Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML112371939 + (Reed College Responses to RAIs Dated August 15, 2011)
- ML052220248 + (Reed College Submission of Answer within 20 Days of the Issuance of the Generic Order (EA-05-007) That Was Dated July 19, 2005 and Issued by Mr. J. E. Dyer, Director, Office of NRR)
- ML103340514 + (Reed College Submittal of Self-Guarantee Letter with the Updated Decommissioning Costs)
- IR 05000288/2021201 + (Reed College U.S. Nuclear Regulatory Commission Routine Safety Inspection Report 05000288/2021201)
- IR 05000288/2023201 + (Reed College – U.S. Nuclear Regulatory Commission Safety Inspection Report 05000288/2023201)
- ML14279A025 + (Reed College, Annual Financial Test Per 10 CFR)
- ML101470412 + (Reed College, Approval of Request for an Extension of Response Time for the NRC Request for Additional Information Dated March 8, 2010)
- ML11272A128 + (Reed College, Change of Management Staff)
- ML11271A054 + (Reed College, Clarifications in Response to Phone Calls on July 7, 2011, and July 15, 2011)
- ML110040002 + (Reed College, E-mail from Stephen Frantz, Reed College to Alexander Adams, PM at NRC Reed License Amendment No. 8 Special Nuclear and Byproduct Material Possession Limits (Tac No. ME4086))
- ML24017A031 + (Reed College, Examination Confirmation Letter 50-288/Ol-24-01)
- ML19035A592 + (Reed College, Examination Confirmation Letter No. 50-288/OL-19-01)
- ML23020A937 + (Reed College, Letter Intended to Fulfill the 14-day Written Report Requirement of Technical Specification 6.7.2, Special Reports, Following Operation in Violation of Limiting Conditions of Operation)
- ML13310A307 + (Reed College, Letter Regarding Change to TS-6.5 C Inadvertently Left Out of the Communication Dated Oct. 3, 2013)
- ML23130A253 + (Reed College, Management Change Update)
- ML12194A009 + (Reed College, Notification of New College President (Level 1) Update)
- ML15054A447 + (Reed College, Notification of Personnel Change)
- ML20108F531 + (Reed College, Notification of Personnel Change Update)
- ML11130A109 + (Reed College, Notification of Responses to RAI TAC No. ME1583 by June 15, 2011)
- ML14241A425 + (Reed College, Notification of Security Plan Changes Update)
- ML11222A026 + (Reed College, Notification of Stainless Steel Clad Fuel Use as of 02/04/2011 at the Reed Research Reactor)
- ML091690341 + (Reed College, Project Manager Change Letter Effective 04/01/2009 to Geoffrey Wertz)
- ML12100A075 + (Reed College, Proposed Changes to Technical Specifications 3.4)
- ML19330E777 + (Reed College, Reed Research Reactor (Rrr), NRC Investigation Reports, 4-2016-022 and 4-2017-023, Choice Letter (EA-19-071) Dated November 19, 2019 (Public))
- ML14037A106 + (Reed College, Reply to Notice of Violation)
- ML103000126 + (Reed College, Reply to RAI TAC No. ME4086 Dated September 27, 2010)
- ML20335A566 + (Reed College, Requalification Plan)
- ML20335A565 + (Reed College, Requalification Plan)
- EPID:L-2020-NFO-0006 + (Reed College, Requalification Plan)
- ML20335A567 + (Reed College, Requalification Plan Changes)
- ML17139D353 + (Reed College, Request for Action Item from Reply to Notice of Violation Dated 01/26/2017)
- ML15027A297 + (Reed College, Request for Additional Information Regarding the Annual Financial Assurance Review of the Self Guarantee Test (TAC No. M79578))
- ML093430400 + (Reed College, Request for Additional Information Regarding Financial Qualifications for the Renewed License and Power Upgrade for the Reed College Research Reactor)
- ML101520062 + (Reed College, Request for Additional Information Regarding Reed Reactor Requalification Plan Revision (TAC No. M79578))
- ML100970471 + (Reed College, Request for Additional Information, Regarding the Reed College Triga Reactor Emergency Plan (TAC No. M79578))
- ML022400460 + (Reed College, Request for Original Ltr. of Credit Document)
- ML13149A016 + (Reed College, Request to Amend the Technical Specifications)
- ML24282A783 + (Reed College, Submittal of 2023 Financial Assurance for Cost of Decommissioning Activities Self-Guarantee Agreement)
- ML12228A379 + (Reed College, Submittal of Annual Operating Report July 1, 2011 - June 30, 2012)
- ML24257A189 + (Reed College, Submittal of Annual Report for the July 1, 2023 Through June 30, 2024)
- ML102861079 + (Reed College, Submittal of Decommissioning Costs for Research Reactor in 2010)
- ML17237A050 + (Reed College, Submittal of Follow Up Report Per Reed Technical Specification TS 6.7.2.a)
- ML102440042 + (Reed College, Submittal of Reactors Annual Report for September 1, 2009 - June 30, 2010)
- ML091760097 + (Reed College, Submittal of Technical Specification Amendment Request)
- ML12039A147 + (Reed College, Submittal of Technical Specifications Proposed for the Reed Research Reactor)
- ML21160A179 + (Reed College, Submitting Information Inadvertently Omitted from Letter Dated October 28, 2020 (ML21014A437))
- ML21160A178 + (Reed College, Submitting Information Inadvertently Omitted from Letter Dated October 28, 2020 (ML21014A437))
- ML19211C007 + (Reed College, Transmittal of Annual Report July 1, 2018 - June 30, 2019)
- ML16321A408 + (Reed Institute Dba Reed College - Financial Assurance for Cost of Decommissioning Activities)
- ML100820440 + (Reed Institutes Financial Statements June 30, 2009 and 2008)
- ML20106E379 + (Reed Reactor Facility - Annual Rept for 890901 - 900831)
- ML20079B352 + (Reed Reactor Facility - Annual Repts for 910901-940830. W/)
- ML20116E764 + (Reed Reactor Facility Administrative Procedures)