Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Reissue Harris 2021-301 Exam Report". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • IR 05000338/2022003  + (Reissue - North Anna Power Station – Integrated Inspection Report 05000338/2022003 and 05000339/2022003)
  • IR 05000338/2019010  + (Reissue - North Anna Power Station, Units 1 & 2 - Design Basis Assurance Inspection (Programs) Inspection Report 05000338/2019010 and 05000339/2019010)
  • ML17178A279  + (Reissue - Notice of Significant Public Meeting to Discuss NRCs End-of-Cycle Assessment of the Fermi Power Plant Performance for the 2016 Calendar Year)
  • IR 05000269/2018090  + (Reissue - Oconee Nuclear Station - NRC Inspection Report 05000269/2018090, 05000270/2018090, and 05000287/2018090)
  • IR 05000269/2018010  + (Reissue - Oconee Nuclear Station, Units 1,2 & 3 - NRC Design Bases Assurance Inspection (Programs)Report Number 05000269/2018010 and 05000287/2018010)
  • IR 05000266/2019412  + (Reissue - Point Beach Nuclear Power Plant - Cyber Security Inspection Report 05000266/2019412 and 05000301/2019412 (Cover Letter Only))
  • IR 05000282/2020002  + (Reissue - Prairie Island Nuclear Generating Plant - Integrated Inspection Report 05000282/2020002; 05000306/2020002; and 07200010/2020001)
  • ML17178A273  + (Reissue - Public Open House to Discuss NRC Activities, and 2016 End-of-Cycle Performance Assessment of Fermi Power Plant, Unit 2)
  • IR 05000280/2022004  + (Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004)
  • IR 05000250/2015004  + (Reissue - Turkey Point Nuclear Generating Station - NRC Integrated Inspection Report 05000250/2015004 and 05000251/2015004, October 1, 2015 to December 31, 2015)
  • IR 05000395/2017406  + (Reissue - Virgil C. Summer Nuclear Station - Cyber Security Follow-Up Inspection Report 05000395/2017406 - OUO Removed)
  • IR 05000395/2015004  + (Reissue - Virgil C. Summer Nuclear Station, Unit 1 - NRC Integrated Inspection Report 05000395/2015004)
  • ML22070A089  + (Reissue - Vogtle Electric Generating Plant Unit 3 & 4 - NRC Operator License Examination Report 05200025/2021301 and 05200026/2021301)
  • IR 05000424/2018002  + (Reissue - Vogtle Electric Generating Plant - Nuclear Regulatory Commission Integrated Inspection Report 05000424/2018002; 05000425/2018002; 05000424/2018502 and 05000425/2018502)
  • IR 05000390/2023002  + (Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002)
  • ML23227A032  + (Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002)
  • IR 05000390/2020301  + (Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301)
  • IR 05000369/2020302  + (Reissue - William B. McGuire, NRC Retake Written Examination Report 05000369/2020302 and 05000370/2020302)
  • ML19336C545  + (Reissue 2019013)
  • ML19266A656  + (Reissue Braidwood Inspection Report 2019002)
  • IR 05000346/2021090  + (Reissue Davis-Besse NRC Inspection Report (05000346/2021090) Preliminary White Finding)
  • IR 05000237/2020090  + (Reissue Dresden Nuclear Power Station, Units 2 and 3 - NRC Inspection Report 05000237/2020090 and 05000249/2020090)
  • ML22068A086  + (Reissue Dresden Nuclear Power Station, Units 2 and 3 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests, and Experiments) Baseline Inspection)
  • IR 05000348/2023440  + (Reissue Farley Units-Final Significance Determination for a Security-Related Greater than Green Finding, Nov and Assessment Followup LTR, IR 05000348/2023440 and 05000364/2023440 - Cover)
  • IR 05000341/2022010  + (Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010)
  • IR 05000382/2022001  + (Reissue IR 05000382/2022001)
  • IR 05000373/2024001  + (Reissue Lasalle County Station Integrated Inspection Report 05000373/2024001 and 05000374/2024001)
  • IR 05000265/2023040  + (Reissue Quad Cities Nuclear Power Station 95001 Supplemental Inspection Supplemental Report 05000265/2023040 and Follow Up Assessment Letter)
  • IR 05000254/2025002  + (Reissue Quad Cities Nuclear Power Station Integrated Inspection Report 05000254/2025002 and 05000265/2025002)
  • IR 05000327/2016004  + (Reissue Sequoyah Nuclear Plant - NRC Integrated Inspection Report 05000327/2016004 and 05000328/2016004)
  • ML15125A084  + (Reissue St. Lucie 2015-404 Public)
  • ML15121A667  + (Reissue St. Lucie 2015-404 Public)
  • ML22084A102  + (Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission)
  • ML24354A158  + (Reissue Technical Specification Pages for Amendment No. 170 to Facility Operating License No. NPF-90)
  • ML15121A214  + (Reissue Turkey Point 2015-401 to 2015-403 Public)
  • IR 05000424/2017410  + (Reissue Vogtle Electric Generating Plant - U.S. Nuclear Regulatory Commission Security Inspection Report 05000424/2017410 and 05000425/2017410)
  • IR 05000424/2019012  + (Reissue Vogtle Electric Generating Plant, Units 1 & 2 - NRC Temporary Instruction 2515/194 Inspection Report 05000424/2019012 and 05000425/2019012)
  • IR 05000390/2022003  + (Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003)
  • IR 05000348/2018003  + (Reissue for Joseph M. Farley Nuclear Plant - NRC Integrated Inspection Report 05000348/2018003 and 05000364/2018003)
  • ML17333A079  + (Reissue of Corrected Technical Specification Page 3.6.6-3)
  • ML21243A316  + (Reissue of North Anna Power Station Units 1 and 2 (Report 2021005))
  • W3F1-2004-0075, Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program  + (Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program)
  • ML14325A198  + (Reissue of Request for Additional Information 3.0.3-2 from Set 2014-01 for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application)
  • ML20154F092  + (Reissue of Rev 2 to EMIP-102, Emergency Field Response)
  • ML092520496  + (Reissue of September 1, 2009 Letter - Path Forward to Closure for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized - Water Reactors)
  • ML20245F599  + (Reissue of Special Rept Re 3-h Fire Barrier Nonfunctional for Greater than 7 Days.Emergency Diesel Generator Ceiling Removed on 890707 for Const.Fireproofing Restored as of 890725.Compensatory Measures of Tech Spec 3.7.9 Established)
  • ML21243A333  + (Reissue of Surry Power Station Units 1 and 2 (Report 2021005))
  • ML18337A042  + (Reissue- Farley 2019 Exam Corporate Notification Letter)
  • IR 05000269/2020004  + (Reissue- Oconee Nuclear Station Integrated Inspection Report 05000269/2020004, 05000270/2020004, 05000287/2020004)
  • ML20012D867  + (Reissued ,Re Changes to 891214 Rev 1 to Updated Fsar,Correcting Ltr Date)