Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000338/2022003 + (Reissue - North Anna Power Station – Integrated Inspection Report 05000338/2022003 and 05000339/2022003)
- IR 05000338/2019010 + (Reissue - North Anna Power Station, Units 1 & 2 - Design Basis Assurance Inspection (Programs) Inspection Report 05000338/2019010 and 05000339/2019010)
- ML17178A279 + (Reissue - Notice of Significant Public Meeting to Discuss NRCs End-of-Cycle Assessment of the Fermi Power Plant Performance for the 2016 Calendar Year)
- IR 05000269/2018090 + (Reissue - Oconee Nuclear Station - NRC Inspection Report 05000269/2018090, 05000270/2018090, and 05000287/2018090)
- IR 05000269/2018010 + (Reissue - Oconee Nuclear Station, Units 1,2 & 3 - NRC Design Bases Assurance Inspection (Programs)Report Number 05000269/2018010 and 05000287/2018010)
- IR 05000266/2019412 + (Reissue - Point Beach Nuclear Power Plant - Cyber Security Inspection Report 05000266/2019412 and 05000301/2019412 (Cover Letter Only))
- IR 05000282/2020002 + (Reissue - Prairie Island Nuclear Generating Plant - Integrated Inspection Report 05000282/2020002; 05000306/2020002; and 07200010/2020001)
- ML17178A273 + (Reissue - Public Open House to Discuss NRC Activities, and 2016 End-of-Cycle Performance Assessment of Fermi Power Plant, Unit 2)
- IR 05000280/2022004 + (Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004)
- IR 05000250/2015004 + (Reissue - Turkey Point Nuclear Generating Station - NRC Integrated Inspection Report 05000250/2015004 and 05000251/2015004, October 1, 2015 to December 31, 2015)
- IR 05000395/2017406 + (Reissue - Virgil C. Summer Nuclear Station - Cyber Security Follow-Up Inspection Report 05000395/2017406 - OUO Removed)
- IR 05000395/2015004 + (Reissue - Virgil C. Summer Nuclear Station, Unit 1 - NRC Integrated Inspection Report 05000395/2015004)
- ML22070A089 + (Reissue - Vogtle Electric Generating Plant Unit 3 & 4 - NRC Operator License Examination Report 05200025/2021301 and 05200026/2021301)
- IR 05000424/2018002 + (Reissue - Vogtle Electric Generating Plant - Nuclear Regulatory Commission Integrated Inspection Report 05000424/2018002; 05000425/2018002; 05000424/2018502 and 05000425/2018502)
- IR 05000390/2023002 + (Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002)
- ML23227A032 + (Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002)
- IR 05000390/2020301 + (Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301)
- IR 05000369/2020302 + (Reissue - William B. McGuire, NRC Retake Written Examination Report 05000369/2020302 and 05000370/2020302)
- ML19336C545 + (Reissue 2019013)
- ML19266A656 + (Reissue Braidwood Inspection Report 2019002)
- IR 05000346/2021090 + (Reissue Davis-Besse NRC Inspection Report (05000346/2021090) Preliminary White Finding)
- IR 05000237/2020090 + (Reissue Dresden Nuclear Power Station, Units 2 and 3 - NRC Inspection Report 05000237/2020090 and 05000249/2020090)
- ML22068A086 + (Reissue Dresden Nuclear Power Station, Units 2 and 3 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests, and Experiments) Baseline Inspection)
- IR 05000348/2023440 + (Reissue Farley Units-Final Significance Determination for a Security-Related Greater than Green Finding, Nov and Assessment Followup LTR, IR 05000348/2023440 and 05000364/2023440 - Cover)
- IR 05000341/2022010 + (Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010)
- ML21167A287 + (Reissue Harris 2021-301 Exam Report)
- IR 05000382/2022001 + (Reissue IR 05000382/2022001)
- IR 05000373/2024001 + (Reissue Lasalle County Station Integrated Inspection Report 05000373/2024001 and 05000374/2024001)
- IR 05000265/2023040 + (Reissue Quad Cities Nuclear Power Station 95001 Supplemental Inspection Supplemental Report 05000265/2023040 and Follow Up Assessment Letter)
- IR 05000254/2025002 + (Reissue Quad Cities Nuclear Power Station Integrated Inspection Report 05000254/2025002 and 05000265/2025002)
- IR 05000327/2016004 + (Reissue Sequoyah Nuclear Plant - NRC Integrated Inspection Report 05000327/2016004 and 05000328/2016004)
- ML15125A084 + (Reissue St. Lucie 2015-404 Public)
- ML15121A667 + (Reissue St. Lucie 2015-404 Public)
- ML22084A102 + (Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission)
- ML24354A158 + (Reissue Technical Specification Pages for Amendment No. 170 to Facility Operating License No. NPF-90)
- ML15121A214 + (Reissue Turkey Point 2015-401 to 2015-403 Public)
- IR 05000424/2017410 + (Reissue Vogtle Electric Generating Plant - U.S. Nuclear Regulatory Commission Security Inspection Report 05000424/2017410 and 05000425/2017410)
- IR 05000424/2019012 + (Reissue Vogtle Electric Generating Plant, Units 1 & 2 - NRC Temporary Instruction 2515/194 Inspection Report 05000424/2019012 and 05000425/2019012)
- IR 05000390/2022003 + (Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003)
- IR 05000348/2018003 + (Reissue for Joseph M. Farley Nuclear Plant - NRC Integrated Inspection Report 05000348/2018003 and 05000364/2018003)
- ML17333A079 + (Reissue of Corrected Technical Specification Page 3.6.6-3)
- ML21243A316 + (Reissue of North Anna Power Station Units 1 and 2 (Report 2021005))
- W3F1-2004-0075, Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program + (Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program)
- ML14325A198 + (Reissue of Request for Additional Information 3.0.3-2 from Set 2014-01 for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application)
- ML20154F092 + (Reissue of Rev 2 to EMIP-102, Emergency Field Response)
- ML092520496 + (Reissue of September 1, 2009 Letter - Path Forward to Closure for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized - Water Reactors)
- ML20245F599 + (Reissue of Special Rept Re 3-h Fire Barrier Nonfunctional for Greater than 7 Days.Emergency Diesel Generator Ceiling Removed on 890707 for Const.Fireproofing Restored as of 890725.Compensatory Measures of Tech Spec 3.7.9 Established)
- ML21243A333 + (Reissue of Surry Power Station Units 1 and 2 (Report 2021005))
- ML18337A042 + (Reissue- Farley 2019 Exam Corporate Notification Letter)
- IR 05000269/2020004 + (Reissue- Oconee Nuclear Station Integrated Inspection Report 05000269/2020004, 05000270/2020004, 05000287/2020004)
- ML20012D867 + (Reissued ,Re Changes to 891214 Rev 1 to Updated Fsar,Correcting Ltr Date)