Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds + (Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds)
- ML18019A195 + (Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination (CAC Nos. MF9923, MF9924, MF9925, MF9926, MF9927, and MF9928; EPID L-2017-LLR-0060))
- ML24057A037 + (Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI)
- NL-07-1523, Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii) + (Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii))
- ML20358A180 + (Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) - Alternative Requirements for A8ME Section XI Examination Coverage of Weldolet Branch Connection Welds (VEGP 3&4-PSI/ISI-ALT-15))
- BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test + (Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test)
- EPID:L-2018-LLR-0038 + (Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test)
- NL-11-0242, Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i), HNP-ISI-ALT-11 + (Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i), HNP-ISI-ALT-11)
- JAFP-16-0137, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Implementation of BWRVIP-05 at James A. FitzPatrick Nuclear Power Plant + (Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Implementation of BWRVIP-05 at James A. FitzPatrick Nuclear Power Plant)
- NL-15-1146, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Application of Dissimilar Weld Full-Structural Weld Overlays + (Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Application of Dissimilar Weld Full-Structural Weld Overlays)
- ML25062A127 + (Proposed Alternative in Accordance with 10 CFR 50.55a (z)(2) - Complying with Requirement Would Result in Hardship or Unusual Difficulty Without a Compensating Increase in the Level of Quality and Safety)
- NL-08-0877, Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i) Application of Dissimilar Weld Full-Structural Weld Overlays Alternative Lsi ALT-08-02 Version 1 + (Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i) Application of Dissimilar Weld Full-Structural Weld Overlays Alternative Lsi ALT-08-02 Version 1)
- RA-19-0138, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections + (Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections)
- EPID:L-2019-LLR-0072 + (Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections)
- BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination + (Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination)
- L-MT-14-021, Proposed Alternative in Accordance with 10 CFR 50.55a Request RR-008 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval + (Proposed Alternative in Accordance with 10 CFR 50.55a Request RR-008 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval)
- RA-22-0308, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner + (Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner)
- EPID:L-2022-LLR-0089 + (Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner)
- NL-07-1320, Proposed Alternative or Application of Pressurizer Nozzle Full-Structural Weld Overlays + (Proposed Alternative or Application of Pressurizer Nozzle Full-Structural Weld Overlays)
- ML092300394 + (Proposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections)
- RS-08-156, Proposed Alternative to 10CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections + (Proposed Alternative to 10CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections)
- RA-20-0353, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1) + (Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1))
- EPID:L-2021-LLR-0014 + (Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1))
- NOC-AE-190036, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) + (Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1))
- NOC-AE-030015, Proposed Alternative to ASME Boiler and Pressure Vessel Code Section Xl Containment Visual Inspection Requirements (Relief Request RR-ENG-IWE-07) + (Proposed Alternative to ASME Boiler and Pressure Vessel Code Section Xl Containment Visual Inspection Requirements (Relief Request RR-ENG-IWE-07))
- JAFP-17-0010, Proposed Alternative to ASME Code Requirements for Weld Overlay Repair, RR-21 + (Proposed Alternative to ASME Code Requirements for Weld Overlay Repair, RR-21)
- CNRO-2002-00017, Proposed Alternative to ASME Code Requirements for Weld Repairs + (Proposed Alternative to ASME Code Requirements for Weld Repairs)
- CNRO-2002-00008, Proposed Alternative to ASME Code Requirements for Weld Repairs + (Proposed Alternative to ASME Code Requirements for Weld Repairs)
- ML21335A106 + (Proposed Alternative to ASME Code W, Section XI, Subsection Iwl Regarding Containment Post-Tensioning System Inservice Inspection Requirements)
- ML21292A330 + (Proposed Alternative to ASME Code for CoC 1004 - RAI)
- ULNRC-06093, Proposed Alternative to ASME Code, Section XI Requirements, Which Extends Reactor Vessel In-service Inspection Frequency from 10 to 20 Years (Relief Request I3R-17) + (Proposed Alternative to ASME Code, Section XI Requirements, Which Extends Reactor Vessel In-service Inspection Frequency from 10 to 20 Years (Relief Request I3R-17))
- ML18282A030 + (Proposed Alternative to ASME Code, Section XI, Regarding Charging Pipe Visual Inspection)
- CNRO-2002-00054, Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations + (Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations)
- CNRO-2002-00058, Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations + (Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations)
- CNRO-2002-00052, Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations + (Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations)
- CNRO-2002-00020, Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations + (Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations)
- CNRO-2002-00006, Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations + (Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations)
- CNRO-2002-00007, Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations + (Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations)
- NOC-AE-06002000, Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43) + (Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43))
- ML061280504 + (Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43))
- ML17251A895 + (Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer Response to Request for Additional Information)
- NOC-AE-07002177, Proposed Alternative to ASME Section XI Requirements for Weld Overlay Hold-Time (RR-ENG-2-48) + (Proposed Alternative to ASME Section XI Requirements for Weld Overlay Hold-Time (RR-ENG-2-48))
- ML071770351 + (Proposed Alternative to ASME Section XI Requirements for Weld Overlay Hold-Time (RR-ENG-2-48))
- ML16355A346 + (Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(Z)(1))
- L-PI-03-009, Proposed Alternative to Align Unit 1 and Unit 2 Ten Year Inspection & Testing Interval Dates + (Proposed Alternative to Align Unit 1 and Unit 2 Ten Year Inspection & Testing Interval Dates)
- L-05-127, Proposed Alternative to American Society of Mechanical Engineers Code Section XI Visual Examination Requirements Associated with Third Ten Year Interval Inservice Inspection Program (Request No. BV3-IWE1-4) + (Proposed Alternative to American Society of Mechanical Engineers Code Section XI Visual Examination Requirements Associated with Third Ten Year Interval Inservice Inspection Program (Request No. BV3-IWE1-4))
- ML21242A298 + (Proposed Alternative to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants)
- L-06-090, Proposed Alternative to American Society of Mechanical Engineers, Code Pump Test Requirements (Request No. PRR-12) + (Proposed Alternative to American Society of Mechanical Engineers, Code Pump Test Requirements (Request No. PRR-12))
- L-05-164, Proposed Alternative to American Society of Mechanical Engineers Code Section XI Visual Examination Requirements Associated with Third Ten-Year Interval Inservice Inspection Program + (Proposed Alternative to American Society of Mechanical Engineers Code Section XI Visual Examination Requirements Associated with Third Ten-Year Interval Inservice Inspection Program)
- L-06-097, Proposed Alternative to American Society of Mechanical Engineers Code System Leakage Test Requirements (Request No. BV3-PT-1) + (Proposed Alternative to American Society of Mechanical Engineers Code System Leakage Test Requirements (Request No. BV3-PT-1))
- L-07-039, Proposed Alternative to American Society of Mechanical Engineers Code Section XI Repair Requirements (Request No. BV1-PZR-01) + (Proposed Alternative to American Society of Mechanical Engineers Code Section XI Repair Requirements (Request No. BV1-PZR-01))
- L-06-043, Proposed Alternative to American Society of Mechanical Engineers Code Section XI Examination Requirements (Request No. BV3-RV-2) + (Proposed Alternative to American Society of Mechanical Engineers Code Section XI Examination Requirements (Request No. BV3-RV-2))