copy of NRC Response to Mrs. Allen & Advise Steps Which NRC Is Taking to Protect Public)
- ML11299A011 + (Request for Corrected Technical Specification Pages to Resolve License Amendment Request (Lar)/Amendment Timing Coordination Issues for LARs)
- ML19340E584 + (Request for Correction of 801231 Memorandum Re 801229 Telephone Conference Call.Certificate of Svc Encl)
- ML19257C371 + (Request for Correction of ASLB 800110 Initial Decision Approving Mod of LACBWR Spent Fuel Pool.Language of Tech Spec 2.12.3 Should Specify That Licensee Must Store Control Rods & Other Items in Pool.W/Certificate of Svc)
- HL-6240, Request for Correction of Administrative Errors in Environmental Protection Plan Re-Issued by NRC as Part of License Renewal Process + (Request for Correction of Administrative Errors in Environmental Protection Plan Re-Issued by NRC as Part of License Renewal Process)
- ML062830031 + (Request for Correction of Previously Approved Operating License Amendment 160 Safety Evaluation)
- ML20003D219 + (Request for Corrections of Misinterpretation of Revised Policy Statement by Accepting Certification or Clarifying Statement.Aslb Illegally Constricted Intervenors Rights to Challenge Sufficiency of TMI-related Safety Requirements)
- ML16340B509 + (Request for Corrections of Misinterpretation of Revised Policy Statement by Accepting Certification or Clarifying Statement.Aslb Illegally Constricted Intervenors' Rights to Challenge Sufficiency of TMI-related Safety Requirements)
- ML19345G572 + (Request for Current Radiological Emergency Response Plan.To Wait for Final Plan to Be Formalized Would Impose Hardship on Intervenor.Plan Required to Determine If Plan Meshes W/ Surrounding Local Plans.Certificate of Svc Encl)
- ML19316B087 + (Request for Deferral Until 800715 to Respond to Intervenors Forelaws on Board 800527 Contentions.Proposed Contentions on NRC Alternative Site Reanalysis Need to Be Discussed W/Parties.Certificate of Svc Encl)
- ML16250A017 + (Request for Deferral of Actions Related to Beyond-Design-Basis External Events Seismic Actions- Commitment Changes)
- ML16250A018 + (Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions - Commitment Changes)
- NL-17-091, Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions - Commitment Changes + (Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions - Commitment Changes)
- L-18-235, Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions + (Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions)
- L-18-252, Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions + (Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions)
- NL-17-062, Request for Deferral of Actions Related to Beyond-Design-Basis External Event Seismic Actions - Commitment Date Changes + (Request for Deferral of Actions Related to Beyond-Design-Basis External Event Seismic Actions - Commitment Date Changes)
- PNP 2019-001, Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event + (Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event)
- ML19338F603 + (Request for Deferral of Further Response to Izaak Walton League,Porter County Chapter 800821 Request for Production of Documents Until ASLB Rules on GE 801014 Motion. Certificate of Svc Encl.Related Correspondence)
- ML111010592 + (Request for Deferral of Issuance of Renewed Operating Licenses)
- DCL-11-047, Request for Deferral of Issuance of Renewed Operating Licenses + (Request for Deferral of Issuance of Renewed Operating Licenses)
- L-PI-14-012, Request for Deferral of the Experience Eligibility Guidelines for Initial Licensed Operator Candidate for the Prairie Island Nuclear Generating Plant (PINGP) + (Request for Deferral of the Experience Eligibility Guidelines for Initial Licensed Operator Candidate for the Prairie Island Nuclear Generating Plant (PINGP))
- ML20070K510 + (Request for Delay in Filing Testimony on Question 2.1.1 Until 830112 in Order to Obtain Addl Info.Certificate of Svc Encl)
- ML20091Q634 + (Request for Delay in Scheduled Prehearing Conference on Issues Remanded by ALAB-772.Conference Should Be Delayed Until Decision on Applicant 840611 Request for Stay Issued. Certificate of Svc Encl)
- NL-09-168, Request for Delay to Answers NRC Orders EA-09-204 and EA-09-205 Imposing Increased Controls and Fingerprinting and Criminal History Records Check Requirements on Power Reactor Licensees Undergoing Decommissioning + (Request for Delay to Answers NRC Orders EA-09-204 and EA-09-205 Imposing Increased Controls and Fingerprinting and Criminal History Records Check Requirements on Power Reactor Licensees Undergoing Decommissioning)
- ML19253C917 + (Request for Delayed Filing of First Set of Interrogatories for Applicant.Interrogatories Not Processed Due to Severe Illness & Hospitalization.Certificate of Svc Encl)
- ML19253C918 + (Request for Delayed Filing of First Set of Interrogatories for Applicant.Interrogatories Not Processed Due to Severe Illness & Hospitalization.Certificate of Svc Encl)
- ML19345E039 + (Request for Denial of Applicant Motion to Defer Ruling on Pending Petition for Significant Change Determination & to Establish Schedule for Final Settlement Status Repts. Certificate of Svc Encl)
- ML19225A227 + (Request for Denial of NRC 790601 Objection to ASLB Consideration of Class 9 Accidents Submitted by Intervenors States of Nj & DE & Colemans.Class 9 Accidents Are Legitimate Safety Concern,Germane to Admitted Contentions)
- ML20037D234 + (Request for Deposition Subpoena of Secretary of Air Force & Air Force Officers Nichols,Heinrich & Betourne.Air Force Is in Sole Possession of Info Necessary to Understand Air Force Study.Certificate of Svc Encl.Related Correspondence)
- ML20236D782 + (Request for Depositions.* Discusses What Atty General Seeks to Question NRC Witnesses on Re June 1988 Plant Graded Exercise.W/Certificate of Svc.Related Correspondence)
- ML031350415 + (Request for Design Interpretation of Alert and Notification System at Arkansas Nuclear One)
- ML19347C182 + (Request for Designation of Intervenor Witnesses)
- ML20009C900 + (Request for Designation of NCNR Reviewing Official Per EA-06-203)
- ML030130060 + (Request for Deviation from Fire Protection Prgram Incorporating Requirements of Appendix R to Part 50 of Title 10 of the Code of Federal Regulations)
- AEP-NRC-2018-10, Request for Deviation from National Fire Protection Association (NFPA) 805 Requirements + (Request for Deviation from National Fire Protection Association (NFPA) 805 Requirements)
- AEP-NRC-2017-10, Request for Deviation from National Fire Protection Association (NFPA) 805 Requirements + (Request for Deviation from National Fire Protection Association (NFPA) 805 Requirements)
- EPID:L-2018-LLA-0166 + (Request for Deviation from National Fire Protection Association (NFPA) 805 Requirements)
- EPID:L-2017-LLA-0374 + (Request for Deviation from National Fire Protection Association (NFPA) 805 Requirements)
- ML102670480 + (Request for Deviation from the Reactor Oversight Process Action Matrix for Browns Ferry Units 1,2 & 3 - EDO Approval 9/29/10)
- ML12242A370 + (Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased Oversight of the Alkali-Silica Reaction Issue at Seabrook)
- ML100960321 + (Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased NRC Oversight of Specific Issues at Vermont Yankee)
- ML053010404 + (Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased NRC Oversight of Specific Issues at Indian Point Energy Center)
- ML073320344 + (Request for Deviation to the Action Matrix to Provide Heightened NRC Oversight of Security Issues at Peach Bottom Atomic Power Station)
- ML20062M294 + (Request for Directed Certification Re Issue of Validity of Preliminary FEMA Findings.Emergency Planning Regulations Require Hearing on FEMA Agency Finding,Not Preliminary Staff Rept.Certificate of Svc Encl)