Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000374/LER-2021-002-01, Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip + (Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip)
- 05000374/LER-2021-002, Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip + (Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip)
- L-08-056, Reactor Protection System High Flux Trip Setpoint Calculation + (Reactor Protection System High Flux Trip Setpoint Calculation)
- ML20265F373 + (Reactor Protection System ISI Boundary Diagram)
- ML20261E212 + (Reactor Protection System Index. Sheet A00)
- ML20261K725 + (Reactor Protection System Instrument Engineering Diagram. Sheet 1 of 7)
- ML20261K730 + (Reactor Protection System Instrument Engineering Diagram. Sheet 2 of 7)
- ML20261K735 + (Reactor Protection System Instrument Engineering Diagram. Sheet 3 of 7)
- ML20261K741 + (Reactor Protection System Instrument Engineering Diagram. Sheet 4 of 7)
- ML20261K745 + (Reactor Protection System Instrument Engineering Diagram. Sheet 5 of 7)
- ML20261K750 + (Reactor Protection System Instrument Engineering Diagram. Sheet 6 of 7)
- 05000443/LER-2023-003, Reactor Protection System Manual Actuation Due to Failed Silicon Controlled Rectifiers + (Reactor Protection System Manual Actuation Due to Failed Silicon Controlled Rectifiers)
- ML20261E219 + (Reactor Protection System Notes,References,Valve Tabulations and Rod Scram Group Arrangements. Sheet A01)
- ML20261E243 + (Reactor Protection System Power Distribution. Sheet A04)
- ML20263R528 + (Reactor Protection System Power Supply)
- ML20261E224 + (Reactor Protection System Relay Tabulations. Sheet A02)
- ML20264A539 + (Reactor Protection System Scram Discharge Volume Isolation and Backup Valves,Recirculating Pumps a and B Trip Logic. Sheet A11)
- ENS 48760 + (Reactor Protection System Scram Signal Due to Scram Discharge Volume High Level)
- ML20264A536 + (Reactor Protection System Scram Solenoids. Sheet A10)
- ML20261E231 + (Reactor Protection System Switch Development & Relay Tabulations. Sheet A03)
- ML20261E276 + (Reactor Protection System Testability Card File Tabulations. Sheet A14)
- ML20264A545 + (Reactor Protection System Testability Power Supplies. Sheet A13)
- ML20261E281 + (Reactor Protection System Testability. Sheet A15)
- ML20261E287 + (Reactor Protection System Transient Test. Sheet A16)
- 05000313/LER-2023-002, Reactor Protection System Underpower Relay Test Failure Resulting in Condition Prohibited by Technical Specifications + (Reactor Protection System Underpower Relay Test Failure Resulting in Condition Prohibited by Technical Specifications)
- 05000255/LER-2008-003, Reactor Protection System and Auxiliary Feedwater System Actuation + (Reactor Protection System and Auxiliary Feedwater System Actuation)
- 05000255/LER-2019-001, Reactor Protection System and Auxiliary Feedwater System Actuation Due to Turbine Governor Valve Failure + (Reactor Protection System and Auxiliary Feedwater System Actuation Due to Turbine Governor Valve Failure)
- ENS 45375 + (Reactor Protection System and Primary Containment Isolation System Actuation After Placing Hpci System Inservice)
- ML23242A003 + (Reactor Protection System for the Virtual Ford Nuclear Reactor Designed-in Assurance)
- 05000443/LER-2009-001, Reactor Protection System on Steam Generator Low Water Level + (Reactor Protection System on Steam Generator Low Water Level)
- ML20259F871 + (Reactor Protection System. Sheet 1)
- ML20259F866 + (Reactor Protection System. Sheet 2.Rev Date Illegible)
- ML20259F848 + (Reactor Protection System. Sheet 23.Rev Date Illegible)
- ML20259F861 + (Reactor Protection System. Sheet 3.Rev Date Illegible)
- ML20259F856 + (Reactor Protection System. Sheet 4.Rev Date Illegible)
- ML20264B528 + (Reactor Protection System. Sheet 5 of 13)
- 05000455/LER-2010-001, Reactor Protection and Auxiliary Feedwater System Actuation Signals from Low Steam Generator Level Due to Inadequate Surveillance Testing + (Reactor Protection and Auxiliary Feedwater System Actuation Signals from Low Steam Generator Level Due to Inadequate Surveillance Testing)
- 05000318/LER-1981-050-03, Reactor Protective Sys Channel B Thermal Margin/Low Pressure Trip Unit Bypassed for Maint After Receiving Spurious Asymmetric Steam Generator Trips.Caused by Failed Signal Isolator + (Reactor Protective Sys Channel B Thermal Margin/Low Pressure Trip Unit Bypassed for Maint After Receiving Spurious Asymmetric Steam Generator Trips.Caused by Failed Signal Isolator)
- 05000318/LER-1982-046-03, Reactor Protective Sys Channel C Trip Unit for High Pressurizer Pressure Tripped. Caused by Failed Low Trip Bistable Power Supply.Power Supply Changed.Facility Change Request Written + (Reactor Protective Sys Channel C Trip Unit for High Pressurizer Pressure Tripped. Caused by Failed Low Trip Bistable Power Supply.Power Supply Changed.Facility Change Request Written)
- 05000317/LER-1981-032-03, Reactor Protective Sys Channel D Hi Power Thermal Margin/Low Pressure & Axial Shape Index Trip Units Bypassed for Maint.Caused by Oscillator Noise in Transmitter + (Reactor Protective Sys Channel D Hi Power Thermal Margin/Low Pressure & Axial Shape Index Trip Units Bypassed for Maint.Caused by Oscillator Noise in Transmitter)
- ML17324A246 + (Reactor Protective System)
- ML20262J275 + (Reactor Protective System Bin Assemblies Wiring Diagram)
- ML20262J271 + (Reactor Protective System Calibration & Indication Panel Assy)
- ML17340A003 + (Reactor Protective System Functional Diagram)
- ML17303A051 + (Reactor Protective System Functional Diagram)
- ML20262J257 + (Reactor Protective System Miscellaneous Schematic)
- ML17340A002 + (Reactor Protective System Schematic. Sheet 1 of 4)
- ML20262J269 + (Reactor Protective System Schematic. Sheet 2 of 4)
- ML20262J265 + (Reactor Protective System Schematic. Sheet 3 of 4)
- ML20266E388 + (Reactor Protective System Schematic. Sheet 4 of 4)
- ML17276B278 + (Reactor Protective System Schematic.Sheet 1 of 4)