Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16245A889 + (Proposed Regulatory Guide and Interim Standard Review Plan for License Renewal and a Related Branch Technical Position on Fatigue Evaluation Procedures)
- ML16176A171 + (Proposed Regulatory Guide and Standard Review Plan Chapter for Risk-Informed, Performance-Based Inservice Inspection)
- ML20207N931 + (Proposed Reissue of NPDES Permit MO-0000761,issued to C-E)
- ML12228A723 + (Proposed Relief Request 11-CN-001 for the Third Ten-Year Inservice Inspection Interval (TAC Nos. ME7277-ME7283))
- ML12250A401 + (Proposed Relief Request 11-MN-001)
- ML13010A554 + (Proposed Relief Request 12-MN-002)
- ML12258A363 + (Proposed Relief Request 12-MN-003)
- ML13294A609 + (Proposed Relief Request 12-MN-004)
- ML13176A400 + (Proposed Relief Request 13-CN-001, Use of Alternate Depth Sizing Criteria)
- ML14079A546 + (Proposed Relief Request 13-CN-003, Request for Alternative to the Requirement of IWB-2500, Table IWB-2500-1, Category B-A and Category B-D for Reactor Pressure Vessel Welds)
- ML13086A508 + (Proposed Relief Request 13-MN-001)
- ML14188C348 + (Proposed Relief Request 13-MN-002)
- ML13210A300 + (Proposed Relief Request 13-MN-002 Risk-Informed/Safety Based (Ris_B) ISI Alternative for Class 1 and 2 Piping)
- ML14328A249 + (Proposed Relief Request 13-MN-003)
- ML14295A532 + (Proposed Relief Request 14-CN-001, American Society of Mechanical Engineers (ASME) Section IX Volumetric Examination Requirements)
- ML15161A376 + (Proposed Relief Request 14-CN-002, Alternative to American Society of Mechanical Engineers (ASME) Section XI Requirements for Class 3 Buried Piping)
- ML15286A326 + (Proposed Relief Request 14-CN-003, American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code), Code Case N-695)
- ML15301A544 + (Proposed Relief Request 15-CN-001, Alternative Repair of a Main Steam System Braided Flex-Hose)
- ML15232A543 + (Proposed Relief Request 15-MN-001)
- JAFP-21-0075, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs + (Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs)
- LR-N22-0005, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs + (Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs)
- EPID:L-2022-LLR-0003 + (Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs)
- EPID:L-2021-LLR-0057 + (Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs)
- ML22003A002 + (Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair)
- EPID:L-2022-LLR-0006 + (Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair)
- RS-21-009, Proposed Relief Request Associated with Code Case N-921 + (Proposed Relief Request Associated with Code Case N-921)
- ML15210A750 + (Proposed Relief Request Associated with the Common Emergency Service Water (ESW) System Piping)
- ML18129A331 + (Proposed Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs)
- ML18129A323 + (Proposed Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs)
- EPID:L-2018-LLR-0071 + (Proposed Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs)
- LG-17-080, Proposed Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs + (Proposed Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs)
- LG-17-077, Proposed Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs + (Proposed Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs)
- ML20309B020 + (Proposed Relief Request Associated with N-16A Reactor Pressure Vessel Instrument Nozzle Repairs)
- EPID:L-2020-LLR-0144 + (Proposed Relief Request Associated with N-16A Reactor Pressure Vessel Instrument Nozzle Repairs)
- ML16358A696 + (Proposed Relief Request MC-SRV-NC-02, Alternate Testing for Pressurizer Power Operated Relief Valve (Porv) Block Valve 2NC-31B)
- ML18058A133 + (Proposed Relief Request MC-SRV-NS-02, Alternate to Performing Inservice Testing on Containment Narrow Range Pressure Inside Isolation Valve 2NSSV5550 (EPID No. L-2018-LLR0005))
- PLA-5416, Proposed Relief Request No RR-25, for Authorization to Use Code Case N-516-2 + (Proposed Relief Request No RR-25, for Authorization to Use Code Case N-516-2)
- ML090900514 + (Proposed Relief Request No. 09-MN-001 for the Third Ten-Year Inservice Inspection Interval)
- PLA-5740, Proposed Relief Request No. 29 to the Second 10-Year Inservice Inspection Program + (Proposed Relief Request No. 29 to the Second 10-Year Inservice Inspection Program)
- ML040960442 + (Proposed Relief Request No. 29 to the Second 10-Year Inservice Inspection Program)
- PLA-5744, Proposed Relief Request No. 31 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1, PLA-5744 + (Proposed Relief Request No. 31 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1, PLA-5744)
- ML041040011 + (Proposed Relief Request No. 31 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1, PLA-5744)
- ML042180182 + (Proposed Relief Request No. 3RR-12 to the Third 10-year Inservice Inspection Program)
- PLA-5783, Proposed Relief Request No. 3RR-13 to the Third 10-year Inservice Inspection Program for Plant Units 1 and 2 PLA-5783 + (Proposed Relief Request No. 3RR-13 to the Third 10-year Inservice Inspection Program for Plant Units 1 and 2 PLA-5783)
- PLA-6159, Proposed Relief Request No. 3RR-14 to Third 10-Year In-Service Inspection Program + (Proposed Relief Request No. 3RR-14 to Third 10-Year In-Service Inspection Program)
- ML112780095 + (Proposed Relief Request No. 3RR-18 to the Third 10-year Inservice Inspection Program for Susquehanna Sea Unit 2, PLA-6753)
- PLA-6847, Proposed Relief Request No. 3RR-19 to the Third 10-Year Inservice Inspection Program + (Proposed Relief Request No. 3RR-19 to the Third 10-Year Inservice Inspection Program)
- PLA-7014, Proposed Relief Request No. 3RR-20 to the Third 10-year Inservice Inpsection Program for Susquehanna Ses, Unit 2 + (Proposed Relief Request No. 3RR-20 to the Third 10-year Inservice Inpsection Program for Susquehanna Ses, Unit 2)
- PLA-5645, Proposed Relief Request No. RR-26 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1 + (Proposed Relief Request No. RR-26 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1)
- PLA-5724, Proposed Relief Request No. RR-27 to the Second 10-Year Inservice Inspection Program + (Proposed Relief Request No. RR-27 to the Second 10-Year Inservice Inspection Program)
- PLA-5741, Proposed Relief Request No. RR-30 to the Second 10-Year Inservice Inspection Program + (Proposed Relief Request No. RR-30 to the Second 10-Year Inservice Inspection Program)