Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19238A038 + (RIDM-ROP - Slides-2019 Presentation)
- ML062650414 + (RIII-2005-A-0062 Closure)
- ML22087A406 + (RIL-20-07 - Cognitive Task Analysis)
- ML20045F282 + (RIL-2001, Part 1, - Proceedings of NRC Annual Probabilistic Flood Hazard Assessment Research Workshops I-IV)
- ML20045F283 + (RIL-2001, Part 2, - Proceedings of NRC Annual Probabilistic Flood Hazard Assessment Research Workshops I-IV)
- ML20045F284 + (RIL-2001, Part 3, - Proceedings of NRC Annual Probabilistic Flood Hazard Assessment Research Workshops I-IV)
- ML20045F285 + (RIL-2001, Part 4, - Proceedings of NRC Annual Probabilistic Flood Hazard Assessment Research Workshops I-IV)
- ML22006A020 + (RIL-2020-06 -- Safety Evaluations of AA Suitability of Existing Review Guidance)
- RIL 2020-09, RIL-2020-09, International Workshop on Advanced Non-Light Water Reactor - Materials and Component Integrity + (RIL-2020-09, International Workshop on Advanced Non-Light Water Reactor - Materials and Component Integrity)
- ML21323A056 + (RIL-2021-15, Documentation Report for SSHAC Level 2: Site Response)
- RIL-2022-00, 5, NRC Technical Assessment of Zorita Materials Testing Results, Final May 2022 + (RIL-2022-005, NRC Technical Assessment of Zorita Materials Testing Results, Final May 2022)
- ML23093A156 + (RIL-2023-04 Paleoliquefaction Studies of the Central Virginia Seismic Zone)
- ML20357A006 + (RIL2020-12, International Workshop on Age-Related Degradation of Reactor Vessels and Internals)
- ML22095A236 + (RILXX-XX, Predicting High Energy Arcing Fault Zones of Influence for Aluminum Using a Modified Arc Flash Model, Draft)
- ML992920182 + (RIP50: Pilot Program Letter to NEI992920182)
- ML21210A319 + (RIPB Email Completeness Determination)
- ML20245E430 + (RIPB Workshop Agenda, Virtual Public Workshop, Enhancing Risk-Informed and Performance-Based Seismic Safety for Advanced Non-Light Water Reactors September 2 & 3, 2020)
- ML20241A151 + (RIPB Workshop Slides Set 1)
- ML20241A150 + (RIPB Workshop Slides Set 2)
- ML20241A152 + (RIPB Workshop Slides Set 3)
- ML23275A241 + (RIPE 10/5/23 Public Meeting NRC Presentation Slides Communicating Availability of TSG, Rev. 3 and NRCs Initial Assessment of NEI 4/19/23 Recommendations)
- ML23163A048 + (RIPE Comment Letter from NEI Dated 04-19-23 Re Risk-Informed Process for Evaluations)
- ML25216A241 + (RIPE Considerations)
- ML21320A103 + (RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides)
- ML21320A136 + (RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides)
- EPID:L-2021-NFN-0003 + (RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides)
- ML21245A421 + (RIPE Exemption to Eliminate Dafas Pre-submittal Meeting Summary)
- EPID:L-2021-LRM-0087 + (RIPE Exemption to Eliminate Dafas Pre-submittal Meeting Summary)
- NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information + (RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information)
- NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions + (RIPE License Amendment Request to Change Containment Air Temperature Actions)
- ML24113A096 + (RIPE Pre-Submittal Meeting Slides)
- ML20338A269 + (RIPE Presentation)
- ML20118C188 + (RIPE Presentation for Public Meeting May 2020)
- ML25216A237 + (RIPE Workshop - Session 1 RIPE Training (1))
- ML25216A236 + (RIPE Workshop - Sessions 3 Updated with Grip)
- ML25216A244 + (RIPE Workshop Slides - Diablo Canyon Updated)
- ML19056A528 + (RIS2002-22S1 NRC Public Mtg Presentation, Rev 0)
- ML21172A234 + (RISC - June 2021 - Rev.1)
- ML20338A270 + (RISC Presentations)
- ML18053A105 + (RISC Public Meeting February 20, 2018)
- ML18131A298 + (RISC Public Meeting May 3, 2018)
- ML20042D110 + (RISC- Crediting FLEX Feb 2020 Rev1)
- ML20056E213 + (RISK-BASED INSPECTION-DEVELOPMENT of Guidelines.Light Water Reactor (LWR) Nuclear Power Plant Components)
- ML20094L494 + (RISK-BASED Inspection - Development of Guidelines.General Document)
- ML20079D328 + (RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant)
- ML20034G902 + (RISK-BASED Inspection Guide for Three Mile Island Nuclear Station Unit 1)
- ML20098B331 + (RISK-BASED Maintenance Modeling.Prioritization of Maintenance Importances and Quantification of Maintenance Effectiveness)
- ML20116J450 + (RISK-BASED Technical Specifications: Development and Application of an Approach to the Generation of a Plant Specific REAL-TIME Risk Model.Appendices)
- ML20116J134 + (RISK-BASED Technical Specifications: Development and Application of an Approach to the Generation of a Plant Specific REAL-TIME Risk Model.Main Report)
- TSTF-498 + (RISK-INFORMED Containment Isolation Valve Completion Times (BAW-2461))
- TSTF-424 + (RISK-INFORMED HPSI Aot/Ct Extension - WCAP-15773)
- ML17233A327 + (RITF Attendee List)